AAS One Year Building Maintenance

STATE, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
19RS5026Q0002
NAICS
561790
PSC
Z1AZ
Set-aside
No Set aside used
Posted
July 17, 2026
Response due
July 20, 2026
Place of performance
MOSCOW, RU-MOW

What this opportunity is

The Department of State is seeking a contractor to perform one year of building maintenance services for a vacant facility in Moscow, Russia, under NAICS 561790. This opportunity is open to all businesses, as there is no set-aside. The contractor will be responsible for essential property preservation tasks, including fire protection systems maintenance, climate control monitoring, security services, and general housekeeping. Interested parties should note that this is a solicitation notice, indicating the need to track the opportunity closely for bidding details.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

STATEMENT OF WORK Background/Scope of Services: The Contractor shall perform essential property preservation services at the vacant American School Facility, Beregovaya Street, Building No. 1, Moscow, Russian Federation. The facility is currently unoccupied and requires minimal maintenance to preserve critical systems and ensure property security. The Contractor shall furnish all labor, materials, equipment, and services required under this contract within the time specified herein. 1. GENERAL The Contractor shall: • Provide all labor and tools to conduct work in each respective trade • Perform the tasks below with qualified technicians within the selected trade • Provide liability insurance for their employees • Maintain 24/7 emergency response capability 2. DESCRIPTION OF SERVICES The Contractor shall provide all labor, materials, and tools to perform the following essential services for the vacant facility: A. Fire Protection Systems Maintenance • Fire alarm system monitoring, inspection, and maintenance • Fire sprinkler system monitoring, inspection, and maintenance B. Climate Control for Fire System Protection • Heating system operation and monitoring to maintain minimum temperatures necessary to prevent freezing of fire suppression systems • Temperature monitoring throughout the facility -- 1 of 13 -- C. Water System Freeze Prevention • Domestic water system operation and monitoring to prevent freezing of all water pipes and plumbing D. Security and Surveillance Services • Physical security patrols and monitoring to prevent unauthorized access, vandalism, and ensure general property safety • Surveillance system operation and monitoring E. Worker Bathroom Facilities • Maintenance and daily cleaning of three designated bathrooms for contractor worker use F. Grounds Maintenance • Lawn mowing and vegetation control to maintain property appearance G. General Housekeeping • Periodic interior cleaning to prevent deterioration and maintain basic property standards H. Waste Management and Dumpster Services • Trash removal and disposal services for building operations, landscape debris, and materials from building operations I. Emergency Response J. Utilities Management K. Utility Billing Coordination and Payment Processing L. Basic Property Preservation 3. SPECIFIC TASKS 3.1 Fire Alarm System Maintenance and Monitoring The Contractor shall: -- 2 of 13 -- • Monitor fire alarm system continuously • Test fire alarm system a minimum of four times per year • Inspect fire alarm system quarterly by a licensed contractor • Check equipment including pull stations, alarm bells or buzzers, and strobe light indicators • Inspect and clean smoke and heat detectors within the building and ductwork to prevent false alarms • Ensure control panels are accessible and functional • Respond to all fire alarm activations within 30 minutes • Maintain all required documentation and inspection records • Ensure compliance with local fire safety regulations 3.2 Fire Sprinkler System Maintenance and Monitoring The Contractor shall: • The contractor is responsible for providing regular maintenance and repair of the fire sprinkler system — including, but not limited to, sprinkler heads, pipes, the central pump, and valves — to ensure complete fire protection of the buildings. • All materials, tools, and labor shall be the responsibility of the contractor. • Inspect fire sprinkler system quarterly • Service fire sprinkler system annually by a licensed contractor • Monitor system pressure and functionality • Inspect all sprinkler heads, valves, and piping for damage or leaks • Ensure system remains operational and unfrozen • Maintain all required documentation and inspection records • Respond to system malfunctions within 2 hours 3.3 Climate Control and Freeze Prevention -- 3 of 13 -- The Contractor shall: • Operate heating systems to maintain minimum temperature of 50°F (10°C) throughout the facility to prevent freezing of fire suppression systems and plumbing • The contractor is responsible for maintaining and repairing the central gas boilers and associated air distribution systems to ensure freeze protection of the buildings. This responsibility includes, but is not limited to, all tools, materials, and labor required to perform the work. • Monitor temperature in all areas of the building, particularly where fire suppression systems and water pipes are located • Install and monitor temperature sensors in critical areas • Respond immediately to heating system failures or temperature drops below safe levels • Perform monthly inspections of heating equipment • Maintain heating system in operational condition, including boilers, thermostats, and controls • Ensure adequate fuel supply for heating systems • Document daily temperature readings • Provide emergency heating response 24/7 3.4 Water System Freeze Prevention and Maintenance The Contractor shall: • Maintain domestic water system operation to prevent freezing of all water pipes throughout the facility • Monitor water pressure and flow in the system • Maintain minimum water temperature in pipes to prevent freezing • Drain and winterize any non-essential water lines if necessary to prevent freeze damage -- 4 of 13 -- • Inspect all exposed piping, valves, and fixtures monthly for leaks or damage • Insulate exposed pipes in vulnerable areas as needed • Respond to water system failures or leaks within 2 hours • Document daily water system status • Maintain hot water system operation at minimum levels necessary for freeze prevention • Ensure all plumbing fixtures remain functional and unfrozen • Provide emergency plumbing response 24/7 for freeze-related issues or major leaks • The contractor is responsible for removing roof snow and clearing emergency access routes for fire trucks and municipal emergency vehicles a maximum of twice per winter season. When snow removal needs exceed the contracted scope, the contractor shall notify the USG to engage a third-party se

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 561790)