USCGC Maple Fantail awning fabrication and installation
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
70Z08526Q0000007
NAICS
238190
PSC
J020
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 23, 2026
Response due
July 29, 2026
Place of performance
Atlantic Beach, NC
Description
AWNING FABRICATION AND INSTALLATION FOR CGC MAPLE
POC- CWO Tim Raniszewski 707.835.6613
2301 E. Fort Macon Rd, Atlantic Beach NC 28512
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials,
equipment, and safety equipment as required to design, build and install fantail awning
aboard USCGC MAPLE located at SFO Fort Macon 2301 E. Fort Macon Rd, Atlantic Beach
NC 28512
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance
the contractor shall commence work NLT 7 days after notice to proceed and work diligently
to complete the entire work ready for use 21 days after contract award.
3. SCOPE OF WORK: The Offeror shall:
3.0.1: Design and fabricate a replacement awning covering using existing framework.
Please Note:
1. Sunshade will cover the existing structure on the aft deck of the ship, with an
approximate surface area of 43’x24’.
2. Sunshade will be reinforced at all chafe and wear points IAW ref a.
3. Awning must be constructed and installed in accordance with ref a.
4. Canvas material and fastening hardware shall be long-term strength,
UV/heat/weather resistant.
5. All work will be conducted in accordance to and in compliance with any/all
applicable local, state, and federal environmental regulations.
-- 1 of 6 --
6. All materials and fasteners installed throughout the entirety of this Scope of Work
shall be installed using materials that are conducive to a salt air environment and
are corrosion resistant.
7. Contractor shall dispose of unused materials/ debris offsite IAW any/all Federal,
State, and/or local regulations.
3.1 References:
a. Coast Guard Drawing 225-WLB-613-002, 2010, Fantail Awning Construction &
Installation.
b. Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550),
2022, Fire Prevention and Response
c. Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 740),
2022 Welding and Allied Processes.
d. Surface Forces Logistics Center Standard Specification 0000, (SFLC Std Spec 0000)
2022 Edition, General Requirements
4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities
before submitting bids. Interested parties shall make arrangements for a site visit BMC
Kevin Kramer, POC( Kevin.D.Kramer@uscg.mil) (757-208-3174)
5. DESIGNATED CONTRACTING OFFICER’S Point of Contact: The designated
contracting officer’s Point of Contact for this project is BMC Kevin Kramer
Kevin.D.Kramer@uscg.mil (757) 208-3174. Inquiries concerning any phase of the
specification before or after award shall be made to Kevin Kramer @ 907-942-3022.
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such
other steps as may be reasonably necessary to ascertain the nature and location of the
work, the general and local conditions which can affect the cost of the work thereof.
Failure to do so will not relieve bidders from responsibility for estimating properly the
difficulty or cost of successfully performing the work. The government will assume no
responsibility for any understanding or misrepresentations concerning conditions made by
any of its officers or agents prior to the execution of the contract, unless included in the
request for quotes, the specification or related documents.
-- 2 of 6 --
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify BMC Kevin
Kramer of his intended start date. The work shall be completed in accordance with all
listed references.
8. ORAL MODIFICATION: No oral statement of any person other than the contracting
officer shall in any manner or degree modify, or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and
by workmen thoroughly experienced in the required trades. The work shall be supervised
by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: None.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall
be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on
Saturday, Sunday, holidays or outside Mon-Thur 0700-1300, must submit their request in
writing to BMC Kevin Kramer for approval consideration. The contractor shall allow ample
time to enable satisfactory arrangements to be made by the government for inspecting the
work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative
to arrange for inspection/acceptance of work.
14. Acceptance Criteia:
a. Build and installation of awning, using existing framework.
b. Awning must be constructed and installed in accordance with ref a.
-- 3 of 6 --
c. Materials and fasteners shall be constructed of WEBLON woven black polyester
vinyl coated blanket or similar, reinforced with grommets 6” on center and
reinforced lace strips as needed. Material to be 15 oz. weight, water and milder
reistant and must meet or exceed CSFM, Reg F-06901. Lace material to be
“neoline” polyester cord or similar, 3/16 diamerter, 100% core and jacket, 460#
tensile strength. Canvas and cord material quantity in reference a. is
approximate. Contractor must verify actual lengths necessary to complete
work.
15. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor
shall provide a detailed list of all employees to BMC Kevin Kramer Representative five (5)
days prior to commencing work. The employee list shall contain the employee’s full name,
date and place of birth, current address and last four (4) of SSN. Sector Field Office Fort
Macon Security Officer will be given a copy of the employee list. Each contractor provided
vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the
vehicle. A valid state license plate and safety inspection sticker is required. All vehicles
operated on government property shall be maintained in a good state of repair.
16. SAFETY REQUIREMENTS:
a. All contractors work…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238190)
Z1DA--542-21-113 | Correct FCA Deficiencies – Repair Water Penetration | NCO 4 Construction East (VA-26-00020634) (VA-26-00020634)
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due September 2, 2026
Monument Sign - Natick Soldiers Systems Center
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 7, 2026
Z--Replacement of Kettles 7A & 7B
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due July 28, 2026
Z--Grand Coulee Washington Power Plant Turbine Repair
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 5, 2026
Z--Replacement of Kettles 7A & 7B
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due July 28, 2026
Z--Hungry Horse Power Plant Turbine Runner Cavitation
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 4, 2026