Description
BIDS SHEET
ITEM
NO. COST ITEMS
ESTIMATED
QUANTITY UNIT UNIT PRICE
ESTIMATED
AMOUNT
1 Mobilization & Demobilization Job
2 Demolition Existing Kettles Hrs
3 Excavate & Grade CY
4 Compact Subgrade SF
5 Compacted fill CY
6 Concrete, including thrust blocks & deadmen CY
7 12" PVC Drain Pipe LF
8 Connect Drain Pipe to Existing Job
9 8" PVC Supply Pipes LF
10 Connect Supply Pipe to Existing Job
11 Pressure test pipes Job
12 8" Supply Valves, Butterfly & Gate Ea
13 Sluice Gate Assembly, 12" Ea
14 Screens SF
15 Metal Grating SF
16 Guard Rails/fence LF
17 Materials Testing Days
18 Haul Excess Material CY
Subtotal
OH&P
Bonds & Insurance
BASE BID TOTAL
INKS DAM KETTLES 7A & 7B
Contractor shall take off quantities from drawings and specifications. Provide breakdown of pricing
Page 1 of 1
-- 1 of 1 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238190)
USCGC Maple Fantail awning fabrication and installation
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 29, 2026
Z1DA--542-21-113 | Correct FCA Deficiencies – Repair Water Penetration | NCO 4 Construction East (VA-26-00020634) (VA-26-00020634)
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due September 2, 2026
Monument Sign - Natick Soldiers Systems Center
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 7, 2026
Z--Replacement of Kettles 7A & 7B
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due July 28, 2026
Z--Grand Coulee Washington Power Plant Turbine Repair
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 5, 2026
Z--Hungry Horse Power Plant Turbine Runner Cavitation
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 4, 2026