Z2DA--689-22-700 EHRM IU West Haven VAMC This ONLY for the PCAC VISN 1 Construction MATOC Pool
VETERANS AFFAIRS, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
36C77626R0106
NAICS
236220
PSC
Z2DA
Posted
July 13, 2026
Response due
July 31, 2026
Description
19 DECEMBER 2024
EHRM
INFRASTRUCTURE
UPGRADES
PROJECT #: 689-22-700
WEST HAVEN VA MEDICAL CENTER,
WEST HAVEN, CONNECTICUT
SPECIFICATIONS
DIVISION 26-28
100% SUBMITTAL
CONSTRUCTION DOCUMENT
-- 1 of 545 --
EHRM INFRASTRUCTURE UPGRADES PROJECT #: 689-22-700
VA MEDICAL CENTER – WEST HAVEN, CT PUB. DATE: 11-01-2022
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS 26 05 11 - 01
SECTION 26 05 11
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section applies to all sections of Division 26.
B. Furnish and install electrical systems, materials, equipment, and accessories in accordance with
the specifications and drawings. Capacities and ratings of motors, transformers, conductors and
cable, switchboards, switchgear, panelboards, motor control centers, generators, automatic
transfer switches, and other items and arrangements for the specified items are shown on the
drawings.
C. Electrical service entrance equipment and arrangements for temporary and permanent
connections to the electric utility company’s system shall conform to the electric utility
company's requirements. Coordinate fuses, circuit breakers and relays with the electric utility
company’s system and obtain electric utility company approval for sizes and settings of these
devices.
D. Conductor ampacities specified or shown on the drawings are based on copper conductors, with
the conduit and raceways sized per NEC. Aluminum conductors are prohibited.
1.2 MINIMUM REQUIREMENTS
A. The latest International Building Code (IBC), Underwriters Laboratories, Inc. (UL), Institute of
Electrical and Electronics Engineers (IEEE), and National Fire Protection Association (NFPA) codes
and standards are the minimum requirements for materials and installation.
B. The drawings and specifications shall govern in those instances where requirements are greater
than those stated in the above codes and standards.
1.3 TEST STANDARDS
A. All materials and equipment shall be listed, labeled, or certified by a Nationally Recognized
Testing Laboratory (NRTL) to meet Underwriters Laboratories, Inc. (UL), standards where test
standards have been established. Materials and equipment which are not covered by UL
standards will be accepted, providing that materials and equipment are listed, labeled, certified
or otherwise determined to meet the safety requirements of a NRTL. Materials and equipment
which no NRTL accepts, certifies, lists, labels, or determines to be safe, will be considered if
inspected or tested in accordance with national industrial standards, such as ANSI, NEMA, and
NETA. Evidence of compliance shall include certified test reports and definitive shop drawings.
-- 2 of 545 --
EHRM INFRASTRUCTURE UPGRADES PROJECT #: 689-22-700
VA MEDICAL CENTER – WEST HAVEN, CT PUB. DATE: 11-01-2022
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS 26 05 11 - 02
B. Definitions:
1. Listed: Materials and equipment included in a list published by an organization that is
acceptable to the Authority Having Jurisdiction and concerned with evaluation of products
or services, that maintains periodic inspection of production or listed materials and
equipment or periodic evaluation of services, and whose listing states that the materials and
equipment either meets appropriate designated standards or has been tested and found
suitable for a specified purpose.
2. Labeled: Materials and equipment to which has been attached a label, symbol, or other
identifying mark of an organization that is acceptable to the Authority Having Jurisdiction
and concerned with product evaluation, that maintains periodic inspection of production of
labeled materials and equipment, and by whose labeling the manufacturer indicates
compliance with appropriate standards or performance in a specified manner.
3. Certified: Materials and equipment which:
a. Have been tested and found by a NRTL to meet nationally recognized standards or to be
safe for use in a specified manner.
b. Are periodically inspected by a NRTL.
c. Bear a label, tag, or other record of certification.
4. Nationally Recognized Testing Laboratory: Testing laboratory which is recognized and
approved by the Secretary of Labor in accordance with OSHA regulations.
1.4 QUALIFICATIONS (PRODUCTS AND SERVICES)
A. Manufacturer’s Qualifications: The manufacturer shall regularly and currently produce, as one of
the manufacturer's principal products, the materials and equipment specified for this project,
and shall have manufactured the materials and equipment for at least three years.
B. Product Qualification:
1. Manufacturer's materials and equipment shall have been in satisfactory operation, on three
installations of similar size and type as this project, for at least three years.
2. The Government reserves the right to require the Contractor to submit a list of installations
where the materials and equipment have been in operation before approval.
C. Service Qualifications: There shall be a permanent service organization maintained or trained by
the manufacturer which will render satisfactory service to this installation within four hours of
receipt of notification that service is needed. Submit name and address of service organizations.
-- 3 of 545 --
EHRM INFRASTRUCTURE UPGRADES PROJECT #: 689-22-700
VA MEDICAL CENTER – WEST HAVEN, CT PUB. DATE: 11-01-2022
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS 26 05 11 - 03
1.5 APPLICABLE PUBLICATIONS
A. Applicable publications listed in all Sections of Division 26 shall be the latest issue, unless
otherwise noted.
B. Products specified in all sections of Division 26 shall comply with the applicable publications
listed in each section.
1.6 MANUFACTURED PRODUCTS
A. Materials and equipment furnished shall be of current production by manufacturers regularly
engaged in the manufacture of such items, and for which replacement parts shall be available.
Materials and equipment furnished shall be new and shall have superior quality and freshness.
B. When more than one unit of the same class …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
Matsushima JASDF Base Storage Shelter
DEPT OF DEFENSE · Sources Sought · due August 7, 2026
Z1DA--| SOL| NRM| 646-21-101 UD SPS AHU & RO Upgrade Construction (VA-26-00036217)
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 27, 2026
B2474 Kitchenettes
DEPT OF DEFENSE · Solicitation · due July 24, 2026
Repair Concrete Base-wide, 126 ARW, Scott AFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 14, 2026
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 7, 2026
REPAIR Dumpster Enclosures, 126ARW, Scott AFB, IL
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 14, 2026