Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC -

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
36C24226R0084
NAICS
238220
PSC
Z1DA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 6, 2026
Response due
August 6, 2026

What this opportunity is

The Department of Veterans Affairs is soliciting bids for the replacement of a boiler stack at the Rome Community Based Outpatient Clinic in New York. This project is set aside for Service-Disabled Veteran-Owned Small Businesses, making it a suitable opportunity for eligible firms. The notice type is a solicitation, indicating that bidders will track the solicitation and submit a bid when the solicitation is released, rather than responding to a pre-solicitation notice. The project involves various construction tasks, including masonry, metals, and thermal protection, as outlined in the VHA Master Specifications.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

BID DOCUMENTS SPECIFICATIONS Replace Boiler Stack Rome CBOC VA Project No. 528A7-18-707 VA Community Based Outpatient Clinic Rome, NY FEB 03, 2026 DEPARTMENT OF VETERANS AFFAIRS -- 1 of 796 -- 02-03-2026 00 01 15 - 1 VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 SECTION NO DIVISION AND SECTION TITLES DATE DIVISION 00 - SPECIAL SECTIONS 00 01 15 List of Drawing Sheets 05-20 DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 General Requirements 11-21 01 32 00 Construction Documentation 01-23 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24 01 33 23 Shop Drawings, Product Data, and Samples 06-25 01 35 26 Safety Requirements for Major Projects 05-24 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 DIVISION 02 – EXISTING CONDITIONS 02 21 13 Site Surveys 12-23 02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 DIVISION 03 – CONCRETE 03 30 53 (Short-Form) Cast-in-Place Concrete 01-21 03 51 16 Gypsum Concrete Roof Decks 01-21 03 52 00 Lightweight Concrete Roof Insulation 01-21 03 55 11 Gypsum Concrete Floor Decks 01-21 DIVISION 04 – MASONRY 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 08-17 DIVISION 05 – METALS 05 12 00 Structural Steel Framing 11-18 05 21 00 Steel Joist Framing 11-18 05 31 00 Steel Decking 01-21 05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18 DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 01 50.19 Preparation for Re-Roofing 02-16 -- 2 of 796 -- 02-03-2026 00 01 15 - 2 SECTION NO DIVISION AND SECTION TITLES DATE 07 22 00 Roof and Deck Insulation 01-21 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16 07 60 00 Flashing and Sheet Metal 07-14 DIVISION 08 - OPENINGS 08 11 13 Hollow Metal Doors and Frames 01-21 DIVISION 09 – FINISHES 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 91 00 Painting 01-16 DIVISION 10 – SPECIALTIES (NOT USED) DIVISION 11 – EQUIPMENT (NOT USED) DIVISION 12 – FURNISHINGS (NOT USED) DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED) DIVISION 14– CONVEYING EQUIPEMENT (NOT USED) DIVISION 21- FIRE SUPPRESSION (NOT USED) DIVISION 22 – PLUMBING (NOT USED) DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 23 05 10 Common Work Results for Boiler Plant and Steam Generation 04-20 23 05 11 Common Work Results for HVAC 02-20 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 03-23 23 11 23 Facility Natural-Gas Piping 04-20 23 21 11 Boiler Plant Piping Systems 03-24 23 22 13 Steam and Condensate Heating Piping 03-24 23 22 23 Steam Condensate Pumps 04-20 23 51 00 Breechings, Chimneys, and Stacks 04-20 DIVISION 25 – INTEGRATED AUTOMATION (NOT USED) DIVISION 26 – ELECTRICAL (NOT USED) DIVISION 27 – COMMUNICATIONS (NOT USED) DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED) -- 3 of 796 -- 02-03-2026 00 01 15 - 3 SECTION NO DIVISION AND SECTION TITLES DATE DIVISION 31 – EARTHWORK 31 20 11 Earthwork (Short Form) 10-12 DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED) DIVISION 33 – UTILITIES (NOT USED) DIVISION 34 – TRANSPORTATION (NOT USED) DIVISION 48 – ELECTRICAL POWER GENERATION (NOT USED) SECTION 00 01 15 LIST OF DRAWINGS The drawings listed below accompanying this specification form a part of the contract. Drawing No. Title GI-001 COVER SHEET WITH INDEX CI-100 UTILITY SITE PLAN HA-101 HAZARDOUS DEMOLITION PLAN (PHASE I) S-001 STRUCTURAL ABBREVIATIONS AND NOTES S-101 STRUCTURAL STEEL TOWER (PHASE I) S-102 STRUCTURAL TOWER DETAILS CONT. (PHASE I) A-101 ARCHITECTURAL PLANS AND DETAILS (PHASE III) FA-100 CARBON MONOXIDE ALARM PLAN (PHASE II) MG-001 MECHANICAL ABBREVIATION SYMBOLS AND NOTES MD-101 GROUND FLOOR MECHANICAL RM DEMO PLAN (PHASE II) MD-102 MECH DEMO OF ROOF & SHAFT DETAILS (PHASE III) M-101 BOILER AND GENERATOR EXHAUST PLAN (PHASE II) MG-501 MECHANICAL DETAILS MG-502 MECHANICAL DETAILS -- 4 of 796 -- 11-01-21 01 00 00 -1 SECTION 01 00 00 GENERAL REQUIREMENTS GENERAL 1.1 SAFETY REQUIREMENTS A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements. 1.2 GENERAL INTENTION A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Repair Boiler stack 528A-18-707 as required by drawings and specifications. B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer. C. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR. D. All employees of the general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. 1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. -- 5 of 796 -- 11-01-21 01 00 00 -2 1.4 CONSTRUCTION SECURITY REQUIREMENTS A. Security Plan: 1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the pro

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238220)