What this opportunity is
The Department of Veterans Affairs is seeking to modernize campus corridors at the Togus, ME VAMC, under NAICS code 236220. This project is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and is classified as a solicitation notice, indicating that interested parties should prepare to submit bids. Contractors should be aware of the detailed specifications outlined in the solicitation, which includes various construction and renovation requirements.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Above Group, Inc.
305 East Dr. Suite H
Melbourne, FL 32904
321.345.9026 ph
www.abovegroupinc.com
Department of Veterans Affairs
Medical Center
VAMC Togus
1 VA Center
Augusta ME 04330
Modernize Campus Corridors
Togus, ME VAMC
Final Bid Specifications
36C24123C0002 | 402-23-794
April 10, 2025
-- 1 of 543 --
11-01-23
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21
01 33 23 Shop Drawings, Product Data, and Samples 11-23
01 35 26 Safety Requirements 11-23
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements
DIVISION 02 – EXISTING CONDITIONS
02 82 11 Traditional Asbestos Abatement
02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21
07 22 00 Roof and Deck Insulation 01-21
07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-21
07 31 13 Asphalt Shingles 02-21
07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified
Bituminous Membrane Roofing
12-21
07 60 00 Flashing and Sheet Metal 01-21
07 92 00 Joint Sealants 04-22
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 06 00 Schedule for Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
09 65 19 Resilient Tile Flooring 05-18
09 91 00 Painting 01-21
-- 2 of 543 --
11-01-23
00 01 10-2
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 10 – SPECIALTIES
10 26 00 Wall and Door Protection 01-21
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23
23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND
EQUIPMENT
03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 09 23 Direct-Digital Control System for HVAC 03-23
23 21 13 Hydronic Piping
23 22 13 Steam and Condensate Heating Piping 08-23
23 31 00 HVAC Ducts and Casings 03-23
23 37 00 Air Outlets and Inlets 03-23
23 82 00 Convection Heating and Cooling Units
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 09 23 Lighting Controls 11-22
26 51 00 Interior Lighting 11-22
-- 3 of 543 --
Modernize Campus Corridors
Togus VAMC
402-23-794
GENERAL REQUIREMENTS
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control
requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and
removal of existing structures, and furnish labor and materials and perform work for
replacement of flooring, roofing, interior finishes and improvements to the HVAC for the campus
corridors at the Togus VA Medical Center _________________________
_______________________________________________________________ as required by
drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center
Engineering Officer..
C. Offices of ___Above Group, Inc.
______________________________________________________, as Architect-Engineers,
will render certain technical services during construction. Such services shall be considered as
advisory to the Government and shall not be construed as expressing or implying a contractual
act of the Government without affirmations by Contracting Officer or his duly authorized
representative.
D. General Contractor responsible for developing construction phasing plans and Interim Life
Safety Plans in accordance with VA requirements. All plans must be approved by the COR prior
to construction commencing. General Contractor to ensure at least 2 means of egress from
each building during construction.
E. Before placement and installation of work subject to tests by testing laboratory retained by
Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable
testing laboratory personnel to be present at the site in time for proper taking and testing of
specimens and field inspection. Such prior notice shall be not less than three workdays unless
otherwise designated by the COR.
F. All employees of general contractor and subcontractors shall comply with VA security
management program and obtain permission of the VA police, be identified by project and
employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID Work includes general construction,
alterations, necessary removal of existing structures and construction and certain other items.
B. ALTERNATE NO.1: BASE BID except delete__roof replacement from
scope______________________________
C. ALTERNATE NO.2: BASE BID except delete __replacement of radiators from scope.
Contractor responsible for removing the radiator for replacement of finishes and reinstall
existing radiator. Contractor responsible for ensuring prior to removal that the radiator is
operational and upon reinstallion the radiator to function as it did prior to removal. Contractor to
clean interior and exterior of radiator prior to reinstallation. ___________________________
1.4 SPECIFICATI…
Source: SAM.gov, as posted. Verify the current solicitation before responding.