What this opportunity is
The Department of Defense is seeking internal fence reconfiguration services at Fort Bragg, NC, through a Sources Sought notice aimed at gathering information from potential contractors. This opportunity is open to all business types as there is no set-aside, making it suitable for both small and large businesses. Interested contractors should note that this is not a solicitation for bids but a request for information to assess market capabilities, and they must be registered in the System for Award Management to respond.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1 | P a g e
Statement of Work (SOW)
Fence Reconfiguration for Expansion of SPEAR Main Issue Facility and Removal of Yellow Safey Poles and
Security of SPEAR Clothing and Individual Equipment (SCIE)
Location: Old 3rd Group SSA, Fort Bragg, NC
1. General: This is a non-personal services contract under which the contractor shall provide all management,
supervision, and labor necessary to perform the tasks outlined in this Statement of Work (SOW). The personnel
rendering these services are not subject, either by the contract’s terms or by the manner of its administration, to the
supervision or control of Government employees. The contractor shall be responsible for supervising its own
employees and ensuring all work meets the technical standards specified herein.
1.1 Description of Services/Introduction
The contractor shall reconfigure the existing internal security fence line and remove designated yellow safety poles
within Building H-2639 (formerly the 3rd Group SSA) at Fort Bragg, NC. This project will expand the operational
square footage of the SPEAR Main Issue Facility while maintaining physical security controls for SPEAR Clothing
and Individual Equipment (SCIE).
2. Background
The current internal layout of Building H-2639 (formerly the 3rd Group SSA) at Fort Bragg, NC, restricts the
functional workspace available for the SPEAR Main Issue Facility. Because SPEAR Clothing and Individual
Equipment (SCIE) consists of highly pilferable, high-value assets, the facility requires strict physical security,
segregation, and controlled access. Reconfiguring the internal fencing directly addresses these spatial and security
constraints by supporting the following core operational objectives:
• Expansion of the primary SPEAR issue area
• Improved workflow for receiving, issuing, and storing SCIE
• Compliance with physical security standards
• Reduction in pilferage risk and unauthorized access
• Support SPEAR program operational efficiency and accountability requirements
3. Scope of Work
The contractor shall provide all management, supervision, labor, tools, equipment, and materials necessary to
reconfigure the existing internal security fence system and remove designated yellow safety poles within Building
H-2639 (formerly the 3rd Group SSA) at Fort Bragg, NC. The contractor shall maximize the reuse of existing
government-owned fencing components to expand the operational footprint of the SPEAR Main Issue Facility while
maintaining physical security controls for SPEAR Clothing and Individual Equipment (SCIE).
3.1 Detailed Tasks
-- 1 of 6 --
2 | P a g e
Task Number & Title Work Requirements Expected End-State / Deliverable
Task 1: Site Verification
& Layout Plan
• Conduct an on-site physical inspection to verify building dimensions,
existing fence lines, and egress routes.• Draft a basic layout drawing
showing the proposed routing, door/gate placements, and dimensions.
Draft Layout Plan (submitted to the
COR for approval prior to
commencing work).
Task 2: Yellow Safety
Pole Removal
• Demolish and safely remove the designated yellow safety poles from the
facility floor.• Repair, patch, and grind flush any anchor holes or floor
damage resulting from the pole removal.
Clean, hazard-free floor space ready
for the expanded layout.
Task 3: Fence
Disassembly & Prep
• Carefully disassemble and inventory the existing fence panels, gates, and
hardware slated for reconfiguration.• Prep the concrete floor, walls, and
ceiling structures to receive the reconfigured fence line.
Disassembled assets organized;
installation paths prepped.
Task 4: Fence
Reconfiguration &
Reinstallation
• Reinstall and secure the fencing panels to create a continuous, floor-to-
ceiling anti-pilferage enclosure.• Anchor all posts and frames securely to
the floor and structural ceiling components.• Reinstall and adjust gates
(swing or sliding) to ensure smooth, durable operation and secure latching.
Fully enclosed, structural-grade
security perimeter around the SCIE
storage area.
Task 5: Cleanup & Final
Inspection
• Remove all project debris, tools, and excess materials from the facility
daily.• Conduct a joint physical walkthrough with the COR to verify the
security and alignment of the fence system.
Clean, operational facility; Joint
Walkthrough Inspection completed.
4. Deliverables
The contractor shall submit all deliverables to the designated Contracting Officer's Representative (COR) or
Government Lead at Fort Bragg, NC, in accordance with the schedule below.
Deliverable Number & Title Format / Medium Due Date / Timeline
01: Proposed Layout Sketch Electronic (PDF) Within five (5) business days after Notice to Proceed (NTP); must be
approved by the COR prior to installation.
02: Completed Fence
Reconfiguration
Physical Installation Conformance with the approved layout plan within the designated
Period of Performance.
03: Final Handover Documentation Electronic (PDF) or
Physical
Within ten (10) business days of project completion. Includes final
layout dimensions, component inventory, and any manufacturer
warranty details.
04: Final Acceptance Sign-off Signed Document Completed jointly during the final government walkthrough inspection.
5. Performance Requirements
The contractor shall ensure that all reconfigured fence installations, hardware, and safety pole removals conform to
the following specific structural and quality standards at Fort Bragg, NC:
-- 2 of 6 --
3 | P a g e
Area of Performance Required Technical Standard / Specification
Structural Integrity • The reconfigured fence system must be floor-to-ceiling, anchored securely to the concrete floor and structural
ceiling elements.• All framing and mesh must be tight, aligned, and free of gaps that would compromise security.
Access Control • All gates (sliding or swing) must support controlled entry and be equipped with heavy-duty, tamper-resistant
latching mechanisms capable of accepting government-furnished locks.
Material Reuse &
Quality
• Reused gov…