USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
N5523626R0009
NAICS
333618
PSC
2815
Posted
June 18, 2026
Response due
July 1, 2026
What this opportunity is
The Department of Defense is seeking to procure long lead time material for the USS BOXER (LHD-4) from Fairbanks Morse Defense, as indicated in the sole source Combined Synopsis/Solicitation (RFP N5523626R009). This opportunity falls under NAICS code 333618, which pertains to Other Engine Equipment Manufacturing. Since this is a sole source procurement, it is not open for competitive bidding, making it suitable primarily for the identified vendor. Small businesses should note that this notice is for tracking purposes rather than bidding.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 ? Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.