The Department of Defense is soliciting a Total Small Business Set-Aside contract for electrical work under NAICS code 238210, with a place of performance in Florida. The project involves repairing the existing electrical system, replacing exterior lighting, and updating electrical components to meet current code standards. This opportunity is suitable for small businesses with experience in electrical work, and bidders should track the Combined Synopsis/Solicitation notice to stay informed about the project's requirements and timeline.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Project Title:
1.0 Background
The existing electrical system has several components that are outdated, unsafe, or not up to
current code standards. The exterior lighting is inefficient and requires frequent maintenance.
This project is to repair the electrical system and replace the exterior lighting to improve safety,
reliability, and energy efficiency.
2.0 Scope of Work
The contractor shall provide all labor, materials, and equipment necessary to perform the
following tasks:
2.1 Main Electrical Panel Replacement
Demolish and remove the existing main electrical panel.
Install a new main electrical panel with all new circuit breakers.
Seal all wall penetrations to ensure a watertight seal around conduits.
2.2 Exterior Receptacle Replacement
Replace twelve (12) existing exterior wall receptacles with new 20-amp rated devices.
Connect the new receptacles to a new Ground Fault Circuit Interrupter (GFCI) breaker in
the main panel.
Remove any existing extension boxes on the exterior receptacles.
Install new receptacles and in-use (bubble) covers for all exterior receptacles.
2.3 Sub-Panel Breaker Refresh
Install fifteen (15) new circuit breakers in the existing load center sub-panel to refresh the
panel's integrity.
2.4 Exterior Lighting Replacement
Remove and dispose of six (6) existing exterior safety wall lights and their associated
wood mounting plates.
Install six (6) new LED wall pack lights.
Mount and seal the new light fixtures to the building to ensure a watertight installation.
3.0 Performance Requirements
All work shall be performed in a professional manner and in accordance with all
applicable national, state, and local codes and regulations.
All materials and equipment shall be new and of a quality that meets or exceeds industry
standards.
The contractor shall be responsible for all necessary permits and inspections.
The work area shall be kept clean and free of debris at all times.
4.0 Deliverables
Deliverable Due Date
Project Schedule To be worked out between test events scheduled for the building and site.
-- 1 of 2 --
Weekly Progress Reports Every Friday
Final Inspection Report Upon project completion
As-Built Drawings Within 10 days of project completion
5.0 Government-Furnished Equipment and Information (GFE/GFI)
The government will provide access to the work site and electrical rooms.
6.0 Place of Performance
The work will be performed at Eglin AFB, FL
.
7.0 Period of Performance
The period of performance for this contract is to be worked out between test events that are
scheduled for the building and site.
-- 2 of 2 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.