B836 Replace Electrical in Airfield Lighting Vault

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA302226R0021
NAICS
238210
PSC
N059
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 16, 2026
Response due
September 8, 2026
Place of performance
Columbus, MS

What this opportunity is

The Department of Defense is soliciting a total small business set-aside contract for the design-build replacement of electrical components in an airfield lighting vault at Columbus Air Force Base in Mississippi. The project, designated as EEPZ247359, falls under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors) and PSC code N059. Small businesses should track this solicitation, as it is a formal notice type, and be prepared to submit a bid if they meet the requirements outlined in the solicitation.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

DESIGN-BUILD STATEMENT OF WORK PROJECT NUMBER: EEPZ247359 Replace Electrical in Airfield Lighting Vault, B836 COLUMBUS AFB, MISSISSIPPI 30 May 2026 -- 1 of 39 -- COLUMBUS AFB, MS PROJECT NUMBER: EEPZ247359 Replace Electrical in Airfield Lighting Vault, B836 PAGE 2 of 39 TABLE OF CONTENTS NOMENCLATURE ........................................................................................................................ 4 1.1 ACRONYMS & ABBREVIATIONS................................................................................................ 4 1.2 BASIC TERMS ................................................................................................................................. 5 DESCRIPTION OF PROJECT ....................................................................................................... 6 2.1 SUMMARY (EXAMPLE BELOW) ................................................................................................. 6 2.2 BACKGROUND ............................................................................................................................... 6 2.3 SCOPE OF PROJECT ....................................................................................................................... 6 2.4 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS (DETAILS NOT ALWAYS NECESSARY, IF NOT, SAY THE GOVERNMENT WILL NOT FURNISH ANYTHING FOR THIS PROJECT; THIS IS AN EXAMPLE BELOW) ............................................... Error! Bookmark not defined. 2.5 SALVAGE (DETAILS NOT ALWAYS NECESSARY, IF NOT, SAY THE GOVERNMENT WILL NOT SALVAGE ANYTHING FROM THIS PROJECT; THIS IS AN EXAMPLE BELOW)Error! Bookmark not defined. DESIGN REQUIREMENTS ........................................................................................................... 8 3.1 SUMMARY....................................................................................................................................... 8 3.2 NATURE/EXTENT OF DESIGN (CHANGE THIS FOR PROJECT SPECIFICS, EXAMPLE BELOW) 8 3.3 RESPONSIBILITY ........................................................................................................................... 8 3.4 DESIGN STANDARDS (ADD ANY OTHER RELEVANT UFCs, CODES, AND STANDARDS)8 3.5 DRAWINGS ...................................................................................................................................... 9 3.6 DESIGN SUBMITTALS (CHECK DAYS IN RED IN SECTION 3.6.2) .......................................10 3.7 DESIGN REVIEWS .........................................................................................................................11 3.8 CONFERENCES ..............................................................................................................................12 ADMINISTRATION OF CONSTRUCTION ................................................................................13 4.1 PERFORMANCE CAPABILITIES (VERIFY RED TEXT IN THIS SECTION ON EACH PROJECT) 13 4.2 COMMENCEMENT, PROSECUTION & COMPLETION (PERIOD OF PERFORMANCE IN 4.2.3) 14 4.3 SCHEDULING .................................................................................................................................15 4.4 MANAGING ....................................................................................................................................17 4.5 MATERIAL SUBMITTALS AND SHOP DRAWINGS .................................................................17 4.6 WORK BY GOVERNMENT ...........................................................................................................19 4.7 PRE-FINAL AND FINAL INSPECTION .......................................................................................19 4.8 WARRANTY ...................................................................................................................................20 4.9 CONTRACTOR OFFICE.................................................................................................................21 4.10 CONSTRUCTION SITES ................................................................................................................22 4.11 CONSTRUCTION EQUIPMENT....................................................................................................24 -- 2 of 39 -- COLUMBUS AFB, MS PROJECT NUMBER: EEPZ247359 Replace Electrical in Airfield Lighting Vault, B836 PAGE 3 of 39 4.12 AVAILABILITY OF UTILITY SERVICES AT JOB SITES..........................................................24 4.13 TEMPORARY UTILITIES ..............................................................................................................24 4.14 CONSTRUCTION SECURITY .......................................................................................................25 QUALITY REQUIREMENTS .......................................................................................................27 5.1 QUALITY CONTROL PLAN .........................................................................................................27 5.2 TESTING AND INSPECTION SERVICES ....................................................................................28 5.3 MANUFACTURERS' FIELD SERVICES ......................................................................................29 5.4 PRODUCT REQUIREMENTS ........................................................................................................29 5.5 CLOSEOUT PROCEDURES...........................................................................................................30 SAFETY, HEALTH AND ENVIRONMENTAL PROTECTION ................................................32 6.1 SAFETY AND HEALTH .................................................................................................................32 6.2 GENERAL........................................................................................................................................32 6.3 HAZARDOUS MATERIAL ..

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238210)