Skip to content
Home/Contractors/Aerojet Rocketdyne Holdings, INC.

Federal Contractor Profile

Aerojet Rocketdyne Holdings, INC.

Federal contracting record: $5.9B obligated across 229 awards from 3 agencies, FY 2016–2026.

$5.9B
Total Obligated
229
Award Records
3
Agencies Served
25
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

F8F5V4MJ2KX2

CAGE Code

05980

Registered Entities (UEIs)

12 under this organization

Address

875 WASHINGTON AVE, CARLSTADT, NJ, 070723001

First Federal Award

Oct 1, 2015

Most Recent Award

Sep 15, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 541712

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)

    98 awards

    $4.1B
  • 336414

    GUIDED MISSILE AND SPACE VEHICLE MANUFACTURING

    11 awards

    $949M
  • 336415

    GUIDED MISSILE AND SPACE VEHICLE PROPULSION UNIT AND PROPULSION UNIT PARTS MANUFACTURING

    17 awards

    $344M
  • 541710

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES

    23 awards

    $154M
  • 541715

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)

    30 awards

    $145M
  • 325180

    OTHER BASIC INORGANIC CHEMICAL MANUFACTURING

    1 awards

    $131M
  • 332993

    AMMUNITION (EXCEPT SMALL ARMS) MANUFACTURING

    11 awards

    $27M
  • 541330

    ENGINEERING SERVICES

    7 awards

    $10M
  • 336419

    OTHER GUIDED MISSILE AND SPACE VEHICLE PARTS AND AUXILIARY EQUIPMENT MANUFACTURING

    4 awards

    $9.9M
  • 332999

    ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING

    4 awards

    $6.2M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Sep 15, 2026National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$2.7M →
Sep 1, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$3.9M →
Aug 25, 2026Department of EnergyNNSA NON-MO CNTRCTNG OPS DIV325180HIGH PURITY DEPLETED URANIUM (HPDU) PRODUCTION SERVICES$500K →
Aug 17, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.$93K →
Jul 31, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$63M →
Jul 20, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$4.3M →
Jun 30, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$38M →
Jun 26, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.$500K →
Jun 24, 2026Department of EnergyNNSA NON-MO CNTRCTNG OPS DIV325180HIGH PURITY DEPLETED URANIUM (HPDU) PRODUCTION SERVICES$55M →
May 22, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.$500K →
May 21, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$33M →
May 8, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.$500K →
Apr 30, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$7.6M →
Apr 29, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$29M →
Apr 28, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.$490K →
Apr 21, 2026National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$2.7M →
Mar 30, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$26M →
Mar 27, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.$930K →
Mar 26, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$1.0M →
Mar 26, 2026National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$13 →
Mar 17, 2026National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$650K →
Feb 21, 2026Department of EnergyNNSA NON-MO CNTRCTNG OPS DIV325180HIGH PURITY DEPLETED URANIUM (HPDU) PRODUCTION SERVICES$29M →
Feb 20, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$30M →
Feb 20, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.$3.0M →
Feb 4, 2026National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$1.0M →

Top Compensated Officers

From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.

  • GARY CAMPER

    Rank 1 · Reported Feb 21, 2026

    $1.0M
  • JAMES BITTNER

    Rank 2 · Reported Feb 21, 2026

    $892K
  • DOUGLAS PAULSON

    Rank 3 · Reported Feb 21, 2026

    $805K
  • SHARON SMOOT

    Rank 4 · Reported Feb 21, 2026

    $727K
  • MARK HUBER

    Rank 5 · Reported Feb 21, 2026

    $708K

Want to win work like Aerojet Rocketdyne Holdings, INC.?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.