Jul 20, 2017Department of DefenseW6QK ACC-RSA0626336413IGF::OT::IGF SOW NAVO NP3 CM/MO SUPPORT TO PROVIDE SOLUTIONS TO COMPLEX OCEANOGRAPHIC PROBLEMS FOR THE US NAVY. THE OCEANOGRAPHIC DEPARTMENT USES A VARIETY OF OCEANOGRAPHIC SYSTEMS TO COLLECT THE DATA REQUIRED TO SOLVE THESE PROBLEMS. NP3 PERFORMS ALL THE NECESSARY ENGINEERING AND LOGISTICAL FUNCTIONS REQUIRED TO MAINTAIN THESE SYSTEMS AT A HIGH LEVEL OF READINESS.$13K
Jul 19, 2017Department of DefenseW6QK ACC ANAD0038336992IGF::OT::IGF VARIOUS SUPPORT SERVICES - STRYKER PANEL$157K
Jul 10, 2017Department of DefenseW6QK ACC-RSA0685336413IGF::OT::IGF$33K
Jul 5, 2017Department of DefenseW6QK ACC-RSA0675336413IGF::OT::IGF ORDER 0675 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROGRAM MANAGEMENT, DEVELOPMENT, LOGISTICAL PLANNING, ACQUIRING HARDWARE, KITTING, DOCUMENTATION, DESIGN, INTEGRATION, SYSTEM INTEGRATION, STORAGE, TRANSPORTATION, FIELDING, PROVISIONING, AND PROVIDING TECHNICAL DATA ASSOCIATED WITH PROVISIONING OF THE AIRCRAFT ARMAMENT TOOL KIT (AARTK). THE IMPLEMENTATION OF THIS CAPABILITY IS VIA A MODIFICATION WORK ORDER (MWO) TO THE CURRENT INDIVIDUAL AIRCRAFT ARMAMENT REPAIRMEN TOOL SET (IAARTS) TO THE NEW AARTK. THE MODIFIED AARTK WILL BE ADDED TO THE CATS FAMILY OF TOOL KITS.$8.3M
Jul 5, 2017Department of DefenseW6QK ACC-RSA0636336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO SUPPORT THE LOWER TIER PROJECT OFFICE (LTPO) MANUFACTURE, INTEGRATE, TEST, AND DELIVERY OF ONE (1) PATRIOT LOAD BANK JUNCTION BOX, WHICH INCLUDES TWO (2) LOAD BANK UNITS. THE PATRIOT LOAD BANK JUNCTION BOX WILL BE USED TO ACCOMMODATE COMMERCIAL 15KW, 30KW AND 150KW POWER CONVERTERS AND TACTICAL POWER GENERATORS.$313K
Jun 29, 2017Department of DefenseW6QK ACC-RSA0660336413IGF::OT::IGF, TASK ORDER 0660, RBA 19373, "PROVIDING 45 WTI00556-001 RESCUE HOIST CABLE (GUARD) DEFLECTOR KITS, CAGE 1K9E4, IAW DRAWING 70070-20551-011, FOR UH-60A/L."$265K
Jun 29, 2017Department of DefenseW6QK ACC-RSA0687336413IGF::OT::IGF ORDER 0687 NEW REQUIREMENT FOR SOW: AH-64D AVR-2A AFT SENSOR MOUNTS. THE SOW DEFINES THE EFFORT REQUIRED TO PROVIDE ELEVEN (11) AVR-2A AFT SENSOR MOUNTS PN 4290363-501 AND TWENTY NINE (29) AVR-2A AFT SENSOR MOUNTS PN 4290363-502 FOR LOT 6; AND SIXTY FIVE (65) AVR-2A AFT SENSOR MOUNTS PN 4290363-501 AND SIXTY FIVE (65) AVR-2A AFT SENSOR MOUNTS PN 4290363-502 FOR LOT 7. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$408K
Jun 29, 2017Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$2.2M
Jun 29, 2017Department of DefenseW6QK ACC-RSA0633336413IGF::OT::IGF THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORTS REQUIRED TO INTEGRATE THE 60 KVA GENERATOR ON THE UH-60M AND HH-60M, HEREIN REFERRED TO AS THE H-60M. THE 60 KVA GENERATOR WILL REPLACE THE 45 KVA GENERATOR AND IS CURRENTLY IN USE ON THE MH-60M.$8K
Jun 28, 2017Department of DefenseW6QK ACC-RSA0671336413IGF::OT::IGF ORDER 0671 THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE TWENTY (20) W3 HARNESS ASSEMBLY FOR THE HH-60M MEDEVAC MISSION SENSOR (MMS).$152K
Jun 28, 2017Department of DefenseW6QK ACC ANAD0036336992IGF::OT::IGF. VARIOUS SUPPORT SERVICES-PLASTISOL$20K
Jun 26, 2017Department of DefenseW6QK ACC-RSA0670336413IGF::OT::IGF ORDER 0670 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE INSTALLATION OF THE RUGGEDIZED RESOLVER ONTO THE AH-64E GUN TURRET (APACHE GUN CRADLE) FOR 200 AH-64E AIRCRAFT.$819K
Jun 20, 2017Department of DefenseW6QK ACC-RSA0593336413IGF::OT::IGF CUSTOMS AND BORDER PROTECTION HH-60L AIRCRAFT 2&3 MODIFICATION$164K
Jun 20, 2017Department of DefenseW6QK ACC-RSA0672336413IGF::OT::IGF ORDER 0672 THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 152 FANS INSTALLATION KITS AND NINE (9) SPARE FANS B-KITS. THE CONTRACTOR SHALL PROVIDE 152 FANS INSTALLATION KITS IN ACCORDANCE WITH (IAW) THE GOVERNMENT FURNISHED DRAWINGS PACKAGE 1068784. INSTALLATION KITS SHALL CONTAIN A-KIT, AND THE B-KITS SHALL BE DELIVERED SEPARATELY. THE CONTRACTOR SHALL PROVIDE NINE (9) SPARE FANS B-KITS. THE CONTRACTOR SHALL PROVIDE 32 NAVIGATIONAL DATABASE LOADERS. THE CONTRACTOR SHALL PROVIDE TWO (2) YEARS OF MONTHLY NAVIGATIONAL DATABASE UPDATES FOR EACH FANS B-KIT DELIVERED AS PART OF THIS EFFORT. THE DATABASE UPDATES SHALL BE ACTIVATED UPON INSTALLATION INTO THE AIRCRAFT.$7.2M
Jun 16, 2017Department of DefenseW6QK ACC-RSA0662336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, FABRICATION, INTEGRATION, KITTING, AND DELIVERY OF TWENTY-FIVE (25) AH-1Z COBRA MISSION GRIP MOUNT SETS. EACH SET CONSISTS OF A PILOT AND CO-PILOT MOUNT.$77K
Jun 16, 2017Department of DefenseW6QK ACC-RSA0464336413IGF::OT::IGF NEW TASK ORDER FOR "PATRIOT FIBER OPTIC MODEM ECP SUPPORT".$59K
Jun 15, 2017Department of DefenseW6QK ACC-RSA0669336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AND TEST 20 GROUP A AND 20 GROUP B MC-130J DEFENSIVE SYSTEM UPGRADE (DSU) KITS WITH AN OPTION TO INSTALL THE MC-130J DSU KIT ON NINE (9) MC-130J AIRCRAFT.$1.8M
Jun 13, 2017Department of DefenseW6QK ACC-RSA0655336413DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE CH-47F ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT. IGF::OT::IGF$5.5M
Jun 8, 2017Department of DefenseW6QK ACC-RSA0601336413IGF::OT::IGF, ORDER 0601 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, PROVISIONING, KITTING, AND DELIVERY OF MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS AND APACHE PARTS. THIS INCLUDES APACHE MODERNIZATION SUPPORT MATERIAL COMPRISING OF AIRCRAFT SURVIVABILITY PRODUCT IMPROVEMENT (ASPI) (AH-64D) (LEGACY/TEST FLIGHT) AND AH-64E (IMPROVED) KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS. ADDITIONALLY, THE CONTRACTOR WILL VERIFY THE APACHE MODIFICATION KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT/SUSTAINMENT OF MODIFICATION WORK ORDER (MWO) AND OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$1.8M
Jun 7, 2017Department of DefenseW6QK ACC-RSA0656336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE ONE-HUNDRED AND TWENTY-SEVEN (127) TWINAX TOOL KITS. THE KITS WILL BE USED TO SUPPORT CRITICAL GROUND MAINTENANCE TASKS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$287K
Jun 5, 2017Department of DefenseW6QK ACC-RSA0556336413IGF::OT::IGF NAVO REMUS AUV SUPPORT$100K
Jun 1, 2017Department of DefenseW6QK ACC-RSA0596336413IGF::OT::IGF PROVIDE FORTY-FIVE (45) AURS MK112 MOD2S, FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES, FIVE (5) DYNAMIC LOAD BACK CONTROLLERS (DLBC), AND TEN (10) VPT CABLES. THIS SOW ALSO DEFINES AN OPTION FOR AN ADDITIONAL FORTY-FIVE (45) AURS MK112 MOD2S AND FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES.$949K
May 31, 2017Department of DefenseW6QK ACC-RSA0676336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES TASKS REQUIRED TO DESIGN, DEVELOP, QUALIFY, TEST, AND INTEGRATE THE MODERNIZED ELECTRONIC STANDBY INSTRUMENT SYSTEM (ESIS) ON THE CH-47F HELICOPTER. THE CONTRACTOR SHALL PERFORM ALL ENGINEERING ACTIVITIES TO FULLY INTEGRATE THE GH-4001 INTO A FULL ESIS. THE CONTRACTOR SHALL COMPLETE ALL ACTIVITIES TO STRUCTURALLY INTEGRATE THESE COMPONENTS. ENGINEERING DATA SHALL BE PROVIDED TO SUPPORT AN AIR WORTHINESS RELEASE (AWR) AND A MODIFICATION WORK ORDER (MWO) AND TECHNICAL MANUALS WILL BE REQUIRED TO SUPPORT THE FIELDING OF THE EQUIPMENT. THE CONTRACTOR SHALL CONDUCT A VALIDATION AND VERIFICATION AIRCRAFT INSTALL. . THE CONTRACTOR SHALL PROVIDE ENGINEERING SUPPORT DURING THE CONDUCT ALL GOVERNMENT LED TEST EVENTS. THE CONTRACTOR SHALL CREATE ALL SUPPORTING DOCUMENTATION; AND COMPLETE VALIDATION AND VERIFICATION OF DRAWINGS, MWO, TECHNICAL MANUALS, AND PROVISIONING DATA. AFTER SUCCESSFUL COMPLETION OF A MAINTENANCE OPERATIONAL CHECK (MOC), THE MODIFIED AIRCRAFT SHALL BE DEEMED AIRWORTHY IAW THE QUALIFICATION REQUIREMENTS ESTABLISHED BY THE AVIATION ENGINEERING DIRECTORATE (AED) AND READY FOR ISSUANCE TO THE CUSTOMER.$1.1M
May 31, 2017Department of DefenseW6QK ACC ANAD0033336992IGF::OT::IGF. VARIOUS SUPPORT SERVICES FOR THE PART PROCESSING OF TWO JAB DRAWINGS TO BUILD UNDERBODY ARMOR KITS.$75K
May 25, 2017Department of DefenseW6QK ACC-RSA0657336413IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE M4 GUN MOUNT KITS, IAW GFI DRAWING #1055839, PILOT P/N 1055840 AND CPG P/N 1055866-101 FOR (30) AH-64D APACHE AIRCRAFT.$162K
May 24, 2017Department of DefenseW6QK ACC-RSA0315336413IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) .$8.5M
May 23, 2017Department of DefenseW6QK ACC-RSA0640336413IGF::OT::IGF , TASK ORDER 0640, OEP 19068, "PROVIDE AND INSTALL FOUR (4) FAST ROPE INSERTION EXTRACTION SYSTEM (FRIES) CONVERSION KITS AND FOUR (4) FRIES B KITS."$349K
May 16, 2017Department of DefenseW6QK ACC-RSA0589336413IGF::OT::IGF ENGINEERING, MANUFACTURING, INTEGRATION AND TESTING OF A QUANTITY OF SEVENTEEN (17) TACTICAL TERMINAL CONTROL SYSTEMS (TTCSS), PART NUMBER 1045597-101, TWO (2) CABLE SPARE SETS, THREE (3) POWER DISTRIBUTION UNITS (PDUS) SPARES AND TWO (2) SIGNAL DISTRIBUTION PANEL (SDP) SPARES.$492K
May 15, 2017Department of DefenseW6QK ACC-RSA0679336413IGF::OT::IGF THIS REQUIREMENT WILL MODIFY 1 APACHE AH-64E BY INSTALLING 1 EACH OF THE KITS LISTED IN THE ATTACHMENT 1 OF THE SOW. THE CONTRACTOR SHALL ENSURE 100% KIT ACCURACY AND REMEDY ANY DEFICIENCIES. THE CONTRACTOR SHALL REDLINE CHANGES TO THE TECHNICAL DATA PACKAGE. THE CONTRACTOR SHALL FABRICATE AND DELIVER 1 EACH OF THE ITEMS LISTED AS TOOLING.$246K
May 11, 2017Department of DefenseW6QK ACC-RSA0663336413IGF::OT::IGF, THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE RADBO PRODUCT LEVEL DRAWINGS AND ENGINEERING SUPPORT TO THE DIRECTED ENERGY WEAPONS (DEW) BOARD AND CYBERSECURITY IPT.$2.3M
May 11, 2017Department of DefenseW6QK ACC-RSA0653336413IGF::OT::IGF NEW ORDER 0653 (INCREMENTALLY FUNDED) THIS STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENTS FOR THE DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE H-60 ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT.$7.0M
May 8, 2017Department of DefenseW6QK ACC-RSA0622336413IGF::OT::IGF ORDER 0622 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROTOTYPE INTEGRATION FACILITY TO PROVIDE TECHNICAL AND ENGINEERING SUPPORT TO THE PRECISION FIRES ROCKET AND MISSILE SYSTEMS (PFRMS) PROJECT OFFICE CONCERNING HUMAN FACTORS AND ERGONOMICS (HFE) ISSUES FOR THE M270A1 IMPROVED ARMORED CAB (IAC) PROGRAM. THE M270A1 IAC IS DESIGNED TO INCREASE CREW SURVIVABILITY AGAINST IMPROVISED EXPLOSIVE DEVICES (IEDS), ARTILLERY FRAGMENTATION AND SMALL ARMS FIRE. IAC UPGRADES HAVE INVOLVED NUMEROUS DESIGN CHANGES TO THE M270A1 CAB AND IN SOME CASES HAVE CAUSED HFE.$14K
May 8, 2017Department of DefenseW6QK ACC-RSA0648336413IGF::OT::IGF THE STATEMENT OF WORK DEFINES THE EFFORT REQUIRED FOR TEARDOWN, DEPOPULATION OF CRASH DAMAGED AIRCRAFT (CDA) AND SHIPMENT AS REQUIRED, REPAIR OF APACHE AIRCRAFT AND PROCUREMENT/REPAIR/SUPPORT OF EQUIPMENT SYSTEMS AND PECULIAR GROUND SUPPORT EQUIPMENT (PGSE). MODELING OF AIRCRAFT PART/SYSTEM DATA CAPTURE AND ANALYSIS TO INCLUDE 3D PRINTING/MODELED OF AH-64 AIRFRAME, SENSOR, SIGHTING, ELECTRICAL, DRIVETRAIN COMPONENTS AND ENGINE COMPONENTS, POINT CLOUD DATA CAPTURE AND POST PROCESSING AS DIRECTED WILL BE REQUIRED. MODERNIZED SIGNAL PROCESSING UNIT (MSPU) SOFTWARE DEVELOPMENT, FABRICATING OR PROCURING OF PARTS, KITS, SPECIAL TOOLS, PROVIDING DESIGNATED ENGINEERING SUPPORT FOR APACHE TRAINING SYSTEMS, SUSTAINMENT SUPPORT OF NEW EQUIPMENT TRAINING TEAM (NETT) TRAILER, DATABASE MANAGEMENT OF GFE, GFI, CDA PARTS, AND SUPPORT FOR ALL ASSOCIATED TRAVEL REQUIREMENTS. ADDITIONAL TASKS WILL BE ON SIGHT WEIGHING OF COMPLETED TRAINING DEVICES AND WEIGHT AND BALANCE FORM GENERATION.$4.8M
May 8, 2017Department of DefenseW6QK ACC-RSA0664336413IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO REPAIR H-60M OUTBOARD STABILATORS. THE UH-60 PMO HAS AN URGENT NEED TO REPAIR THE DAMAGED STABILATORS WITHIN THEIR CURRENT INVENTORY TO MEET FIELDING REQUIREMENTS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT REQUIREMENTS. THIS IS A FOLLOW-ON TO EFFORTS BEING COMPLETED ON CONTRACT W58RGZ12D0089 TASK ORDERS 0483 AND 0114.$1.0M
May 4, 2017Department of DefenseW6QK ACC-RSA0604336413IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE AND INTEGRATE UH-60L AIRCRAFT WITH THE EXTERNAL STORES SUPPORT SYSTEM (ESSS) MOUNTED RESCUE HOIST (EMRH). THE INTEGRATION OF THE EMRH WILL RESOLVE INTERFERENCE ISSUES WITH MEDEVAC MISSION KITS.$2.1M
May 3, 2017Department of DefenseW6QK ACC-RSA0658336413IGF::OT::IGF, TO 658, OEP 19288, "PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES LO-B-UCI AND KS-B-ZCV FOR SLOVAKIA AND KOREA."$6.2M
May 3, 2017Department of DefenseW6QK ACC-RSA0596336413IGF::OT::IGF PROVIDE FORTY-FIVE (45) AURS MK112 MOD2S, FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES, FIVE (5) DYNAMIC LOAD BACK CONTROLLERS (DLBC), AND TEN (10) VPT CABLES. THIS SOW ALSO DEFINES AN OPTION FOR AN ADDITIONAL FORTY-FIVE (45) AURS MK112 MOD2S AND FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES.$2.6M
May 3, 2017Department of DefenseW6QK ACC-RSA0451336413IGF::OT::IGF MODIFICATION OF TWO (2) UH-60M AIRCRAFT WITH UNIQUE MISSION EQUIPMENT FOR THE U.S. FEDERAL BUREAU OF INVESTIGATIONS (FBI).$2.3M
Apr 28, 2017Department of DefenseW6QK ACC ANAD0035336992IGF::OT::IGF VARIOUS SUPPORT SERVICES FOR ULTRASONIC TESTING FOR THE JOINT ASSAULT BREACHER (JAB) PROGRAM.$6K
Apr 20, 2017Department of DefenseW6QK ACC-RSA0666336413IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORTS FOR THE CONTRACTOR TO PROVIDE TECHNICAL AND ENGINEERING SUPPORT OF THREE (3) LOWER TIER PROJECT OFFICE PATRIOT LAUNCHER STATIONS, ONE (1) VIRTUAL LAUNCHER STATION; ASSIST IN DEVELOPING AND MAINTAINING THREAT SIMULATION MODELING FOR THE PATRIOT SIMULATION COMMUNITY; PROVIDE TECHNICAL SUPPORT FOR LAUNCHER STATION TEST SET (LSTS) ETHERNET INTERFACE; AND SUPPORT MODIFICATIONS AND TEST TO PATRIOT FIELDING EQUIPMENT. THE CONTRACTOR SHALL PROVIDE DIAGNOSTIC TESTING OF THE LAUNCHER AND ENGINEERING SUPPORT OF THREE (3) GOVERNMENT FURNISHED PATRIOT LAUNCHERS, ONE (1) LAUNCHER STATION TEST SET AND ONE (1) GOVERNMENT FURNISHED VIRTUAL LAUNCHER STATION.THE CONTRACTOR SHALL ASSIST ENGINEERS IN DEVELOPING AND MAINTAINING SIMULATION MODELS FOR PATRIOT LAUNCHER.$100K
Apr 20, 2017Department of DefenseW6QK ACC-RSA0635336413THE STATEMENT OF WORK REQUIRES THE CONTRACTOR TO PROVIDE MEXICO AIR FORCE H60M INITIAL ACCEPTANCE SUPPORT PACKAGE IN SUPPORT OF FMS CASE MX-B-UES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. IGF::OT::IGF$554K
Apr 19, 2017Department of DefenseW6QK ACC-RSA0655336413DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE CH-47F ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT. IGF::OT::IGF$1.8M
Apr 6, 2017Department of DefenseW6QK ACC-RSA0672336413IGF::OT::IGF ORDER 0672 THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 152 FANS INSTALLATION KITS AND NINE (9) SPARE FANS B-KITS. THE CONTRACTOR SHALL PROVIDE 152 FANS INSTALLATION KITS IN ACCORDANCE WITH (IAW) THE GOVERNMENT FURNISHED DRAWINGS PACKAGE 1068784. INSTALLATION KITS SHALL CONTAIN A-KIT, AND THE B-KITS SHALL BE DELIVERED SEPARATELY. THE CONTRACTOR SHALL PROVIDE NINE (9) SPARE FANS B-KITS. THE CONTRACTOR SHALL PROVIDE 32 NAVIGATIONAL DATABASE LOADERS. THE CONTRACTOR SHALL PROVIDE TWO (2) YEARS OF MONTHLY NAVIGATIONAL DATABASE UPDATES FOR EACH FANS B-KIT DELIVERED AS PART OF THIS EFFORT. THE DATABASE UPDATES SHALL BE ACTIVATED UPON INSTALLATION INTO THE AIRCRAFT.$6.2M
Apr 6, 2017Department of DefenseW6QK ACC-RSA0559336413IGF::OT::IGF STATEMENT OF WORK FOR THE ENVIRONMENTAL ACOUSTIC RECORDING SYSTEM (EARS) SUPPORT.$231K
Mar 31, 2017Department of DefenseW6QK ACC-RSA0609336413IGF::OT::IGF ORDER 0609 CORRECT DESIGN DEFICIENCIES IN THE INTERIM MEDEVAC MISSION SUPPORT SYSTEM (IMMSS) AS PRESENTED IN AIRWORTHINESS IMPACT STATEMENT (AWIS) 12-066. THIS PROGRAM IS DIVIDED INTO MULTIPLE STAGES. STAGE 1 (ORDER 0178) RESULTED IN A SYSTEM REQUIREMENTS REVIEW (SRR) THAT DETAILED THE PATH AHEAD FOR THE REST OF THE PROGRAM. STAGE 2 (ORDER 0292) PROVIDED THE NON-RECURRING ENGINEERING (DEVELOPMENT OF THE DESIGN CHANGE AND UPDATES TO THE MODIFICATION WORK ORDER (MWO), PUBLICATIONS, AND PROVISIONING). STAGE 3 (THIS SOW) WILL PROVIDE MANUFACTURING AND FIELDING OF 208 RETROFIT KITS.$1.8M
Mar 30, 2017Department of DefenseW6QK ACC-RSA0639336413IGF::OT::IGF ORDER 0639 NEW TASK ORDER FOR FY17 H-60M NATIONAL GUARD COMBAT AVIATION BRIGADE (NG CAB) INITIAL AIRCRAFT FIELDING PACKAGE. THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, DESIGN, ENGINEERING, KITTING, AND SHIPPING OF THE FY17 H-60M INITIAL FIELDING PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$7.7M
Mar 29, 2017Department of DefenseW6QK ACC-RSA0377336413INTEGRATION OF THE IMPROVED DURABILITY GEARBOX ON THE UH-60A$203K
Mar 28, 2017Department of DefenseW6QK ACC-RSA0667336413IGF::OT::IGF THE STATEMENT OF WORK REQUIRES THE CONTRACTOR TO PROVIDE 125 AVR-2B LASER DETECTION SYSTEM (LDS) A-KITS.$7.7M
Mar 27, 2017Department of DefenseW6QK ACC-RSA0653336413IGF::OT::IGF NEW ORDER 0653 (INCREMENTALLY FUNDED) THIS STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENTS FOR THE DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE H-60 ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT.$5.3M
Mar 23, 2017Department of DefenseW6QK ACC-RSA0651336413IGF::OT::IGF ORDER 0651 STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AN EVALUATION OF THE CRITICAL COMPONENTS WITHIN THE TOPOGRAPHIC SUPPORT SET (TSS) AND ITS ANCILLARY EQUIPMENT WITH RESPECT TO OBSOLESCENCE, REPAIR REQUIREMENTS, AND SUPPORTABILITY, AS WELL AS TO REPAIR A SUBSET OF THE EVALUATED COMPONENTS USING RESIDUAL GOVERNMENT FURNISHED MATERIAL (GFM) INVENTORIES AND RETURN THEM TO SERVICE. IN 2007, THE NAVAL AIR SYSTEMS COMMAND (NAVAIR) PARTNERED WITH THE AVIATION&MISSILE RESEARCH DEVELOPMENT AND ENGINEERING CENTER (AMRDEC) PROTOTYPE INTEGRATION FACILITY (PIF) TO BUILD A LIMITED QUANTITY OF TOPOGRAPHIC SUPPORT SET (TSS) SYSTEMS FOR THEIR SPECIAL FORCES. SINCE 2007, THE NAVAIR HAS TRANSITIONED CONTROL OF THE ASSET TO THE NAVAL SUPPLY SYSTEMS COMMAND (NAVSUP), AND PROTOTYPE AND INTEGRATION FACILITY (PIF) HAS PROVIDED PERIODIC SUPPORT FOR DAMAGE ASSESSMENT AND REPAIR DUE TO THEIR UNIQUE KNOWLEDGE OF THE SYSTEM. TODAY, MANY OF THE TSS COMPONENTS HAVE BECOME OBSOLETE AND THE SOURCES OF SUPPLY ARE NO LONGER AVAILABLE, YET THE NAVY MUST CONTINUE TO MAINTAIN THE SYSTEM UNTIL THE REPLACEMENT SYSTEM IS QUALIFIED AND FIELDED, WHICH IS NOT EXPECTED UNTIL 2022.$456K