B836 Replace Electrical in Airfield Lighting Vault
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
FA302226R0021
NAICS
238210
PSC
N059
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 16, 2026
Response due
September 8, 2026
Place of performance
Columbus, MS
What this opportunity is
The Department of Defense is soliciting a total small business set-aside contract for the design-build replacement of electrical components in an airfield lighting vault at Columbus Air Force Base in Mississippi. The project, designated as EEPZ247359, falls under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors) and PSC code N059. Small businesses should track this solicitation, as it is a formal notice type, and be prepared to submit a bid if they meet the requirements outlined in the solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
DESIGN-BUILD STATEMENT OF WORK
PROJECT NUMBER: EEPZ247359
Replace Electrical in Airfield Lighting Vault, B836
COLUMBUS AFB, MISSISSIPPI
30 May 2026
-- 1 of 39 --
COLUMBUS AFB, MS PROJECT NUMBER: EEPZ247359
Replace Electrical in Airfield Lighting Vault, B836
PAGE 2 of 39
TABLE OF CONTENTS
NOMENCLATURE ........................................................................................................................ 4
1.1 ACRONYMS & ABBREVIATIONS................................................................................................ 4
1.2 BASIC TERMS ................................................................................................................................. 5
DESCRIPTION OF PROJECT ....................................................................................................... 6
2.1 SUMMARY (EXAMPLE BELOW) ................................................................................................. 6
2.2 BACKGROUND ............................................................................................................................... 6
2.3 SCOPE OF PROJECT ....................................................................................................................... 6
2.4 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS (DETAILS NOT ALWAYS
NECESSARY, IF NOT, SAY THE GOVERNMENT WILL NOT FURNISH ANYTHING FOR THIS
PROJECT; THIS IS AN EXAMPLE BELOW) ............................................... Error! Bookmark not defined.
2.5 SALVAGE (DETAILS NOT ALWAYS NECESSARY, IF NOT, SAY THE GOVERNMENT WILL
NOT SALVAGE ANYTHING FROM THIS PROJECT; THIS IS AN EXAMPLE BELOW)Error! Bookmark
not defined.
DESIGN REQUIREMENTS ........................................................................................................... 8
3.1 SUMMARY....................................................................................................................................... 8
3.2 NATURE/EXTENT OF DESIGN (CHANGE THIS FOR PROJECT SPECIFICS, EXAMPLE
BELOW) 8
3.3 RESPONSIBILITY ........................................................................................................................... 8
3.4 DESIGN STANDARDS (ADD ANY OTHER RELEVANT UFCs, CODES, AND STANDARDS)8
3.5 DRAWINGS ...................................................................................................................................... 9
3.6 DESIGN SUBMITTALS (CHECK DAYS IN RED IN SECTION 3.6.2) .......................................10
3.7 DESIGN REVIEWS .........................................................................................................................11
3.8 CONFERENCES ..............................................................................................................................12
ADMINISTRATION OF CONSTRUCTION ................................................................................13
4.1 PERFORMANCE CAPABILITIES (VERIFY RED TEXT IN THIS SECTION ON EACH PROJECT)
13
4.2 COMMENCEMENT, PROSECUTION & COMPLETION (PERIOD OF PERFORMANCE IN 4.2.3)
14
4.3 SCHEDULING .................................................................................................................................15
4.4 MANAGING ....................................................................................................................................17
4.5 MATERIAL SUBMITTALS AND SHOP DRAWINGS .................................................................17
4.6 WORK BY GOVERNMENT ...........................................................................................................19
4.7 PRE-FINAL AND FINAL INSPECTION .......................................................................................19
4.8 WARRANTY ...................................................................................................................................20
4.9 CONTRACTOR OFFICE.................................................................................................................21
4.10 CONSTRUCTION SITES ................................................................................................................22
4.11 CONSTRUCTION EQUIPMENT....................................................................................................24
-- 2 of 39 --
COLUMBUS AFB, MS PROJECT NUMBER: EEPZ247359
Replace Electrical in Airfield Lighting Vault, B836
PAGE 3 of 39
4.12 AVAILABILITY OF UTILITY SERVICES AT JOB SITES..........................................................24
4.13 TEMPORARY UTILITIES ..............................................................................................................24
4.14 CONSTRUCTION SECURITY .......................................................................................................25
QUALITY REQUIREMENTS .......................................................................................................27
5.1 QUALITY CONTROL PLAN .........................................................................................................27
5.2 TESTING AND INSPECTION SERVICES ....................................................................................28
5.3 MANUFACTURERS' FIELD SERVICES ......................................................................................29
5.4 PRODUCT REQUIREMENTS ........................................................................................................29
5.5 CLOSEOUT PROCEDURES...........................................................................................................30
SAFETY, HEALTH AND ENVIRONMENTAL PROTECTION ................................................32
6.1 SAFETY AND HEALTH .................................................................................................................32
6.2 GENERAL........................................................................................................................................32
6.3 HAZARDOUS MATERIAL ..…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.