Home/Contractors/Redstone Defense Systems/contracts

Federal Contractor Profile

Redstone Defense Systems

$912M obligated·660 awards·1 agencies·2 NAICS

Federal Contracts

Showing contracts 251300 of 621 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Sep 27, 2017Department of DefenseW6QK ACC-RSA0715336413IGF::OT::IGF NEW ORDER STATEMENT OF WORK (SOW): H060 A/L MAIN ROTOR BLADE HONTEK EROSION COATING REMOVAL 05 SEPTEMBER 2017 THIS SOW DETAILS THE REQUIREMENTS FOR THE REMOVAL OF THE HONTEK EROSION COATING FROM 194 H-60A/L MAIN ROTOR BLADES (MRBS) PART NUMBERS: 70150-09100-041, 70150-09100-043, AND 70150-09100-047.$1.7M
Sep 27, 2017Department of DefenseW6QK ACC-RSA0541336413IGF::OT::IGF NEW ORDER FOR HIGH BAY SUPPORT$272K
Sep 27, 2017Department of DefenseW6QK ACC-RSA0580336413IGF::OT::IGF , TASK ORDER 0580, OEP 18468, "BUILDING 4803 AIRCRAFT HANGAR SUPPORT."$346K
Sep 26, 2017Department of DefenseW6QK ACC-RSA0719336413IGF::OT::IGF NEW TO THE CONTRACTOR SHALL NOTIFY THE IPT OF ALL PMI-1 MAINTENANCE, SERVICE BULLETINS, AND TECHNICAL DIRECTIVES REQUIRED DURING AIRCRAFT MAINTENANCE/MODIFICATION. THE CONTRACTOR SHALL PERFORM AIRCRAFT MODERNIZATION AND ANY NEW TECHNICAL DIRECTIVE AS CALLED OUT IN PLANNED MAINTENANCE INTERVAL (PMI) REQUIREMENTS SPECIFICATION, DATED 15 JUNE 2016, WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL REPAIRS, UPGRADE, TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES, SERVICE BULLETINS, OR AIRWORTHINESS DIRECTIVES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR SCHEDULED MAINTENANCE, SERVICE BULLETINS, AIRWORTHINESS DIRECTIVES, AND GROUND FLIGHT SUPPORT SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. AIRCRAFT DISCREPANCIES, DEFECTS, AND AIRCRAFT SYSTEM FAILURES DISCOVERED DURING THE PMI EVENT (BUT NOT PART OF A SPECIFIC PMI INSPECTION REQUIREMENT) SHALL BE IDENTIFIED BY THE CONTRACTOR AND REPORTED AS AN EXAMINER AND EVALUATOR DISCREPANCY REPORT IAW DI-MISC-80508B-2. THE CONTRACTOR SHALL PREPARE THIS REPORT FOR DISCREPANCY CLASSIFICATION (IN-SERVICE REPAIR, O-LEVEL, OR UNSCHEDULED COMPONENT REPAIR), DEFECT CLASSIFICATION (CRITICAL, MAJOR, MINOR, AND NOTED BUT NOT CORRECTED [NBNC]), AND TASK RESOLUTION. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT UPON BECOMING AWARE OF ANY ISSUE WITH THE TYPE, AREA, AND NATURE OF DISCREPANCY AND DEFECT. THE CONTRACTOR SHALL PROVIDE A PROPOSED RESOLUTION TO THE GOVERNMENT, BUT SHALL NOT EXECUTE ANY REPAIRS, MAINTENANCE, OR CHANGES UNTIL RECEIPT OF THE WRITTEN APPROVAL OF THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR UNSCHEDULED MAINTENANCE SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT.$980K
Sep 26, 2017Department of DefenseW6QK ACC-RSA0649336413IGF::CL,CT::IGF THE STATEMENT OF WORK IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) FUTURE LAUNCHER TEST-BED (FLT) DEVELOPMENT. THE FUTURE LAUNCHER TEST-BED IS A PALLETIZED LAUNCHER CAPABLE OF FIRING THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) FAMILY OF MUNITIONS (MFOM), TWO (2) PODS LOAD OUT, WITH AZIMUTH AND ELEVATION CAPABILITY. THE DRAWING PACKAGE FOR THE FLIT ARE UNDER DEVELOPMENT BY THE GOVERNMENT AND WILL BE PROVIDED TO THE CONTRACTOR. THE LAUNCHER DESIGN WILL BE BASED ON THE M270 DESIGN. TWO LEGACY M3 CONTAINER ROLL-ON/ROLL-OF PLATFORMS AND TWO M270 LAUNCHERS (NON-FUNCTIONAL) WILL BE PROVIDED TO THE CONTRACTOR FOR RE-UTILIZATION OF KEY COMPONENTS IN ORDER TO REDUCE COST AND SCHEDULE RISK. ACTIVITIES INCLUDE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TEST, AND CHECKOUT OF MECHANICAL AND ELECTRICAL COMPONENTS AND LINE REPLACEABLE UNITS (LRUS) ASSOCIATED WITH THE DEVELOPMENT OF TWO FUTURE LAUNCHER INTEGRATION TEST (FLIT) UNITS WHICH WILL FACILITATE TESTING OF FLT FUNCTIONALITY.$2.1M
Sep 22, 2017Department of DefenseW6QK ACC-RSA0712336413IGF::OT::IGF NEW ORDER (0712) FOR SOW: PATRIOT LAUNCHER STATION TEST CIRCUIT CARDS. STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENTS FOR PROVIDING (15) 13589517, CIRCUIT CARD ASSEMBLIES TO SUPPORT SUSTAINMENT OF THE PATRIOT LAUNCHER STATION TEST SETS (LSTS). INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FIFTEEN (15) CCA, INPUT LATCH NO.2 13589517. ACCEPTANCE TESTING SHALL BE PERFORMED IAW ACCEPTANCE TEST PROCEDURE 13589486, TEST SET, GUIDED MISSILE LAUNCHING STATION. THE CONTRACTOR SHALL PERFORM TESTING WITH THE GOVERNMENT FURNISHED PATRIOT PAC 2 LAUNCHER STATION AND GOVERNMENT FURNISHED LAUNCHER STATION TEST SET IN SUPPORT OF TESTING THE LAUNCHER STATION TEST SET CIRCUIT CARD ASSEMBLIES.$82K
Sep 22, 2017Department of DefenseW6QK ACC-RSA0618336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, PROVISIONING, KITTING, AND DELIVERY OF MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS AND APACHE PARTS. THIS INCLUDES APACHE FIELD SUPPORT MATERIAL COMPRISED OF AH-64E (IMPROVED) KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS. ADDITIONALLY, THE CONTRACTOR WILL VERIFY THE APACHE MODIFICATION KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT/SUSTAINMENT OF MODIFICATION WORK ORDER (MWO) AND OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES.$3.7M
Sep 22, 2017Department of DefenseW6QK ACC-RSA0708336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) IS FOR THE PROCUREMENT, FABRICATION, KITTING, AND TECHNICAL DOCUMENTATION TO SUPPORT THE UH-60M MILITARY DISTRICT OF WASHINGTON (MDW) AND EMERGENCY EVACUATION MISSION KIT (EEMK) UNIQUE MISSION SYSTEMS FOR VERY IMPORTANT PERSON (VIP) AIRCRAFT. THE MODIFICATIONS AND ASSOCIATED DOCUMENTATION PERTAINING TO THESE AIRCRAFT CANNOT BE SUSTAINED BY NORMAL SOURCES SUCH AS FEDLOG OR ANY OTHER SOURCE OTHER THAN THIS CONTRACT.$804K
Sep 22, 2017Department of DefenseW6QK ACC-RSA0710336413IGF::OT::IGF ORDER 0710 (NEW ORDER UNDER BASE IDIQ CONTRACT) THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO CLEAN, REPAIR, TOUCH UP, AND PAINT THE EXTERIOR SURFACE OF ONE (1) AH-1F COBRA AIRCRAFT FOR THE EXISTING PEO AVIATION STATIC DISPLAY. ADDITIONALLY, THIS STATEMENT OF WORK CONTAINS REQUIREMENTS FOR PROGRAM MANAGEMENT AND LOGISTICS SUPPORT.$72K
Sep 21, 2017Department of DefenseW6QK ACC-RSA0713336413IGF::OT::IGF ORDER 0713 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE C-RAM PROJECT OFFICE HUMVEE KITS.$1.0M
Sep 21, 2017Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$2.8M
Sep 21, 2017Department of DefenseW6QK ACC-RSA0723336413IGF::OT::IGF THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO UPDATE THE MAST MOUNTED ASSEMBLY (MMA) TRAY ASSEMBLY DRAWINGS AND PROVIDE 254 INNER TRAY ASSEMBLIES IN THE NEW DESIGN. THE TRAY ASSEMBLIES WILL PROVIDE IMPROVED STORAGE AND TRANSPORTATION CAPABILITIES FOR THE FIRE CONTROL RADAR (FCR) AND ALLEVIATE CURRENT SCARRING ISSUES. THE EFFORT WILL ALSO PROVIDE 45 MMA STORAGE CONTAINERS THAT WILL STORE AND PROTECT THE APACHE FIRE CONTROL RADARS DURING MAINTENANCE PROCEDURES.$1.8M
Sep 20, 2017Department of DefenseW6QK ACC-RSA0705336413IGF::OT::IGF THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT IN SUPPORT OF THE LITTORAL COMBAT SHIP (LCS) PROGRAM EXECUTIVE OFFICE (PEO) PMS 505 FOR THE MAINTENANCE, REFURBISHMENT, AND MODERNIZATION OF BERTHING MODULES AND BOAT CRADLES. THIS SHALL INCLUDE ACQUISITION, SUSTAINMENT, ENGINEERING AND TEST SUPPORT.$381K
Sep 20, 2017Department of DefenseW6QK ACC-RSA0659336413IGF::OT::IGF ORDER 0659 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE MANAGEMENT, PROCUREMENT, TESTING AND INTEGRATION OF THE AERIAL RECONNAISSANCE WEATHER OFFICER (ARWO) COMPUTER ON WC-130J AIRCRAFT AND AT FIXED GROUND BASED STATIONS (GBS). INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND AIRCRAFT INTEGRATION SUPPORT PLANNING REQUIREMENTS.$1.9M
Sep 19, 2017Department of DefenseW6QK ACC-RSA0720336413IGF::OT::IGF, THIS IS A STATEMENT OF WORK. IN ORDER TO CONTINUE TO EFFECTIVELY PROVIDE BEST VALUE PRODUCTS TO OUR CUSTOMERS, A SYSTEMATIC APPROACH THAT ADDRESSES BEST PRACTICES FOR DAILY QUALITY, AUDIT AND TEST RELATED OPERATIONS IS NEEDED.$431K
Sep 18, 2017Department of DefenseW6QK ACC-RSA0681336413IGF::OT::IGF NEW ORDER FOR SOW:H-60M NATIONAL GUARD BUREAU AIRCRAFT FIELDING PACKAGE 15 AUGUST 2017 REV - A THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, DESIGN, ENGINEERING, KITTING, AND SHIPPING OF THE NATIONAL GUARD BUREAU FIELDING PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$2.7M
Sep 15, 2017Department of DefenseW6QK ACC-RSA0631336413IGF::OT::IGF , TO 631, JORDAN FMS CASE U4-B-UXA H60M DEPLOYMENT SUPPORT KIT. "EFFORT REQUIRED TO PROVIDE JORDAN H60M DEPLOYMENT SUPPORT KIT (DSK) IN SUPPORT OF FMS CASE U4-B-UXA. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS."$236K
Sep 14, 2017Department of DefenseW6QK ACC-RSA0702336413IGF::OT::IGF, ORDER 0702, RBA 19763,THIS REQUIREMENT IS ESTABLISHED TO ENSURE THAT THE SHELTERS ARE WATERTIGHT AND ALL DUST SHIELDS ARE IN PLACE. A RAIN TEST SHALL BE CONDUCTED IAW ASTM-E1977, PARAGRAPH 7.24.2 REPRESENTING FULLY INTEGRATED WEIGHT AS OPPOSED TO MAXIMUM PAYLOAD.$3.4M
Sep 14, 2017Department of DefenseW6QK ACC-RSA0691336413IGF::OT::IGF THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORTS REQUIRED TO INTEGRATE THE DE-ICE CONTROL INDICATING UNIT (DCIU) ONTO THE HH/UH-60M. THE DCIU IS A SINGLE LINE REPLACEMENT UNIT (LRU) THAT REPLACES THE THREE LEGACY LRUS (CONTROL PANEL, ICE RATE METER, AND TEST PANEL). THIS EFFORTS WILL RESULT IN AN ENGINEERING CHANGE PROPOSAL (ECP) AND TECHNICAL MANUAL UPDATES FOR BOTH THE HH/UH-60M AIRCRAFT.$962K
Sep 14, 2017Department of DefenseW6QK ACC-RSA0699336413IGF::OT::IGF THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORTS REQUIRED TO INTEGRATE THE CAUTION ADVISORY PANEL (CAP) ONTO THE HH/UH-60A/L. THE CAP NSN 1680-01-503-5250 HAS OBSOLESCENCE ISSUES WITH THE POWER SUPPLY AND REQUIRES RE-SPINNING OF THE CIRCUIT CARDS. THIS EFFORT WILL CAPTURE TEST SUPPORT TO MAINTAIN AIRWORTHINESS, AN ENGINEERING CHANGE PROPOSAL (ECP), DRAWINGS, AND TECHNICAL MANUAL UPDATES FOR THE HH/UH-60A/L AIRCRAFT.$1.1M
Sep 13, 2017Department of DefenseW6QK ACC-RSA0721336413IGF::OT::IGF, THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT TO PROVIDE DAMAGE ASSESSMENT AND REPAIR OR REPLACEMENT OF 16 EXTENDED RANGE FUEL SYSTEMS (ERFS) THAT HAVE SUSTAINED COMBAT AND/OR OTHER OPERATIONAL DAMAGE. THE ERFS IS AN INTERNAL TANK FUEL SYSTEM THAT PROVIDES THE CH-47 WITH THE CAPABILITY TO FLY FOR AN EXTENDED PERIOD OF TIME. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$1.9M
Sep 13, 2017Department of DefenseW6QK ACC-RSA0498336413IGF::CL::IGF:: COMMON AVIATION TOOL SYSTEM PLUS (CATS+)$328K
Sep 13, 2017Department of DefenseW6QK ACC-RSA0451336413IGF::OT::IGF MODIFICATION OF TWO (2) UH-60M AIRCRAFT WITH UNIQUE MISSION EQUIPMENT FOR THE U.S. FEDERAL BUREAU OF INVESTIGATIONS (FBI).$258K
Sep 13, 2017Department of DefenseW6QK ACC-RSA0521336413IGF::OT::IGF OEP 17940 H-60M MAIN ROTOR BLADE CUFF REPAIR$588K
Sep 11, 2017Department of DefenseW6QK ACC-RSA0638336413IGF::OT::IGF, THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE THREE (3) BATTERY TRAY SETS FOR THE NUWC DIVISION KEYPORT (KPT) SPECIAL OPERATIONS FORCES TEAM.$204K
Sep 11, 2017Department of DefenseW6QK ACC-RSA0698336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO UPGRADE NINE (9) ASE UNIVERSAL A-KIT TEST SETS TO THE CURRENT DRAWING 1058922 REV 06.$671K
Sep 11, 2017Department of DefenseW6QK ACC-RSA0686336413IGF::OT::IGF... NEW ORDER ...... THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO BUILD A LITHIUM-ION BATTERY CHARGING CONTAINER FOR THE ATLANTIC UNDERSEA TEST AND EVALUATION CENTER (AUTEC). THIS CONTAINER IS FOR THE CHARGING OF LITHIUM-ION BATTERIES IN AUTONOMOUS UNDERWATER VEHICLES.$159K
Sep 8, 2017Department of DefenseW6QK ACC-RSA0487336413IGF::OT::IGF NEW TASK ORDER FOR COMPLETION OF BLUE FORCE TRACKING-2 (BFT-2) INTEGRATION DEVELOPMENT FOR AH-64$216K
Sep 6, 2017Department of DefenseW6QK ACC-RSA0693336413IGF::OT::IGF THE CONTRACTOR SHALL: REDESIGN THE RIFLE MOUNT TO ACCOMMODATE M-4 RIFLES WITHOUT REQUIRING FULL EXTENSION OF THE BUTTSTOCK AND M-16 RIFLES AND INTEGRATE THE DESIGN. DESIGN A MEANS OF INSTALLATION/REMOVAL OF EITHER THE CURRENT UNINTERRUPTABLE POWER SUPPLY (UPS) OR A REPLACEMENT UPS THAT CONFORMS TO AR 602-2, IAW MIL-STD-1472 AS WELL AS, DESIGN AND INSTALL ANY MOUNTING, CABLING AND INTERFACING TO THE CURRENT TOCNET CONFIGURATION AND USER INTERFACE. REMOVE THE NON-DIRECTIONAL BEACON MONITOR. RESEARCH AND INSTALL A SOLUTION FOR THE REDESIGN OF CURRENT MOTS SKIDS TO ALLOW FOR LIFTING BY STANDARD LENGTH FORKLIFT FORKS AND ELIMINATE THE POTENTIAL FOR SHELTER DAMAGE IN MATING/UN-MATING OF SHELTER FROM PRIME MOVER. DESIGN AND INSTALL AN ALTERNATIVE REPLACEMENT RJ21 CONNECTOR FOR THE 90 DEGREE CABLE CONNECTOR CURRENTLY USED ON THE ADTRAN CABLE FOR MOTS. PROVIDE LOGISTICS DATA SUPPORT TO INCLUDE ONE FIELD LEVEL MODIFICATION WORK ORDER TO REMOVE THE V200 COMPUTER TABLET, APPLICABLE HARDWARE AND MOUNTING BRACKET AND TO INSTALL THE V110 COMPUTER TABLET, APPLICABLE HARDWARE AND MOUNTING BRACKET; ALONG WITH, A DEPOT LEVEL MWO TO INCORPORATE ALL OTHER CHANGES RESULTING FROM THIS EFFORT. MODIFY GOVERNMENT FURNISHED MOTS ACCEPTANCE TEST PLAN TO INCORPORATE CHANGES TO THE SYSTEM IAW DI-MISC-80508. RECOMMEND CHANGES TO TM 11-5895-1880-10HR, TM 11-5895-1880-10 AND TM 11-5895-1880-23&P AND EXISTING TRAINING MATERIAL.$2.7M
Sep 6, 2017Department of DefenseW6QK ACC-RSA0651336413IGF::OT::IGF ORDER 0651 STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AN EVALUATION OF THE CRITICAL COMPONENTS WITHIN THE TOPOGRAPHIC SUPPORT SET (TSS) AND ITS ANCILLARY EQUIPMENT WITH RESPECT TO OBSOLESCENCE, REPAIR REQUIREMENTS, AND SUPPORTABILITY, AS WELL AS TO REPAIR A SUBSET OF THE EVALUATED COMPONENTS USING RESIDUAL GOVERNMENT FURNISHED MATERIAL (GFM) INVENTORIES AND RETURN THEM TO SERVICE. IN 2007, THE NAVAL AIR SYSTEMS COMMAND (NAVAIR) PARTNERED WITH THE AVIATION&MISSILE RESEARCH DEVELOPMENT AND ENGINEERING CENTER (AMRDEC) PROTOTYPE INTEGRATION FACILITY (PIF) TO BUILD A LIMITED QUANTITY OF TOPOGRAPHIC SUPPORT SET (TSS) SYSTEMS FOR THEIR SPECIAL FORCES. SINCE 2007, THE NAVAIR HAS TRANSITIONED CONTROL OF THE ASSET TO THE NAVAL SUPPLY SYSTEMS COMMAND (NAVSUP), AND PROTOTYPE AND INTEGRATION FACILITY (PIF) HAS PROVIDED PERIODIC SUPPORT FOR DAMAGE ASSESSMENT AND REPAIR DUE TO THEIR UNIQUE KNOWLEDGE OF THE SYSTEM. TODAY, MANY OF THE TSS COMPONENTS HAVE BECOME OBSOLETE AND THE SOURCES OF SUPPLY ARE NO LONGER AVAILABLE, YET THE NAVY MUST CONTINUE TO MAINTAIN THE SYSTEM UNTIL THE REPLACEMENT SYSTEM IS QUALIFIED AND FIELDED, WHICH IS NOT EXPECTED UNTIL 2022.$397K
Sep 5, 2017Department of DefenseW6QK ACC-RSA0309336413IGF::OT::IGF TASK ORDER 0309, OEP 16189.$40K
Sep 5, 2017Department of DefenseW6QK ACC-RSA0562336413IGF::OT::IGF ENGINEERING SUPPORT INCLUDES DRAWING UPDATES, ENGINEERING CHANGES PROPOSALS (ECPS), ACCEPTANCE TEST SUPPORT, TROUBLESHOOTING/RESOLVING ISSUES THAT ARISE DURING ACCEPTANCE TESTING, BI-WEEKLY MEETING SUPPORT, REQUEST FOR VARIANCE (RFV) REVIEWS, AND UPDATES/INPUT FOR FORM 2028 IN SUPPORT OF LOGISTIC PRODUCT CHANGES.$199K
Aug 31, 2017Department of DefenseW6QK ACC-RSA0677336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO SUPPORT THE REPAIR OF THE ARC-231 MULTI-MODE AVIATION RADIO REPAIR PROGRAM FOR THE RECEIVER, TRANSMITTER (RT), RT-1808A FOR LUH. THIS EFFORT INCLUDES A BASE EFFORT AND ONE (1) OPTION.$606K
Aug 30, 2017Department of DefenseW6QK ACC-RSA0689336413IGF::OT::IGF, THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO BUILD A LITHIUM-ION BATTERY CHARGING CONTAINER FOR THE NAVAL UNDERSEA WARFARE CENTER KEYPORT (NUWC-KEYPORT). THIS CONTAINER IS FOR THE CHARGING AND TESTING OF LITHIUM-ION BATTERIES IN AUTONOMOUS UNDERWATER VEHICLES.$300K
Aug 28, 2017Department of DefenseW6QK ACC-RSA0648336413IGF::OT::IGF THE STATEMENT OF WORK DEFINES THE EFFORT REQUIRED FOR TEARDOWN, DEPOPULATION OF CRASH DAMAGED AIRCRAFT (CDA) AND SHIPMENT AS REQUIRED, REPAIR OF APACHE AIRCRAFT AND PROCUREMENT/REPAIR/SUPPORT OF EQUIPMENT SYSTEMS AND PECULIAR GROUND SUPPORT EQUIPMENT (PGSE). MODELING OF AIRCRAFT PART/SYSTEM DATA CAPTURE AND ANALYSIS TO INCLUDE 3D PRINTING/MODELED OF AH-64 AIRFRAME, SENSOR, SIGHTING, ELECTRICAL, DRIVETRAIN COMPONENTS AND ENGINE COMPONENTS, POINT CLOUD DATA CAPTURE AND POST PROCESSING AS DIRECTED WILL BE REQUIRED. MODERNIZED SIGNAL PROCESSING UNIT (MSPU) SOFTWARE DEVELOPMENT, FABRICATING OR PROCURING OF PARTS, KITS, SPECIAL TOOLS, PROVIDING DESIGNATED ENGINEERING SUPPORT FOR APACHE TRAINING SYSTEMS, SUSTAINMENT SUPPORT OF NEW EQUIPMENT TRAINING TEAM (NETT) TRAILER, DATABASE MANAGEMENT OF GFE, GFI, CDA PARTS, AND SUPPORT FOR ALL ASSOCIATED TRAVEL REQUIREMENTS. ADDITIONAL TASKS WILL BE ON SIGHT WEIGHING OF COMPLETED TRAINING DEVICES AND WEIGHT AND BALANCE FORM GENERATION.$1.5M
Aug 17, 2017Department of DefenseW6QK ACC-RSA0690336413IGF::OT::IGF, THIS SOW FOR TO 0690 DEFINES THE EFFORT REQUIRED TO INTEGRATE THREE (3) UH-60L AIRCRAFT WITH THE CAPTIVE FLIGHT TEST (CFT) EQUIPMENT AT WHITE SANDS MISSILE RANGE.$280K
Aug 17, 2017Department of DefenseW6QK ACC-RSA0559336413IGF::OT::IGF STATEMENT OF WORK FOR THE ENVIRONMENTAL ACOUSTIC RECORDING SYSTEM (EARS) SUPPORT.$313K
Aug 16, 2017Department of DefenseW6QK ACC-RSA0504336413IGF::OT::IGF: OEP 17696 PATRIOT LOGISTICS SUPPORT$348K
Aug 14, 2017Department of DefenseW6QK ACC-RSA0501336413IGF::OT::IGF$79K
Aug 10, 2017Department of DefenseW6QK ACC-RSA0668336413IGF::OT::IGF, NEW TASK ORDER 0668, OEP 19551, "PROVIDE THE UNITED STATES NAVY WITH A PROTOTYPE POWER DISTRIBUTION UNIT ASSEMBLY FOR THE LITTORAL COMBAT SHIP."$648K
Aug 9, 2017Department of DefenseW6QK ACC-RSA0696336413IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED FOR THE MANUFACTURING AND DELIVERY OF 156 EELS KITS: 93 PERSONNEL (P) KITS IAW 7013100-1; 39 COMMAND (C) KITS IAW 7013100-2; 24 RECOVERY (R) KITS IAW 7013100-3; 100 SETS OF FLEX TRACK; AND FINAL INITIAL ISSUE PROVISIONING (IIP) COMPONENTS, TO INCLUDE 15 WATER SENSORS AND 2 EELS TEST SETS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$952K
Aug 8, 2017Department of DefenseW6QK ACC-RSA0604336413IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE AND INTEGRATE UH-60L AIRCRAFT WITH THE EXTERNAL STORES SUPPORT SYSTEM (ESSS) MOUNTED RESCUE HOIST (EMRH). THE INTEGRATION OF THE EMRH WILL RESOLVE INTERFERENCE ISSUES WITH MEDEVAC MISSION KITS.$696K
Aug 7, 2017Department of DefenseW6QK ACC-RSA0678336413IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE TWO (2) AIRFIELD PROTECTION TEST ASSETS IAW THE GOVERNMENT FURNISHED PRELIMINARY TDP.$1.0M
Aug 4, 2017Department of DefenseW6QK ACC-RSA0492336413IGF::OT::IGF NEW TASK ORDER FOR "INTEGRATION AND QUALIFICATION FOR THE H-60 L/M FEDERATED ADVANCE NAVIGATION SYSTEM (FANS)"$12K
Jul 31, 2017Department of DefenseW6QK ACC-RSA0520336413IGF::OT::IGF , TO 520, OEP 17847, "OEP 17847 SLIN 0001DA TRAVEL PRICING INFORMATION FOR CH-47 DEPOT-LEVEL MAINTENANCE WORK REQUIREMENT (DMWR) AND TECHNICAL DATA DEVELOPMENT FOR THE MAINTENANCE PANEL DIGITAL INDICATORS."$123K
Jul 31, 2017Department of DefenseW6QK ACC-RSA0589336413IGF::OT::IGF ENGINEERING, MANUFACTURING, INTEGRATION AND TESTING OF A QUANTITY OF SEVENTEEN (17) TACTICAL TERMINAL CONTROL SYSTEMS (TTCSS), PART NUMBER 1045597-101, TWO (2) CABLE SPARE SETS, THREE (3) POWER DISTRIBUTION UNITS (PDUS) SPARES AND TWO (2) SIGNAL DISTRIBUTION PANEL (SDP) SPARES.$435K
Jul 27, 2017Department of DefenseW6QK ACC-RSA0683336413IGF::OT::IGF THE CONTRACTOR SHALL PERFORM SCHEDULED MAINTENANCE, SERVICE BULLETINS, AND AIRWORTHINESS DIRECTIVES ON TWENTY-FOUR (24) UH-72A AIRCRAFT PER MASTER SERVICE MANUAL 05-11-00 AND 05-12-00 WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PROTOTYPE INTEGRATION FACILITY (PIF) CONTRACTING OFFICERS REPRESENTATIVE (COR) OF ALL SCHEDULED AND UNSCHEDULED MAINTENANCE, SERVICE BULLETINS, AND AIRWORTHINESS DIRECTIVES REQUIRED DURING AIRCRAFT MODIFICATION. THE CONTRACTOR SHALL SUBMIT A WORK REQUEST TO THE PIF COR OF ALL UNSCHEDULED MAINTENANCE REQUIRED DURING AIRCRAFT MODIFICATION IAW DI-MISC-80508/T. FOR WORK REQUESTS LESS THAN OR EQUAL TO $3,500, THE CONTRACTOR SHALL PERFORM UNSCHEDULED MAINTENANCE FOLLOWING SUBMISSION OF THE WORK REQUEST TO THE PIF COR. FOR WORK REQUESTS GREATER THAN $3,500, THE CONTRACTOR SHALL PERFORM UNSCHEDULED MAINTENANCE UPON WRITTEN APPROVAL OF THE PIF COR. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT MAINTENANCE ACTIVITIES. THE GOVERNMENT ANTICIPATES UP TO 2200 HOURS WILL BE REQUIRED DURING THE EXECUTION OF UNSCHEDULED MAINTENANCE EVENTS.$1.6M
Jul 25, 2017Department of DefenseW6QK ACC ANAD0037336992IGF::OT::IGF OTHER DIRECT COST$1.5M
Jul 21, 2017Department of DefenseW6QK ACC-RSA0688336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE A 463L PALLET ADAPTER ASSEMBLY TO SECURE A KU RADIO FREQUENCY SYSTEM (KRFS) RADAR TO A FMTV 5-TON TRUCK. THE MOUNT WILL ALLOW FOR SAFE TRANSPORT OF THE KRFS RADAR ACROSS A RUGGED DESERT ENVIRONMENT.$42K
Jul 20, 2017Department of DefenseW6QK ACC-RSA0471336413IGF::OT::IGF: AVIATION GROUND POWER SUPPORT TRAINERS$245K

Get Alerted Before Redstone Defense Systems's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free