Baron Weather Radar Maintenance
DEPT OF DEFENSE
Notice type
Sources Sought
Solicitation #
PANMCC-26-P-0000-048596
NAICS
811210
PSC
J066
Posted
July 27, 2026
Response due
August 14, 2026
Place of performance
Fort Greely, AK
Description
PERFORMANCE WORK STATEMENT (PWS)
Arctic Regions Test Center (ARTC) Annual Weather Radar Maintenance, Calibration, and Performance Evaluation
04 JUN 2026
Part 1
General Information
1. General: This is a non-personal service contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S. Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform full operational maintenance procedures and calibration of the x-band weather radar located near Fort Greely, Alaska as defined in this Performance Work Statement (PWS), except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: The U.S. Army Arctic Regions Test Center (ARTC) owns a weather radar, which was engineered and installed by Baron Services. ARTC requires annual maintenance and calibration to be conducted in order to maintain reliable operation of the weather radar and reduce the mean time between failures. The X-band polar weather radar is utilized when needing to observe and track precipitation in the local area, which assists greatly with notifying of where the heavier precipitation is occurring and where it is tracking, allowing ARTC meteorologists to give short-term forecasts of what the precipitation is expected to do based on the latest trends. The national weather service nexrad weather radar near Fairbanks, Alaska ends up having the beam about 2 miles up over the area, which misses most of our snowfalls as they normally occur in the lower levels and are below the 2 miles above ground level. ARTC requires experienced engineers or designers to verify the weather radar is performing as it should be based on installed initial specifications and operational parameters.
1.3 Scope: The Contractor shall provide non-personal service(s). The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the annual inspection and servicing of the ARTC weather radar as defined in this Performance Work Statement (PWS) and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards in this PWS and associated contract documents.
A qualified engineer/technician shall perform all necessary work to perform a full operational performance evaluation of the x-band weather radar system at ARTC, which includes calibration checks and visual component checks. This also includes making repairs as needed and the removal or install of Government provided parts and components to sustain operation of the x-band weather radar system. These checks and procedures consist of but are not limited to:
Conduct calibration of the weather radar system
Power levels measured and calibrated from within the radome at the transmitter using a calibrated power-sense meter for all pulse-widths specified for operation
drive voltage adjusted for optimal operation of the transmitter and to meet power-sense levels required
Frequency checked for accuracy with a calibrated spectrum analyzer and to be centered at 9480 MHz as the nominal frequency
Noise level measurements for all pulse-widths specified for operation
Noise temperature measurements for all pulse-widths specified for operation
Receiver bias
Transmitter Power/Bias
Linearity for all pulse widths specified for operation
Clutter suppression
Magnetron Phase Noise
ZDR Bias
Initial System Differential Phase
Step Attenuator Linearization
Solar calibrations
Antenna offset calibration
Antenna gain calibration
Radar components
Baron Calibration Processor (BCP) system and its components to include the distributed control modules (DCMs), built-in test equipment (BITE), delay line, and connections/interfaces.
Vacuum/Dehydrator pump and its operation to include sustaining required pressure within the waveguides and subsequent checks for leaks
Transmitter system (transmitter, magnetron, stable local oscillator (STALO), receiver)
Microwave Assembly (low noise amplifiers (LNAs), TR limiters (receiver protectors), waveguides, harmonic filters, waveguide switch)
Components within the Antenna Mounted Electronics
Radar signal processor
Intermediate frequency digitizer
Step Attenuator
UPS system and its components
Antenna
Pedestal
Interfaces/connections like the roatry joints and fiber optics
Motors
Gearboxes
Encoders
Servo amps
DDSA
Slip ring
Radome
Maintenance of the weather radar system
Repair of components discovered with deficiencies during the checks and evaluation of the system
Replacement of deficient or failed components that are not field repairable as able to be provided by the Government
Operational performance evaluation of the weather radar system shall include:
Operational test of the radar utilizing specified configuration and scans by CRTC meteorological personnel
Verification of accuracy of data when possible using other observations as available
Verify operation continues for at least 2 hours if no errors or problems were noted during calibration and maintenance checks of the weather radar system
Verify elevation only scans are able to be completed without error or issue while conducting a specified volume scan during the at least …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 811210)
Oxford EBSD-EDS Service Maintenance Agreement
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 7, 2026
J065--TruDi Navigation System Service
VETERANS AFFAIRS, DEPARTMENT OF · Special Notice · due August 6, 2026
Notice of Intent to Single Source to Thermo Electron
COMMERCE, DEPARTMENT OF · Special Notice · due August 14, 2026
Stratasys Emerald Care Renewal
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION · Special Notice · due July 29, 2026
Allentown Caging Company Individual Ventilated Cage (IVC) rack service/repairs for 50 existing supporting caging equipment supply and exhaust blower motor units with advanced technological features
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due August 3, 2026
Inspection and Maintenance of Electric Gate Systems at Yokota Air Base, Japan
DEPT OF DEFENSE · Solicitation · due July 31, 2026