WMF Rob Brook Bridge Replacement

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
12445526Q0070
NAICS
237310
PSC
Y1LB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 18, 2026
Response due
July 1, 2026
Place of performance
Campton, NH

What this opportunity is

The Department of Agriculture is seeking a total small business set-aside for the WMF Rob Brook Bridge Replacement project, classified under NAICS 237310 for highway, street, and bridge construction. The project involves the demolition of an existing 28-foot bridge and the construction of a new 44-foot bridge within the White Mountain National Forest, with a project magnitude between $1,000,000 and $5,000,000. This combined synopsis/solicitation requires interested small businesses to submit quotations directly, as no separate solicitation will be issued; therefore, careful review of all provided materials is essential to ensure compliance.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Solicitation Amendment 0001, Issued 18 June 2026, implements the following changes: 1) Statement of Work (SOW) is updated via attachment C05_1-12445526Q0070_0001-Att1-SOW_Rev1. The following changes have been made: "Tree cutting shall only be performed within the following calendar window: November 1 and April 14th" is revised and replaced with: "Tree cutting shall only be performed within the following calendar window: Trees shall be cut between August 16th to April 14th." All other solicitation documents, terms, and conditions remain unchanged.. ------------------------------------------------------------------------------- This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445526Q0070 is issued as a Request for Quotation (RFQ) for WMF Rob Brook Bridge Replacement. PROJECT SUMMARY: The USFS is pursuing a Purchase Order for the reconstruction of Rob Brook Road Bridge on the White Mountain National Forest. Work includes but is not limited to demolition of the existing 28' bridge structure, proper disposal of all materials, and construction of the new 44' bridge. Services shall be performed by the awardee in accordance with the specifications, terms, and conditions of this solicitation, including those found in the solicitation attachments. SET-ASIDE: This solicitation is set aside 100% for Small Business entities under NAICS 237310 - Highway, Street, and Bridge Construction (Size Standard: $45M). PROJECT LOCATION: Saco Ranger District, White Mountain National Forest. See solicitation and its attachments for additional location details. PROJECT MAGNITUDE: between $1,000,000 and $5,000,000 SOLICITATION POINT OF CONTACT: Matthew (Matt) Killian, Contracting Officer matthew.killian@usda.gov PLEASE REVIEW ALL SOLICITATION MATERIALS IN-FULL, INCLUDING ALL INSTRUCTIONS TO OFFERORS, PRIOR TO SUBMITTING A QUOTATION. LATE QUOTATIONS AND/OR QUOTATIONS THAT DO NOT COMPLY WITH SAID INSTRUCTIONS MAY BE DETERMINED NON-REPONSIVE AND ELIMINATED FROM AWARD CONSIDERATION.

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237310)