What this opportunity is
The Department of Defense is soliciting bids for the addition of non-potable water distribution lines to irrigation areas, with a project magnitude between $500,000 and $1,000,000. This opportunity is open to all businesses, as there is no set-aside for small businesses. The performance period is 570 days, and bidders must comply with specific requirements outlined in the solicitation, including adherence to Spanish law for execution of government works. Interested contractors should note the pre-proposal conference on June 12, 2026, and ensure bids are submitted by June 29, 2026.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
WZK:d^/'E
Yhh'ϭϵͲϭϬϬϬ͕EKEͲWKd>tdZ
/^d>/E^dK/ZZ/'d/KEZ^͕Dh>d/
dDKZME/Z^͕^W/E
^W/&/d/KE^
WƌĞƉĂƌĞĚďLJ͗ ĂLJĞƚĂŶŽ'ſŵĞnj,ĞƌƌĞƌŽ
/ŶŐĞŶŝĞƌŽ/ŶĚƵƐƚƌŝĂůʹŽůĞŐŝĂĚŽEǑϰϳϴϰ
ŽůĞŐŝŽKĨŝĐŝĂůĚĞ/ŶŐĞŶŝĞƌŽƐ/ŶĚƵƐƚƌŝĂůĞƐĚĞŶĚĂůƵĐşĂKĐĐŝĚĞŶƚĂů
ZĞǀŝĞǁĞĚďLJ͗ _________________________________________________________________
ƉƉƌŽǀĞĚďLJ͗ _________________________________________________________________
&ĞďƌƵĂƌLJϮϬϮϲ
-- 1 of 136 --
THISPAGEHASBEENINTENTIONALLYLEFTBLANK
-- 2 of 136 --
LIST OF SPECIFICATIONS
DIVISION 01 GENERAL REQUIREMENTS
01 11 00 SCOPE OF WORK AND DRAWINGS 01
01 11 01 GENERAL CONDITIONS 11
01 11 02 SPECIAL CONDITIONS 45
DIVISION 02 EXISTING CONDITIONS
02 41 00 DEMOLITION 49
DIVISION 03 CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE 55
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 92 00 JOINT SEALANTS 69
DIVISION 09 FINISHES
09 90 00 PAINT AND COATING 73
DIVISION 31 EARTHWORK
31 00 00 EARTHWORK 85
31 05 19 GEOTEXTILE 105
DIVISION 32 EXTERIOR IMPROVEMENTS
32 92 19 SEEDING 109
DIVISION 33 UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING 117
-- 3 of 136 --
THISPAGEHASBEENINTENTIONALLYLEFTBLANK
-- 4 of 136 --
QUUG 19-1000
01 11 00
Page 1
SECTION 01 11 00
SCOPE OF WORK AND DRAWINGS
SCOPE OF WORK: This project provides for work to complete a design for the expansion of
the non-potable water distribution system to cover irrigation areas and provisions for the
future connection of buildings to the non-potable water distribution system at Morón Air Base.
The construction works consist of, but are not limited to, the items indicated below, including
the testing to be performed by independent laboratories for quality control:
1. Site investigation
The Contractor shall be verifying existing utility locations, within the area of work. Scan
the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic
equipment, and mark the surface of the ground or paved surface where existing
underground utilities are located. Verify the elevations of existing piping, utilities, and
any type of underground obstruction discovered during scanning, in locations to be
traversed by piping and other work to be conducted or installed. Verify elevations before
installing new utilities close to manholes or other adjacent structures.
2. CLIN´S
CLIN #1: BASE BID: AREA #1 (BRANCH LINE Nº18) + INSTALLATIONS OF
PROGRAMMERS IN EXISTING SPRINKLER IRRIGATION SYSTEM +
MODIFICATION OF NON-POTABLE WATER SYSTEM AT POTABLE WATER
TREATMENT FACILITY
1.1 Civil works:
1. Excavations and fill for trenches utilities routing.
2. Fill vegetation area
1.2 Mechanical Works
1.2.1 Modification of non-potable water system at potable water treatment facility
1. Provide all piping and valves as indicated in the drawings for non potable
water system.
1.2.2 Installations of programmers in existing sprinkler irrigation system
1. Provide all piping and valves as indicated in the drawings for non potable
water system.
-- 5 of 136 --
QUUG 19-1000
01 11 00
Page 2
2.Provide hose bibb, hose connection vacuum breaker 3/4", water meter,
pressure gauge, solenoid valve, programmer with solar panel as indicated in the
drawings including cabinet.
1.2.3 Irrigation System area #1 branch line nº18
1. Provide hose bibbs with water meter, pressure gauge as indicated in the
drawings including cabinet.
2. Provide all piping and valves as indicated in the drawings for non potable
water system.
CLIN #2: OPTION #1: AREA #2 (BRANCH LINES 08, 09, 11, 12 (building #302)
and Running Track
1.1 Civil works:
1.Excavations and fill for trenches utilities routing.
2. Fill vegetation area
1.2 Mechanical Works
1.2.1 Irrigation System area #2 branch line nº 08, 09, 11, 12 (building #302) and running
track
1. Provide all piping and valves as indicated in the drawings for non potable
water system.
2. Provide hose bibbs with water meter, pressure gauge as indicated in the
drawings including cabinet.
3. Provide handhole connections for buildings.
CLIN #3: OPTION#2: AREA #3 (BRANCH LINES 06 AND 07)
1.1 Civil works:
1.Excavations and fill for trenches utilities routing.
2. Fill vegetation area
1.2 Mechanical Works
1.2.1 Irrigation System area #3 branch line nº 06 and 07
1. Provide all piping and valves as indicated in the drawings for non potable
water system.
2. Provide hose bibbs with water meter, pressure gauge as indicated in the
drawings including cabinet.
-- 6 of 136 --
QUUG 19-1000
01 11 00
Page 3
CLIN #4: OPTION #3: AREA #4 (BRANCH LINES 05, 15, 15.1 AND 17. Building
#208DQG#202 )
1.1 Civil works:
1.Excavations and fill for trenches utilities routing.
2. Fill vegetation area
1.2 Mechanical Works
1.2.1 Irrigation System area #4 branch line nº 05, 15, 15.1 and 17. Building #208 DQG
#202
1. Provide all piping and valves as indicated in the drawings for non potable water
system.
2. Provide hose bibbs with water meter, pressure gauge as indicated in the drawings
including cabinet.
3. Provide handholes connections for buildings.
CLIN #5: OPTION #4: AREA #5 (BRANCH LINES 01, 02, 03, 04, 16 and 19)
1.1 Civil works:
1.Excavations and fill for trenches utilities routing.
2. Fill vegetation area
1.2 Mechanical Works
1.2.1 Irrigation System area #5 branch line nº 01, 02, 03, 04, 16 and 19
1. Provide all piping and valves as indicated in the drawings for non potable water
system.
2. Provide hose bibbs with water meter, pressure gauge as indicated in the drawings
including cabinet.
-- 7 of 136 --
QUUG 19-1000
01 11 00
Page 4
CLIN #6: OPTION #5: UPGRADES
1. Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling
of trench 30m
2. Polyethylene pipe HDPE PN10 DN160, connection fittings, excavation and filling of
trench 40m
3. Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of
trench 40m
4. Polyethyle…
Source: SAM.gov, as posted. Verify the current solicitation before responding.