Home/Contractors/Arizona State University

Federal Contractor Profile

Arizona State University

Federal contracting record: $261M obligated across 204 awards from 16 agencies, FY 20162026.

$261M
Total Obligated
204
Award Records
16
Agencies Served
29
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

HX59VKHQH1V7

CAGE Code

4B293

Registered Entities (UEIs)

2 under this organization

Address

660 S MILL AVE STE 312, TEMPE, AZ, 852813670

First Federal Award

Oct 2, 2015

Most Recent Award

Aug 19, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • National Aeronautics and Space Administration

    48.1% of total obligations

    $126M
  • Department of Defense

    45.6% of total obligations

    $119M
  • Department of Health and Human Services

    3.9% of total obligations

    $10M
  • General Services Administration

    0.9% of total obligations

    $2.4M
  • Department of Homeland Security

    0.6% of total obligations

    $1.7M
  • Department of Veterans Affairs

    0.2% of total obligations

    $556K
  • Consumer Product Safety Commission

    0.2% of total obligations

    $496K
  • Department of Commerce

    0.1% of total obligations

    $318K
  • Department of the Interior

    0.1% of total obligations

    $232K
  • National Science Foundation

    0.1% of total obligations

    $150K

Top NAICS Activity

  • 541712

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)

    13 awards

    $75M
  • 541715

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)

    41 awards

    $57M
  • 611310

    COLLEGES, UNIVERSITIES, AND PROFESSIONAL SCHOOLS

    63 awards

    $53M
  • 336414

    GUIDED MISSILE AND SPACE VEHICLE MANUFACTURING

    1 awards

    $50M
  • 541714

    RESEARCH AND DEVELOPMENT IN BIOTECHNOLOGY (EXCEPT NANOBIOTECHNOLOGY)

    4 awards

    $9.7M
  • 541711

    RESEARCH AND DEVELOPMENT IN BIOTECHNOLOGY

    8 awards

    $7.7M
  • 923110

    ADMINISTRATION OF EDUCATION PROGRAMS

    18 awards

    $3.4M
  • 541512

    COMPUTER SYSTEMS DESIGN SERVICES

    2 awards

    $1.8M
  • 621511

    MEDICAL LABORATORIES

    3 awards

    $1.2M
  • 541380

    TESTING LABORATORIES AND SERVICES

    10 awards

    $675K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Aug 19, 2026Department of the InteriorOFFICE OF ACQUISITON GRANTS517112INTERNET SERVICE ARIZONA WATER SCIENCE CENTER$7K
Jul 22, 2026Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004)611310RECRUITING SERVICES - ARIZONA STATE UNIVERSITY$15K
Jul 10, 2026General Services AdministrationGSA FAS AAS REGION 6611310STRATEGIC THINKERS PROGRAM$2.3M
Jun 18, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL$4.6M
May 19, 2026Department of DefenseNAVAL SERVICE TRAINING COMMAND611310SUMMER 2026 NROTC MIDSHIPMEN TUITION AND ALLOWABLE FEES.$42K
May 18, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310OPTION YEAR$125K
May 18, 2026Department of DefenseW2R2 COLD RGNS RSCH ENG LAB541715CSO-CRREL-24-IPR-FIRE-0008 TITLED, ARTIFICIAL INTELLIGENCE INFORMED HIGH-RESOLUTION FUEL MAPPING U437N00$102K
May 4, 2026General Services AdministrationGSA FAS AAS REGION 6611310STRATEGIC THINKERS PROGRAM$148K
May 1, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310MILITARY STUDIES CURRICULUM - BASE YEAR$539K
Apr 28, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541715THIS CONTRACT IS AWARDED FOR THE ARTEMIS INFRARED REFLECTANCE AND EMISSION SPECTROMETER (AIRES) PAYLOAD, SUPPORTING THE NASA LUNAR TERRAIN VEHICLE INSTRUMENTS (LTVI) PROGRAM.$3.2M
Apr 17, 2026General Services AdministrationGSA GAS AAS REGION 6611310STRATEGIC THINKERS PROGRAM$10K
Mar 31, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL$300K
Jan 12, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310START UP/ENROLLMENT PERIOD$414K
Jan 11, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310OPTION YEAR$10K
Jan 11, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310MILITARY STUDIES CURRICULUM - BASE YEAR$137K
Jan 11, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310BASE LOT LOGISTICS-MARITIME$112K
Dec 22, 2025Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY541714OBJECTIVE PREDICTION OF TEAM EFFECTIVENESS VIA MODELS OF PERFORMANCE OUTCOMES (OP TEMPO) PHASE 1 BASE$899K
Dec 16, 2025Department of DefenseNAVAL SERVICE TRAINING COMMAND611310RATIFICATION OF GOVERNMENT-AT-FALUT RETROACTIVE TUITION FOR FALL 2025 SEMESTER NROTC MIDSHIPMEN TUITION AND ALLOWABLE FEES.$892K
Dec 1, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL$650K
Nov 18, 2025Department of DefenseNIWC PACIFIC541715RESEARCH IAW SOW (BASE)$375K
Nov 13, 2025Department of DefenseW4LD USA HECSA541715ESTCP PROJECT EW25-8664 STANDARDIZING ENERGY RESILIENCE ANALYSES FOR INSTALLATION DESIGN AND INVESTMENT$150K
Sep 29, 2025Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA621511ARIZONA STATE UNIVERSITY:1109825 [25-011480] THE CONTRACTOR SHALL CONSTRUCT AND PERFORM ANTIBODY ARRAY TESTING USING A HIGH-THROUGHPUT IMMUNOPROTEOMICS APPROACH FOR ~1,700 PROTEINS TARGETING SELECTED AUTOANTIGENS IN 270 BLOOD SAMPLES.$64K
Sep 27, 2025Department of Homeland SecurityBORDER ENFORCEMENT CONTRACTING DIVISION541990COMPEX SERVICES - USE FOR INNOVATION AND STRATEGY COMPEX PROGRAM.$65K
Sep 25, 2025Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310START UP/ENROLLMENT PERIOD$2.5M
Sep 25, 2025Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310BASE LOT LOGISTICS-MARITIME$195K

Want to win work like Arizona State University?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.