152 Intel Sound Masking Equipment Installation
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
W50S8C26QA017
NAICS
334310
PSC
5965
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 27, 2026
Response due
August 11, 2026
Place of performance
NV
Description
1
Ver. April 2026
CUI
CUI
PERFORMANCE WORK STATEMENT (PWS)
FOR
152IS Sound Masking Installation
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials,
supervision, and quality control necessary, except as specified in Paragraph 3.0 as
Government Furnished, to perform Services, as defined in this PWS.
1.1.1 Objectives: Installing a Sound Masking System within Building 600 to cover all
corridors and hallways within Building 600 2nd Floor SCIF at Reno ANG.
1.2 Background: Installing a Sound Masking System within Building 600 to cover all
corridors and hallways within the SCIF at Reno ANG. This includes all loudspeakers,
wiring or cabling, accessories, ceiling mounts, system controller, and necessary power
supply(s). Loudspeakers will be ceiling mounted also known as recessed ceiling
mounting. Other than 16ft x 15ft landing, hallways range from 5ft to 7.5ft wide and have
an accumulated sum of 398ft 9in long with a 9ft ceiling that is suspended drop. Please
see attachment for more specific dimensions on areas to be sound masked. Sound
masking equipment will include a centralized control panel to control volume and
equalizer levels for masking as well as support audio input modules. Centralized control
panel will be located in the identified room on attachment, northeast of the SCIF
Entry/Exit Area.
1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of
12 months.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services
between the hours of 0730-1700 on Monday through Friday, except on recognized US
holidays or when the Government facility/installation is closed due to local or national
emergencies, administrative closings, or similar Government-directed facility/installation
closings. Performance shall be at building 600. The contractor shall at all times maintain
an adequate work force for the uninterrupted performance of all tasks defined within this
PWS when the Government facility/installation is not closed for the above reasons.
When hiring personnel, the contractor shall keep in mind that the stability and continuity
of the work force are essential. Teleworking is not authorized.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support
of this requirement. This is due to the requirement requiring in-person modifications,
installations, and assembly for the requirement. In furtherance of Continuity of
Operations Planning (COOP), a telework program may be enacted to ensure that the
-- 1 of 14 --
2
Ver. April 2026
CUI
CUI
Government's mission-critical operations stay operational during times of national
emergency or incidents of national significance. Telework shall be at no additional cost
to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time
causing all personnel entering or exiting a closed installation to experience a delay. This
cannot be predicted or prevented. Contractors are not compensated for unexpected
closures or delays. Vehicles operated by contractor personnel are subject to search
pursuant to applicable regulations. Any moving violation of any applicable motor vehicle
regulation may result in the termination of the contractor employee’s installation driving
privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations
of the installation; including fire, traffic, safety and security regulations while on the
installation. Contractor employees should only enter restricted areas when required to
do so and only upon prior approval. All contractor employees shall carry proper
identification with them at all times, and shall be subject to such checks as may be
deemed necessary. The contractor shall ensure compliance with all regulations and
orders of the installation, which may affect performance. The Government reserves the
right to direct the removal of an employee from Government property or revoke access
to Government systems for misconduct, security reasons, or any overt evidence of
communicable disease. Removal of contractor employees for reasons stated above
does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC
Plan (QCP) to ensure services are performed in accordance with this PWS. The
contractor shall develop and implement procedures to identify, prevent, and ensure non-
recurrence of defective services. The contractor’s QCP is the means by which it assures
itself that its work complies with the requirements of the contract. As a minimum, the
contractor shall develop QC procedures that address the areas identified in Technical
Exhibit 1, Performance Requirements Summary (PRS).
-- 2 of 14 --
3
Ver. April 2026
CUI
CUI
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s
performance under this contract in accordance with the Quality Assurance Surveillance
Plan (QASP). This plan is primarily focused on what the Government will do to ensure
that the contractor has performed in accordance with the performance standards. It
defines how the performance standards will be applied, the frequency of surveillance,
and acceptable quality level(s) or defect rate(s).
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor
shall comply with all applicable installation/facility access and local security …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 334310)
Wearable Full-Body Inertial Measurement Unit (IMU) Motion Capture System
COMMERCE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 7, 2026
BSAT VTC Fort Detrick Bldg 1546
DEPT OF DEFENSE · Solicitation · due August 7, 2026
Video Teleconferencing (VTC) Upgrade - Cannon AFB, NM
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 30, 2026
Conference Room DVLED Audio and Video System Upgrade
DEPT OF DEFENSE · Solicitation · due August 11, 2026
Audio-Visual System Upgrade-193 OPS Blue Room
DEPT OF DEFENSE · Solicitation · due July 29, 2026