USNS SHIP Voyage Repair Availability
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
N6817126QN053
NAICS
336611
PSC
J998
Posted
July 27, 2026
Response due
August 5, 2026
Place of performance
UNKNOWN, N/A
Description
USNS MEDGAR EVERS
(T-AKE 13)
0000 CONTRACT NO. N332205XXXX
ITEM NO. 0001 CATEGORY "NSP" 02/24/2026
TAOE-
SCOPE_GENERAL_REQUIREMENTS_AND_DEFINITIONS_VR_Package
TBD
0001 - 1
1.0 ABSTRACT
This item describes the intent, scope, general
requirements, and definitions that apply to this work package.
2.0 REFERENCES: None
3.0 ITEM LOCATION/DESCRIPTION
3.1 Aspects of the ship and shore support facilities as
described in the work package.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES: None
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK REQUIRED
7.1 Scope
7.1.1 This work package, the accompanying contract,
and contract guidance drawings define the scope of work to be
performed.
7.1.2 In case of a difference or conflict between the
referenced contract guidance drawings and the work items, the
work items shall govern. Any omissions from the drawings, or
from this work package, of details or work that is necessary to
fulfill the intent of this work package or that is customarily
performed in the industry, do not relieve the contractor from
his/her obligation to perform such work. Notify the
Administrative Contracting Officer (ACO) of any such issues as
soon as the work package is reviewed, or such conflict is
identified.
7.1.3 Provide labor and materials necessary to
complete work items in the work package. Tag-out, (rearrange
-- 1 of 59 --
0000 CONTRACT NO. N332205XXXX
ITEM NO. 0001 CATEGORY "NSP" 02/24/2026
TAOE-
SCOPE_GENERAL_REQUIREMENTS_AND_DEFINITIONS_VR_Package
TBD
0001 - 2
for order of activity) rig and unrig, connect and disconnect
stage and un-stage, and remove, replace, and relocate any
interference necessary to accomplish each work item in the work
package. Unless specifically identified as government-furnished
equipment or material (GFE/GFM), provide all equipment,
material, and labor necessary to perform the contract.
7.1.4 Perform inspections, tests, and trials to
demonstrate total compliance with the work package requirements.
7.2 General Requirements
7.2.1 Within the scope of this work package, complete
each work item in accordance with appropriate GTRs as found in
reference 2.1.
7.2.2 Where a work item has special requirements that
differ from the GTRs, the requirements of the work item shall
govern. Where there are no special requirements invoked, then
the GTRs shall govern.
7.2.3 Work items and contract guidance drawings
provided by the Government to the contractor do not fully
describe all work required to meet regulatory requirements.
Ensure that work complies with regulatory requirements in
accordance with reference 2.1, GTR No. 1. The cost of meeting
regulatory requirements shall be borne by the contractor.
Provide the scheduling of American Bureau of Shipping (ABS)
surveys and the cost and scheduling of all other regulatory
services. The Government shall bear the costs of ABS ship
surveys. Where a work item requires the contractor to develop
working drawings and obtain ABS review and approval of those
working drawings, the contractor shall bear these costs.
7.2.4 Where a work item does not cite any particular
GTR, identify and perform in accordance with relevant GTRs. If
any question arises as to the applicability, notify the on-site
OMT REP and request further guidance.
USNS MEDGAR EVERS
(T-AKE 13)
-- 2 of 59 --
0000 CONTRACT NO. N332205XXXX
ITEM NO. 0001 CATEGORY "NSP" 02/24/2026
TAOE-
SCOPE_GENERAL_REQUIREMENTS_AND_DEFINITIONS_VR_Package
TBD
0001 - 3
7.2.5 Provide all necessary compliance and approval
certificates and documents and submit them to the OMT REP. This
includes but is not limited to:
a. Original stamped documents of each approved
drawing for work performed during the
availability.
b. Original stamped documents of each regulatory
test and inspection performed during the
availability.
c. A chronological file of all correspondence
between the contractor (or sub-contractor) and
all regulatory bodies.
d. Prepare and submit reports, drawings, and other
documents required per the above paragraphs in
accordance with the Contract Data Requirements
List (CDRL).
7.3 Definitions: The following terms in alphabetical order
shall have meanings as indicated below:
7.3.1 Administrative Contracting Officer (ACO) –
Means the MSC designated contracting officer.
7.3.2 Article – means a separately lettered part of a
work item of the work package. Articles in different items may
bear the same number; hence, to identify an article completely,
the item of which it is a part must be specified.
7.3.3 As-designed – means a condition meeting the
original system and manufacturer’s design.
7.3.4 As-found – means the condition which was found
upon close inspection by the contractor. The resulting report
will discuss all major components and sub-components as
functional or degraded and needing specified repairs. When
USNS MEDGAR EVERS
(T-AKE 13)
-- 3 of 59 --
0000 CONTRACT NO. N332205XXXX
ITEM NO. 0001 CATEGORY "NSP" 02/24/2026
TAOE-
SCOPE_GENERAL_REQUIREMENTS_AND_DEFINITIONS_VR_Package
TBD
0001 - 4
reporting an as-found condition, the information shall be stated
clearly, concisely, and with enough detail so as to allow for
preparation of a work statement and estimate. Include annotated
sketches, graphs, and photographs when necessary to make a
report clearly understandable to the OMT REP. Identify actual
readings/dimensions taken. When a work item does not require a
report, and one is determined to be necessary in order to
produce a reliable or complete repair, submit one legible copy,
in hard copy or electronic media, of a report with supporting
data as early as possible in the contract period, so as to have
the additional work completed within the original contract
period.
7.3.5 As-released – means the condition of the item
that exists at the time it is returned to the government.
Include annotated sketches, graphs, and photographs when
necessary to make a report clearly understandable to the OMT
REP. Identify actual readings/dimensions…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 336611)
Rigging, Crane, and Transportation Service; provide
DEPT OF DEFENSE · Solicitation · due August 24, 2026
YON-285 Outfit
DEPT OF DEFENSE · Solicitation · due July 28, 2026
52000QR260026976- CGC Earl Cunningham and CGC Frederick Mann Underwater Hull Inspect, Clean & Zinc Renewal
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 3, 2026
CGC ABBIE BURGESS CO2 INSPECTION / HOSE REPLACEMENT
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 31, 2026
Maintenance and Repair of SWFPAC 33HS-64PB-78PB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 31, 2026
USS RUSHMORE (LSD-47) 7C1 SRA 52pkg
DEPT OF DEFENSE · Solicitation · due July 29, 2026