Home/Contractors/Redstone Defense Systems/contracts

Federal Contractor Profile

Redstone Defense Systems

$912M obligated·660 awards·1 agencies·2 NAICS

Federal Contracts

Showing contracts 201250 of 621 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Feb 26, 2018Department of DefenseW6QK ACC ANAD0037336992IGF::OT::IGF OTHER DIRECT COST$47K
Feb 23, 2018Department of DefenseW6QK ACC-RSA0620336413IGF::OT::IGF THE NAVAIR V-22 PROGRAM MANAGEMENT OFFICE (PMO) REQUIRES A REPLACEMENT 6X8 ADVANCED MULTI-FUNCTION DISPLAY (AMFD) FOR INTEGRATION INTO THE V-22 OSPREY AIR VEHICLE TO REPLACE THE OBSOLETE 6X6 MULTI-FUNCTION DISPLAY.$4.0M
Feb 20, 2018Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$4.2M
Feb 15, 2018Department of DefenseW6QK ACC-RSA0694336413IGF::OT::IGF NEW ORDER BASE SUSTAINMENT, ASSESSMENTS, TRAINING, AND OTHER SUPPORT ASSOCIATED WITH THE FIELDED MK18 MOD 2 INCREMENT 0 ASSETS. OPTION 1 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 2 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 3 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 4 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 5 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 6 REFURBISHMENT FIELDED MK18 MOD 2 INCREMENT 0 RIGID HULL INFLATABLE BOATS, 11M RHIB. OPTION 7 REFURBISHMENT FIELDED MK18 MOD 2 INCREMENT 0 SPARE PARTS AND REPAIR PARTS. OPTION 8 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 9 ADDITIONAL COLLABORATIVE ASSESSMENT ENVIRONMENTS AND USER EVALUATIONS.$605K
Feb 13, 2018Department of DefenseW6QK ACC-RSA0733336413SOW: FUTURE LAUNCHER DEMONSTRATION UNITS THIS STATEMENT OF WORK (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) FUTURE LAUNCHER DEMONSTRATION UNITS DEVELOPMENT. THE FUTURE LAUNCHER IS A PALLETIZED LAUNCHER CAPABLE OF FIRING THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) FAMILY OF MUNITIONS (MFOM), TWO (2) PODS LOAD OUT, WITH AZIMUTH AND ELEVATION CAPABILITY. THE DRAWING PACKAGE FOR THE FUTURE LAUNCHER DEMONSTRATION UNITS IS UNDER DEVELOPMENT BY THE GOVERNMENT AND WILL BE PROVIDED TO THE CONTRACTOR. THE LAUNCHER DESIGN WILL BE BASED ON THE FUTURE LAUNCHER INTEGRATION TEST UNITS DESIGN, TWO OF WHICH WERE FABRICATED UNDER TASK ORDER 0649 OF THIS CONTRACT, BUT WILL HAVE SIGNIFICANT DIFFERENCES IN FORM, FIT, AND FUNCTION. TWO M270 TURRET GEAR BEARINGS WILL BE PROVIDED TO THE CONTRACTOR FOR RE-UTILIZATION IN ORDER TO REDUCE COST AND SCHEDULE RISK. ACTIVITIES INCLUDE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TEST, AND CHECKOUT OF MECHANICAL AND ELECTRICAL COMPONENTS ASSOCIATED WITH THE DEVELOPMENT OF TWO FUTURE LAUNCHER DEMONSTRATION UNITS WHICH WILL FACILITATE TESTING OF FUTURE LAUNCHER FUNCTIONALITY$2.7M
Feb 12, 2018Department of DefenseW6QK ACC-RSA0738336413THE SCOPE OF THIS STATEMENT OF WORK (SOW) DEFINES THE PERSONNEL, MATERIALS, AND SERVICES REQUIRED TO MODIFY, VERIFY, DOCUMENT, AND DELIVER THREE UH-60A AIRCRAFT IN A UNIQUE CONFIGURATION FOR THE AFGHANISTAN FMS CASE W5-B-UAQ.$5.2M
Feb 7, 2018Department of DefenseW6QK ACC-RSA0728336413BASE EFFORT THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM FOUR EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE FOUR AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE FOUR EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT INTEGRATION ACTIVITIES. MODIFICATIONS SHALL BE PERFORMED IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL MAKE ANY NECESSARY DESIGN CHANGES TO THE A-KITS PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT IN ORDER TO ACHIEVE FORM, FIT, AND FUNCTION ON THE FOUR AIRCRAFT. THE CONTRACTOR SHALL PROVIDE OR REWORK THE NECESSARY A-KIT PARTS IAW THE REDLINED OR MODIFIED DRAWINGS AND INSTALL A-KIT PARTS IAW THE REDLINED OR MODIFIED INSTALLATION DRAWINGS. OPTION 1 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. OPTION 2 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS.$4.4M
Feb 7, 2018Department of DefenseW6QK ACC-RSA0700336413SOW:HH-60L CONVERSION WINDOW KITS THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE UTILITY HELICOPTERS PROJECT OFFICE (UHPO) CONVERSION CREW CHIEF WINDOW KITS IN SUPPORT OF HH-60L CONVERSION INTEGRATION EFFO$1.2M
Feb 7, 2018Department of DefenseW6QK ACC-RSA0559336413IGF::OT::IGF STATEMENT OF WORK FOR THE ENVIRONMENTAL ACOUSTIC RECORDING SYSTEM (EARS) SUPPORT.$26K
Feb 5, 2018Department of DefenseW6QK ACC-RSA0492336413IGF::OT::IGF NEW TASK ORDER FOR "INTEGRATION AND QUALIFICATION FOR THE H-60 L/M FEDERATED ADVANCE NAVIGATION SYSTEM (FANS)"$930K
Feb 1, 2018Department of DefenseW6QK ACC-RSA0714336413IGF::OT::IGF NEW ORDER 0714 SOW:NAVO NP3 CM/MO SUPPORT THE OCEANOGRAPHIC DEPARTMENT, CODE NP3, WITHIN THE NAVAL OCEANOGRAPHIC OFFICE (NAVO), PROVIDES SOLUTIONS TO COMPLEX OCEANOGRAPHIC PROBLEMS FOR THE US NAVY. THE OCEANOGRAPHIC DEPARTMENT USES A VARIETY OF OCEANOGRAPHIC SYSTEMS TO COLLECT THE DATA REQUIRED TO SOLVE THESE PROBLEMS. NP3 PERFORMS ALL THE NECESSARY ENGINEERING AND LOGISTICAL FUNCTIONS REQUIRED TO MAINTAIN THESE SYSTEMS AT A HIGH LEVEL OF READINESS.$89K
Feb 1, 2018Department of DefenseW6QK ACC-RSA0599336413IGF::OT::IGF, TASK ORDER 0599, OEP 18402$60K
Feb 1, 2018Department of DefenseW6QK ACC-RSA0716336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE THIRTY (30) FORWARD LOOKING INFRARED (FLIR) BALLAST KITS.$522K
Jan 29, 2018Department of DefenseW6QK ACC-RSA0556336413IGF::OT::IGF NAVO REMUS AUV SUPPORT$75K
Jan 29, 2018Department of DefenseW6QK ACC-RSA0672336413IGF::OT::IGF ORDER 0672 THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 152 FANS INSTALLATION KITS AND NINE (9) SPARE FANS B-KITS. THE CONTRACTOR SHALL PROVIDE 152 FANS INSTALLATION KITS IN ACCORDANCE WITH (IAW) THE GOVERNMENT FURNISHED DRAWINGS PACKAGE 1068784. INSTALLATION KITS SHALL CONTAIN A-KIT, AND THE B-KITS SHALL BE DELIVERED SEPARATELY. THE CONTRACTOR SHALL PROVIDE NINE (9) SPARE FANS B-KITS. THE CONTRACTOR SHALL PROVIDE 32 NAVIGATIONAL DATABASE LOADERS. THE CONTRACTOR SHALL PROVIDE TWO (2) YEARS OF MONTHLY NAVIGATIONAL DATABASE UPDATES FOR EACH FANS B-KIT DELIVERED AS PART OF THIS EFFORT. THE DATABASE UPDATES SHALL BE ACTIVATED UPON INSTALLATION INTO THE AIRCRAFT.$5K
Jan 25, 2018Department of DefenseW6QK ACC-RSA0595336413IGF::OT::IGF ORDER 0595. THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE DESIGN, DEVELOPMENT AND MANUFACTURING OF HARDWARE THAT WOULD FACILITATE THE ALIGNMENT OF RADAR WARNING RECEIVER (RWR) AND LOW BAND ARRAY (LBA) ANTENNAS USING THE ADVANCED TACTICAL LRU ALIGNMENT SYSTEM (ATLAS) DURING ANTENNA INSTALLATION ON AH-64D/E AIRCRAFT.$18K
Jan 25, 2018Department of DefenseW6QK ACC-RSA0684336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO BUILD/FABRICATE, INTEGRATE, KIT AND SHIP H-1 LIGHTING KITS AND SPARES. THE CURRENT UH-1Y AND AH-1Z HELICOPTERS REQUIRE AN UPGRADE TO THE EXTERNAL LIGHTING SYSTEM. THE UPGRADED LIGHTING SYSTEM WILL ADD DUAL-FUNCTION VISIBLE/INFRA-RED (IR) LIGHT EMITTING DIODE (LED) ANTI-COLLISION, BLADE-TIP, POSITION LIGHTS AND UPDATE THE LIGHTING CONTROL PANEL TO ENSURE SELECTABLE INTENSITIES AND CONCURRENT IR/OVERT SELECTION ARE AVAILABLE.$3.5M
Jan 9, 2018Department of DefenseW6QK ACC-RSA0600336413IGF::OT::IGF ORDER 0600 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR ITEM PROCUREMENT, FABRICATION, KITTING, PACKAGING, AND SHIPPING OF C-130 SEARCH AND RESCUE (SAR) BINS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$280K
Jan 8, 2018Department of DefenseW6QK ACC-RSA0652336413US ARMY UC31 CURRENT UTILIZE THE UNIVERSITY UNS-1ESPEW WHITE MANAGEMENT SYSTEM AND MULTIPLE AVA COMPONTS THROUGH THE AIRSPACE TO MEET ARMY TRANSPORT REQUIREMENTS. PURPOSE OF THE EFFECT IS TO ADSB OUT OPERATIONS$6.6M
Jan 5, 2018Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$1.5M
Jan 5, 2018Department of DefenseW6QK ACC-RSA0653336413IGF::OT::IGF NEW ORDER 0653 (INCREMENTALLY FUNDED) THIS STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENTS FOR THE DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE H-60 ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT.$4.2M
Dec 22, 2017Department of DefenseW6QK ACC-RSA0701336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 100 AVENGER W303 CABLES ASSEMBLIES.$581K
Dec 20, 2017Department of DefenseW6QK ACC-RSA0451336413IGF::OT::IGF MODIFICATION OF TWO (2) UH-60M AIRCRAFT WITH UNIQUE MISSION EQUIPMENT FOR THE U.S. FEDERAL BUREAU OF INVESTIGATIONS (FBI).$144K
Dec 13, 2017Department of DefenseW6QK ACC-RSA0431336413IGF::OT::IGF FMS QATAR AND INDONESIA APACHE SUPPORT KITS$436K
Dec 11, 2017Department of DefenseW6QK ACC-RSA0624336413IGF::OT::IGF ORDER 0624 PROGRAM MANAGEMENT, ENGINEERING DEVELOPMENT AND OR COMMERCIAL SOLUTION SELECTION, INTEGRATION, TEST AND EVALUATION, AND INSTALLATION OF A FEDERAL AVIATION ADMINISTRATION FAA APPROVED SUPPLEMENTAL TYPE CERTIFICATED STC FOR AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST ADSB INTO THE US ARMY UH 72A LAKOTA.$37K
Dec 11, 2017Department of DefenseW6QK ACC-RSA0460336413IGF::OT::IGF, ORDER 0460 TO SUPPORT THE SWICE PROGRAM.$842K
Dec 5, 2017Department of DefenseW6QK ACC-RSA0665336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO SUPPORT THE INTERNATIONAL APACHE TAIWAN PROGRAM MANAGEMENT OFFICE REQUIREMENT FOR PROGRAM MANAGEMENT AND LOGISTICS SUPPORT IN ORDER TO PROVIDE THE INTEGRATION, FABRICATION, PROCUREMENT, KITTING, INSPECTION, AND SHIPPING REQUIRED FOR TAIWAN APACHE SUPPORT KITS. THE CONTRACTOR SHALL FABRICATE, INTEGRATE, PROVIDE, KIT, INSPECT, AND PREPARE TO SHIP ALL INSTALLATION HARDWARE AND CONSUMABLES ASSOCIATED WITH THE TAIWAN APACHE SUPPORT KITS AS IDENTIFIED IN APPENDIX C AND APPENDIX D.$136K
Nov 21, 2017Department of DefenseW6QK ACC-RSA0727336413THIS SOW DEFINES THE EFFORT REQUIRED FOR THE NON-RECURRING ENGINEERING (NRE), FABRICATION, ASSEMBLY, AND KITTING OF 225 CH-47F AN/AVR-2B A-KITS$11M
Nov 20, 2017Department of DefenseW6QK ACC-RSA0711336413THE CONTRACTOR SHALL PERFORM THE INSPECTION, REPAIR AND MODIFICATION OF 6 KUWAIT PATRIOT (LSTS) IAW DRAWING 13589395. THE CONTRACTOR SHALL PERFORM ALL FUNCTIONAL TESTING OF HARDWARE TO INCLUDE VERIFICATION OF PERFORMANCE IAW DRAWING 1358935.$194K
Nov 20, 2017Department of DefenseW6QK ACC-RSA0492336413IGF::OT::IGF NEW TASK ORDER FOR "INTEGRATION AND QUALIFICATION FOR THE H-60 L/M FEDERATED ADVANCE NAVIGATION SYSTEM (FANS)"$11K
Nov 15, 2017Department of DefenseW6QK ACC-RSA0697336413IGF::OT::IGF SOW:H-1 DVR A1 AND A2 KIT INTEGRATIONS NAVAIR PMA-276 REQUIRES FABRICATION OF H-1 DIGITAL VIDEO RECORDER (DVR) A1 KITS AND H-1 DIGITAL VIDEO RECORDER (DVR) A2 KITS. DEVELOPMENT OF THE H-1 DVR A1 AND A2 KIT TDP, PROTOTYPE, VALIDATION AND VERIFICATION WERE COMPLETED UNDER A SEPARATE NAVY CONTRACT. THE H-1 DVR A1 AND A2 KITS PROVIDE UH-1Y AND AH-1Z THE INFRASTRUCTURE TO UPGRADE FROM THE VIDEO TAPE RECORDER (VTR) TO THE DVR FOR PERFORMANCE AND RELIABILITY, OBSOLESCENCE MANAGEMENT AND WEIGHT REDUCTION IMPROVEMENTS. THIS EFFORT WILL PRODUCE W2080 WIRE HARNESSES PART NUMBER 23D1059-3 CABLE ASSEMBLY, DVR ADAPTER FOR THE FIRST TIME.$238K
Nov 15, 2017Department of DefenseW6QK ACC-RSA0535336413IGF::OT::IGF, INSTALLATION OF COMMON REMOTELY OPERATED WEAPON STATIONS (CROWS)&A-KITS FOR AF MRAP COUGAR VEHICLES.$1.9M
Nov 8, 2017Department of DefenseW6QK ACC ANAD0034336992IGF::OT::IGF. VARIOUS SUPPORT SERVICES FOR THE CABLE BUILD FOR THE JOINT ASSAULT BREACHER (JAB) PROGRAM.$638K
Nov 6, 2017Department of DefenseW6QK ACC-RSA0706336413ORDER 0706 IS ISSUED ON COST PLUS FIXED FEE COMPLETION) BASIS PURSUANT TO THE TERMS AND CONDITIONS SET FORTH IN THE BASIC CONTRACT, W58RGZ-12-D-0089. ALL WORK IN THIS ORDER IS TO BE ACCOMPLISHED IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) FOR ORDER 0706,FOUND IN THE LIST OF ATTACHMENTS ENTITLED "MQ-8C FIRE SCOUT COMBINED MAINTENANCE TRAINER (CMT)." THE PERIOD OF PERFORMANCE FOR ORDER 0706 IS FROM DATE OF AWARD THROUGH 30 JUNE 2019.$5.2M
Nov 2, 2017Department of DefenseW6QK ACC-RSA0639336413IGF::OT::IGF ORDER 0639 NEW TASK ORDER FOR FY17 H-60M NATIONAL GUARD COMBAT AVIATION BRIGADE (NG CAB) INITIAL AIRCRAFT FIELDING PACKAGE. THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, DESIGN, ENGINEERING, KITTING, AND SHIPPING OF THE FY17 H-60M INITIAL FIELDING PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$111K
Nov 2, 2017Department of DefenseW6QK ACC-RSA0680336413TO 680, RBA 19554, "PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED AT APPENDIX C IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES TU-B-IBD AND AE-B-UDE."$2.3M
Oct 20, 2017Department of DefenseW6QK ACC-RSA0096336413IGF::OT::IGF: OEP 14357 ON-POST MANUFACTURING MACHINE MAINTENANCE$384K
Oct 19, 2017Department of DefenseW6QK ACC-RSA0604336413IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE AND INTEGRATE UH-60L AIRCRAFT WITH THE EXTERNAL STORES SUPPORT SYSTEM (ESSS) MOUNTED RESCUE HOIST (EMRH). THE INTEGRATION OF THE EMRH WILL RESOLVE INTERFERENCE ISSUES WITH MEDEVAC MISSION KITS.$831K
Sep 29, 2017Department of DefenseW6QK ACC-RSA0703336413IGF::CT::IGF, RBA 19984, ORDER 0703, SUPPORT INTEGRATION OF ANTI-MISSILE PROTECTION SYSTEMS (AMPS) ON MI-17 VARIANT HELICOPTERS IN AFGHANISTAN. THE REFERENCE OF MI-17 VARIANT IN THIS DOCUMENT IS DEFINED AS MI-8MTV-1, MI-17-1V, AND MI-17V-5$6.3M
Sep 29, 2017Department of DefenseW6QK ACC-RSA0694336413IGF::OT::IGF NEW ORDER BASE SUSTAINMENT, ASSESSMENTS, TRAINING, AND OTHER SUPPORT ASSOCIATED WITH THE FIELDED MK18 MOD 2 INCREMENT 0 ASSETS. OPTION 1 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 2 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 3 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 4 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 5 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 6 REFURBISHMENT FIELDED MK18 MOD 2 INCREMENT 0 RIGID HULL INFLATABLE BOATS, 11M RHIB. OPTION 7 REFURBISHMENT FIELDED MK18 MOD 2 INCREMENT 0 SPARE PARTS AND REPAIR PARTS. OPTION 8 PROCUREMENT OF NEW MK18 MOD2 INCREMENT 0 ASSETS. OPTION 9 ADDITIONAL COLLABORATIVE ASSESSMENT ENVIRONMENTS AND USER EVALUATIONS.$593K
Sep 29, 2017Department of DefenseW6QK ACC-RSA0725336413IGF::OT::IGF NEW ORDER 0725 IN ACCORDANCE WITH THE SOW, DATED 19 SEPTEMBER 2017, THE PROTOTYPE INTEGRATION FACILITY (PIF) DEFINES THE REQUIREMENT TO PROVIDE FORTY-FIVE (45) AURS MK112 MOD2S IN ACCORDANCE WITH (IAW) DRAWING NUMBER 8242774 AND FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES IAW DRAWING NUMBER 5408717. THE CONTRACTOR SHALL PROVIDE AN ADDITIONAL THIRTY-SIX (36) AURS MK112 MOD2S IN ACCORDANCE WITH (IAW) DRAWING NUMBER 8242774. THE CONTRACTOR SHALL PROVIDE EIGHT (8) DLBCS IN ACCORDANCE WITH (IAW) DRAWING NUMBER 7615651 AND THREE (3) VPT CABLES IAW DRAWING NUMBER 8242800. THE CONTRACTOR SHALL PERFORM PRODUCT VERIFICATION INSPECTIONS AND PREPARE PRODUCT VERIFICATION INSPECTION REPORTS FOR ALL CONFIGURATION ITEMS IAW DI-MISC-80508/T.$4.2M
Sep 29, 2017Department of DefenseW6QK ACC-RSA0599336413IGF::OT::IGF, TASK ORDER 0599, OEP 18402$361K
Sep 28, 2017Department of DefenseW6QK ACC-RSA0692336413IGF::OT::IGF NEW ORDER 0692 STATEMENT OF WORK (SOW): APACHE MODERNIZATION SUPPORT THIS SOW DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, PROVISIONING, KITTING, AND DELIVERY OF MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS AND APACHE PARTS. THIS INCLUDES APACHE MODERNIZATION SUPPORT MATERIAL COMPRISING OF AIRCRAFT SURVIVABILITY PRODUCT IMPROVEMENT (ASPI) (AH-64D) (LEGACY/TEST FLIGHT) AND AH-64E (IMPROVED) KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS. ADDITIONALLY, THE CONTRACTOR WILL VERIFY THE APACHE MODIFICATION KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT/SUSTAINMENT OF MODIFICATION WORK ORDER (MWO) AND OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$9.4M
Sep 28, 2017Department of DefenseW6QK ACC-RSA0648336413IGF::OT::IGF THE STATEMENT OF WORK DEFINES THE EFFORT REQUIRED FOR TEARDOWN, DEPOPULATION OF CRASH DAMAGED AIRCRAFT (CDA) AND SHIPMENT AS REQUIRED, REPAIR OF APACHE AIRCRAFT AND PROCUREMENT/REPAIR/SUPPORT OF EQUIPMENT SYSTEMS AND PECULIAR GROUND SUPPORT EQUIPMENT (PGSE). MODELING OF AIRCRAFT PART/SYSTEM DATA CAPTURE AND ANALYSIS TO INCLUDE 3D PRINTING/MODELED OF AH-64 AIRFRAME, SENSOR, SIGHTING, ELECTRICAL, DRIVETRAIN COMPONENTS AND ENGINE COMPONENTS, POINT CLOUD DATA CAPTURE AND POST PROCESSING AS DIRECTED WILL BE REQUIRED. MODERNIZED SIGNAL PROCESSING UNIT (MSPU) SOFTWARE DEVELOPMENT, FABRICATING OR PROCURING OF PARTS, KITS, SPECIAL TOOLS, PROVIDING DESIGNATED ENGINEERING SUPPORT FOR APACHE TRAINING SYSTEMS, SUSTAINMENT SUPPORT OF NEW EQUIPMENT TRAINING TEAM (NETT) TRAILER, DATABASE MANAGEMENT OF GFE, GFI, CDA PARTS, AND SUPPORT FOR ALL ASSOCIATED TRAVEL REQUIREMENTS. ADDITIONAL TASKS WILL BE ON SIGHT WEIGHING OF COMPLETED TRAINING DEVICES AND WEIGHT AND BALANCE FORM GENERATION.$76K
Sep 28, 2017Department of DefenseW6QK ACC-RSA0724336413IGF::OT::IGF, RBA 19694, TO 724, THE STATEMENT OF WORK STATES THAT THE CONTRACTOR WILL SUPPORT THE U.S. ARMY MEDICAL COMMAND IN THE FABRICATION AND INTEGRATION OF THE CH-47F FORWARD RESUSCITATIVE CARE SYSTEM (FRCS), A MEDICAL MISSION PACKAGE IN SUPPORT OF SURGICAL CARE AND RESUSCITATIVE SUPPORT FOR ONE INDIVIDUAL PATIENT DURING ON-BOARD AND OFF BOARD OPERATION DEMONSTRATION."$768K
Sep 28, 2017Department of DefenseW6QK ACC-RSA0564336413IGF::OT::IGF PATRIOT MSE/MRT/ERT$5.1M
Sep 28, 2017Department of DefenseW6QK ACC-RSA0714336413IGF::OT::IGF NEW ORDER 0714 SOW:NAVO NP3 CM/MO SUPPORT THE OCEANOGRAPHIC DEPARTMENT, CODE NP3, WITHIN THE NAVAL OCEANOGRAPHIC OFFICE (NAVO), PROVIDES SOLUTIONS TO COMPLEX OCEANOGRAPHIC PROBLEMS FOR THE US NAVY. THE OCEANOGRAPHIC DEPARTMENT USES A VARIETY OF OCEANOGRAPHIC SYSTEMS TO COLLECT THE DATA REQUIRED TO SOLVE THESE PROBLEMS. NP3 PERFORMS ALL THE NECESSARY ENGINEERING AND LOGISTICAL FUNCTIONS REQUIRED TO MAINTAIN THESE SYSTEMS AT A HIGH LEVEL OF READINESS.$57K
Sep 28, 2017Department of DefenseW6QK ACC-RSA0722336413IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE THIRTY (30) PATRIOT DUAL TELEMETRY KITS.$1.1M
Sep 27, 2017Department of DefenseW6QK ACC-RSA0718336413IGF::OT::IGF, THE UH-60 PROJECT MANAGEMENT OFFICE HAS A REQUIREMENT TO COMPLETE THE NON-RECURRING EFFORT NECESSARY TO INCORPORATE THE IMPROVED ENGINE STARTER, P/N 3505300-10, INTO THE H-60 FLEET AS A SPARE. THIS EFFORT WILL INCLUDE DEVELOPMENT OF TECHNICAL MANUAL (TM) UPDATES, REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL) UPDATES, PROVISIONING UPDATES, DRAWINGS, AND COMPONENT AND AIRFRAME ENGINEERING CHANGE PROPOSALS (ECP).$438K
Sep 27, 2017Department of DefenseW6QK ACC-RSA0541336413IGF::OT::IGF NEW ORDER FOR HIGH BAY SUPPORT$272K

Get Alerted Before Redstone Defense Systems's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free