Description
1
STATEMENT OF WORK
MAXWELL PUMPING STATION
FLINT HILLS NATIONAL WILDLIFE REFUGE
I. GENERAL CONDITIONS
A. The Contractor shall provide all material and labor required to install a submersible
pump with underground piping to an existing underground plastic pipe. Flint Hills
NWR will provide heavy equipment and all dirt work necessary to complete the
project as outlined in Section VIII.
B. The Contractor shall be responsible for installing all materials described in Section
VIII.
C. The Contractor shall have all certificates and licenses required by law for the
execution of the work, and shall comply with all Federal, State, or local laws,
ordinances, rules, regulations, and codes relating to performance of the work.
D. Typical working hours are 7:30 am to 4:00 pm Monday through Friday. Any work
that deviates from this schedule or during a holiday requires Contracting Officer
approval. These times can be negotiable during the pre-construction meeting.
E. Any conflict or overlap of Kansas Department of Environmental Quality, EPA,
OSHA, and other applicable Federal, State, and local regulations, the Contractor shall
follow the most stringent provision.
F. Safety
1. The Contractor shall assume full responsibility and liability for compliance
with all applicable Federal, State, and local regulations pertaining to the
protection of workers, visitors to the site, and persons occupying areas
adjacent to the site, including the provisions of 29CFR1910 and 29CFR1926
of the Code of Federal Regulations. The Contractor shall hold harmless the
Government for failure to comply with any applicable safety or health
regulations on the part of himself, his employees, or his subcontractors.
2. Every Contractor employee shall be responsible for complying with
applicable safety requirements, wearing prescribed safety equipment, and
preventing avoidable accidents and property damage.
3. The Contractor shall provide and maintain a basic first aid kit for use of the
workers. The kit shall contain first aid supplies in type and quantity
-- 1 of 16 --
2
commensurate with type and size of project and the work force, with items
necessary for first aid treatment of all injuries. The Contractor shall
advise all workers of the location of first aid supplies.
4. The Contractor shall post the telephone numbers of nearest hospital,
ambulance service, and fire station in a conspicuous location. The
Contractor shall advise all workers of the location of telephone numbers.
Communication devices shall be made available and be ready at the work
site to alert others in case of emergencies.
5. The Contractor shall provide at least one nonfreezing type fire
extinguisher in each field office, workshop, work site, and storage
shed at the work site. These fire extinguishers shall be placed in
locations readily accessible by workers.
II. WORK SITE CONDITIONS
A. The site of the work is at Flint Hills National Wildlife Refuge and is approximately 2.5
miles North of Hartford, Kansas. See attachments for project location map.
B. Prospective bidders are urged to visit the site and become familiar with existing
conditions and ascertain the conditions which affect the work. Failure of the
successful bidder to visit the site prior to submitting a bid or proposal on this work
will not relieve the successful bidder from completing the project at the bid price.
Prospective bidders must make site inspection arrangements with the Refuge
Manager, Mike Assenmacher, at Flint Hills National Wildlife Refuge, 530 W
Maple Rd, Hartford, KS, Phone: (406) 366-0537.
C. Site includes work in forested area that may impede construction. The Contractor
shall visit the site prior to bidding to see obstacles.
D. The Contractor will connect to existing underground plastic pipe.
E. Protection Environmental
1. Pollution Control
a. The Contractor shall abate and control all environmental pollution
arising from construction activities by complying with all applicable
Federal, State, and local laws and regulations concerning environmental
pollution control and abatement, as well as the specified requirements
in this contract. The Refuge Manager, or his designee, will inspect
the site regularly for compliance.
b. Compliance with this requirement by any and all subcontractors shall be
the responsibility of the Contractor.
-- 2 of 16 --
3
2. Prevention of Water Pollution
a. During construction the Contractor shall comply with all applicable
Federal, State, and local laws and regulations concerning the control
and abatement of water pollution.
b. The Contractor's construction activities shall be performed by
methods that will prevent entrance or accidental spillage of solid
and/or liquid matter, contaminants, debris, and other objectionable
pollutants and wastes into streams, flowing or dry watercourses,
lakes, ponds, and underground water sources. Such pollutants and
wastes include, but are not limited to, refuse, garbage, cement,
concrete, sanitary waste, industrial waste, radioactive substances,
oil and other petroleum products, aggregate processing tailings,
mineral salts, and thermal pollution.
c. At the completion of construction, the Contractor shall remove and
dispose of all pollutants, wastes, and objectionable material at a site
located off the Government property.
d. The Contractor is responsible for the proper disposal of such materials in
accordance with applicable local, State, and Federal regulations.
e. Sanitary facilities, such as chemical toilets, shall be located far enough
from wells, live streams, or ponds to prevent water pollution.
3. Noise Pollution
a. The Contractor shall comply with all applicable Federal, State and local
laws, temporary use permit, orders, and regulations concerning the
prevention, control, and abatement of excessive noise.
4. Solid Waste
a. The Contractor shall dispose all non-hazardous waste in an EPA
approved landfill.
b. The Contractor shall remove any dust, dirt, and debris caused during th…