Snow Removal and Grass Cutting Service, Misawa Air Base, Japan
DEPT OF DEFENSE
Notice type
Presolicitation
Solicitation #
FA520526Q0027
NAICS
561790
PSC
S218
Posted
July 20, 2026
Response due
July 28, 2026
Place of performance
Misawa-city, JP-02
Description
1
PERFORMANCE-BASED
WORK STATEMENT (PWS)
FOR
SNOW REMOVAL
AND
GRASS CUTTING SERVICES,
MISAWA AB, JAPAN
35 CES/CEOES
`MISAWA AIR BASE, JAPAN
Date: 15 March 2026
-- 1 of 13 --
2
TABLE OF CONTENTS
Paragraph Title Page
1. DESCRIPTION OF SERVICES 3
1.1. Snow/Ice Removal Service 3
1.2. Grass Cutting Service 4
1.3. Remove Debris/Police Grounds 5
1.4. On-Call Service 5
1.5. Occupancy of Facilities 6
2. GENERAL INFORMATION 6
2.1. Hours of Operation and Service-Required Period 6
2.2. Correction of Damage 7
2.3. Contractor Personnel 8
2.4. Government Remedies 8
2.5. Special Security Requirements 8
2.6. Random Antiterrorism Measures 8
2.7. Reporting Suspicious Activity 9
2.8. Performance of Services During Crisis Declared by the National 9
Command Authority or Overseas Combatant Commander
2.9. Antiterrorism Awareness Training for Contractors (252.204-7004, Jan
2023) 9
2.10. Base Passes 10
2.11. Contractor Equipment 10
2.12. Misawa Air Base Fire Prevention 10
2.13. Safety Requirements 11
2.14. Contractor Furnished Items 12
3. SERVICES SUMMARY 12
4. GOVERNMENT-FURNISHED PROPERTY AND SERVICES 13
5. APPENDICES 13
A. Estimated Workload Data 13
B. Area Maps 13
-- 2 of 13 --
3
1. DESCRIPTION OF SERVICES.
Non-personal service. The contractor shall provide all personnel, equipment, tools, supervision,
and other items and services necessary to ensure that snow/ice removal and grass cutting services
are performed in the areas shown in Appendix B, Area Maps, details of building number and user
and square meters are established in Appendix A, Estimated Workload Data on Misawa Air Base,
Japan in a manner that will ensure a safe environment, promote the growth of healthy grass and
present a clean, neat, and professional appearance. The contractor shall accomplish all tasks based
on the Performance-based Work Statement (PWS) and the Services Summary (SS), and not the
frequency or method of performance. It is at the contractor’s discretion to determine the levels of
frequencies to attain the level of service at the best value. The contractor shall comply with all
applicable federal, regional, and local laws, regulations, instructions, and commercial standards.
1.1. SNOW/ICE REMOVAL SERVICE.
1.1.1. Snow Removal. The contractor shall remove snow from all paved areas, sidewalks, steps,
stairs, landings, entrance ramps, entrances, balconies, porches, parking lots, handicap ramps,
around bollards, and all other areas shown in Appendix B.
1.1.1.1. The contractor shall remove snow that has been piled by heavy equipment or has fallen
from the roofs of buildings in their areas of responsibility shown in Appendix B.
1.1.1.2. The contractor shall remove snow from around all doors and gates completely or partially
within their areas of responsibility as shown in Appendix B to ensure doors and gates can fully be
opened and closed without any impediments.
1.1.1.3. The contractor shall ensure that snow piled from snow removal operations do not create
unsafe conditions for base personnel or cause damage to government and base personnel property.
Examples include, but are not limited to, snow piles that cover or obstruct traffic, roads, sidewalks,
bus stops, fire hydrants, and stand pipes.
1.1.1.4. When snowfall is heavy or accumulations become excessive, the contractor shall place
excess snow in approved snow dumping location on Misawa Air Base area as directed by the
Contracting Officer (CO) or Contracting Officer’s Representative (COR). The contractor shall
remove at least a snow pile on a weekly basis and only at specified buildings identified in Appendix
A, Estimated Workload Data.
1.1.1.5. When contractor's removal operations result in snow pile accumulation that is unsafe for
residents or obstructs vehicular traffic, reaching a height of 2 meters or 24 cubic meters, the
contractor shall remove the excess snow piles from the areas identified in Appendix A to an
approved snow dumping location on Misawa Air Base.
1.1.2. Ice Removal. The contractor shall remove ice from sidewalks, steps, stairs, landings,
entrance ramps, entrances, balconies, porches, parking lots, handicap ramps, around bollards, and
all other areas as shown in Appendix B to ensure secure footing, safe driving conditions, and safe
access for emergency vehicles.
-- 3 of 13 --
4
1.1.2.1. Ice removal shall be performed as needed regardless of the building/area priority.
1.1.2.2. The contractor shall not use de-icing material within five (5) feet of the bollards in order
to prevent chemical deterioration or damage of the bollards. If accidental application occurs to the
bollards, then the contractor shall remove all chemical residues at no additional cost to the
Government.
1.1.3. Initial Completion Timeframes of Snow and Ice Removal. The contractor shall complete
the initial snow/ice removal for the designated area groups within the timeframes specified below.
If snowfall continues after the initial removal is complete, the contractor shall then proceed with
services as required in para.
Group Areas of Snow/Ice Removal Hours of
Completion
A DoDEA Areas – Appendix A5 0630
B Base Facilities – Appendix A3, A4, A6, A7, A8
(Other Than DoDEA) 0700
C Base Facilities – Appendix A3, A8
(Other Than DoDEA) 0730
D MFH Areas – Appendix A1 0800
1.1.4. Response and Measures for Continuous Snowfall Removal. Continuing snowfall after
contractor’s initial snow and ice removal to routine snow/ice removal areas shall be removed
whenever accumulation exceeds the threshold. Following the initial snow removal, the contractor
shall remove any new snow accumulation from routine removal areas under the following group
as shown para.1.1.3:
Group Snow Accumulation Threshold
A&B When accumulation exceeds one (1) inch, or within one (1) hour after snowfall
stops, whichever comes first.
C&D When accumulation reaches three (3) inches, or within two (2) hours after
snowfall stops, whichever comes first.
1.1.5. Base Delays/Base Clo…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 561790)
Grey Towers PA - Gutter Cleaning & Repair
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 30, 2026
Stockbridge Snow and Ice Removal
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 13, 2026
Internal Fence Reconfiguration Services
DEPT OF DEFENSE · Sources Sought · due July 29, 2026
Amendment 0003: Specialty Cleaning BPA - Dover AFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 24, 2026
Kitchen Hoods and Ducts Cleaning
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 22, 2026
AAS One Year Building Maintenance
STATE, DEPARTMENT OF · Solicitation · due July 20, 2026