Federal Contractor Profile
Arizona State University
Federal contracting record: $261M obligated across 204 awards from 16 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
HX59VKHQH1V7
CAGE Code
4B293
Registered Entities (UEIs)
2 under this organization
Address
660 S MILL AVE STE 312, TEMPE, AZ, 852813670
First Federal Award
Oct 2, 2015
Most Recent Award
Aug 19, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $126M
National Aeronautics and Space Administration
48.1% of total obligations
- $119M
Department of Defense
45.6% of total obligations
- $10M
Department of Health and Human Services
3.9% of total obligations
- $2.4M
General Services Administration
0.9% of total obligations
- $1.7M
Department of Homeland Security
0.6% of total obligations
- $556K
Department of Veterans Affairs
0.2% of total obligations
- $496K
Consumer Product Safety Commission
0.2% of total obligations
- $318K
Department of Commerce
0.1% of total obligations
- $232K
Department of the Interior
0.1% of total obligations
- $150K
National Science Foundation
0.1% of total obligations
Top NAICS Activity
- $75M
541712
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
13 awards
- $57M
541715
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)
41 awards
- $53M
611310
COLLEGES, UNIVERSITIES, AND PROFESSIONAL SCHOOLS
63 awards
- $50M
336414
GUIDED MISSILE AND SPACE VEHICLE MANUFACTURING
1 awards
- $9.7M
541714
RESEARCH AND DEVELOPMENT IN BIOTECHNOLOGY (EXCEPT NANOBIOTECHNOLOGY)
4 awards
- $7.7M
541711
RESEARCH AND DEVELOPMENT IN BIOTECHNOLOGY
8 awards
- $3.4M
923110
ADMINISTRATION OF EDUCATION PROGRAMS
18 awards
- $1.8M
541512
COMPUTER SYSTEMS DESIGN SERVICES
2 awards
- $1.2M
621511
MEDICAL LABORATORIES
3 awards
- $675K
541380
TESTING LABORATORIES AND SERVICES
10 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Aug 19, 2026 | Department of the InteriorOFFICE OF ACQUISITON GRANTS | 517112 | INTERNET SERVICE ARIZONA WATER SCIENCE CENTER | $7K → |
| Jul 22, 2026 | Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004) | 611310 | RECRUITING SERVICES - ARIZONA STATE UNIVERSITY | $15K → |
| Jul 10, 2026 | General Services AdministrationGSA FAS AAS REGION 6 | 611310 | STRATEGIC THINKERS PROGRAM | $2.3M → |
| Jun 18, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 541712 | IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL | $4.6M → |
| May 19, 2026 | Department of DefenseNAVAL SERVICE TRAINING COMMAND | 611310 | SUMMER 2026 NROTC MIDSHIPMEN TUITION AND ALLOWABLE FEES. | $42K → |
| May 18, 2026 | Department of DefenseNAVSUP FLT LOG CTR NORFOLK | 611310 | OPTION YEAR | $125K → |
| May 18, 2026 | Department of DefenseW2R2 COLD RGNS RSCH ENG LAB | 541715 | CSO-CRREL-24-IPR-FIRE-0008 TITLED, ARTIFICIAL INTELLIGENCE INFORMED HIGH-RESOLUTION FUEL MAPPING U437N00 | $102K → |
| May 4, 2026 | General Services AdministrationGSA FAS AAS REGION 6 | 611310 | STRATEGIC THINKERS PROGRAM | $148K → |
| May 1, 2026 | Department of DefenseNAVSUP FLT LOG CTR NORFOLK | 611310 | MILITARY STUDIES CURRICULUM - BASE YEAR | $539K → |
| Apr 28, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 541715 | THIS CONTRACT IS AWARDED FOR THE ARTEMIS INFRARED REFLECTANCE AND EMISSION SPECTROMETER (AIRES) PAYLOAD, SUPPORTING THE NASA LUNAR TERRAIN VEHICLE INSTRUMENTS (LTVI) PROGRAM. | $3.2M → |
| Apr 17, 2026 | General Services AdministrationGSA GAS AAS REGION 6 | 611310 | STRATEGIC THINKERS PROGRAM | $10K → |
| Mar 31, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 541712 | IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL | $300K → |
| Jan 12, 2026 | Department of DefenseNAVSUP FLT LOG CTR NORFOLK | 611310 | START UP/ENROLLMENT PERIOD | $414K → |
| Jan 11, 2026 | Department of DefenseNAVSUP FLT LOG CTR NORFOLK | 611310 | OPTION YEAR | $10K → |
| Jan 11, 2026 | Department of DefenseNAVSUP FLT LOG CTR NORFOLK | 611310 | MILITARY STUDIES CURRICULUM - BASE YEAR | $137K → |
| Jan 11, 2026 | Department of DefenseNAVSUP FLT LOG CTR NORFOLK | 611310 | BASE LOT LOGISTICS-MARITIME | $112K → |
| Dec 22, 2025 | Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY | 541714 | OBJECTIVE PREDICTION OF TEAM EFFECTIVENESS VIA MODELS OF PERFORMANCE OUTCOMES (OP TEMPO) PHASE 1 BASE | $899K → |
| Dec 16, 2025 | Department of DefenseNAVAL SERVICE TRAINING COMMAND | 611310 | RATIFICATION OF GOVERNMENT-AT-FALUT RETROACTIVE TUITION FOR FALL 2025 SEMESTER NROTC MIDSHIPMEN TUITION AND ALLOWABLE FEES. | $892K → |
| Dec 1, 2025 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 541712 | IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL | $650K → |
| Nov 18, 2025 | Department of DefenseNIWC PACIFIC | 541715 | RESEARCH IAW SOW (BASE) | $375K → |
| Nov 13, 2025 | Department of DefenseW4LD USA HECSA | 541715 | ESTCP PROJECT EW25-8664 STANDARDIZING ENERGY RESILIENCE ANALYSES FOR INSTALLATION DESIGN AND INVESTMENT | $150K → |
| Sep 29, 2025 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA | 621511 | ARIZONA STATE UNIVERSITY:1109825 [25-011480] THE CONTRACTOR SHALL CONSTRUCT AND PERFORM ANTIBODY ARRAY TESTING USING A HIGH-THROUGHPUT IMMUNOPROTEOMICS APPROACH FOR ~1,700 PROTEINS TARGETING SELECTED AUTOANTIGENS IN 270 BLOOD SAMPLES. | $64K → |
| Sep 27, 2025 | Department of Homeland SecurityBORDER ENFORCEMENT CONTRACTING DIVISION | 541990 | COMPEX SERVICES - USE FOR INNOVATION AND STRATEGY COMPEX PROGRAM. | $65K → |
| Sep 25, 2025 | Department of DefenseNAVSUP FLT LOG CTR NORFOLK | 611310 | START UP/ENROLLMENT PERIOD | $2.5M → |
| Sep 25, 2025 | Department of DefenseNAVSUP FLT LOG CTR NORFOLK | 611310 | BASE LOT LOGISTICS-MARITIME | $195K → |
Want to win work like Arizona State University?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.