Base New Orleans Administration and Industrial Building Cleaning
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
70Z029QNEWO000347
NAICS
561790
PSC
S299
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 27, 2026
Response due
August 10, 2026
Place of performance
New Orleans, LA
Description
Performance Work Statement
Administration and Industrial Building Cleaning
Located at
U.S. Coast Guard
Base New Orleans on the NASA
Michoud Assembly Facility
1790 Saturn Blvd. New
Orleans, LA 70129
July 2026
United States Coast Guard Base New Orleans, LA
Facilities Engineering Department
New Orleans, LA 70129
CWO Mike Ackiss
Base NOLA Facilities Engineering
Base New Orleans, LA
-- 1 of 6 --
PART 1: GENERAL
1. INTENT: The intent of this project is to clean via pressure washing, soft washing, or any
other industry standard means the Administration Building and Industrial Building at U.S
Coast Guard Base New Orleans as outlined in this Performance Work Statement (PWS).
2. SCOPE OF WORK: Contractor shall furnish all labor, tools, materials, transportation,
equipment, supervision, and personnel to clean all vertical, exterior, surfaces of dirt,
biological growth, and natural buildup on the Administrative (approx. 60,000 sq. ft. surface
area) and Industrial (approx. 40,000 sq. ft.) Buildings at Base New Orleans. No repairs
outside of the Performance Work Statement are authorized without permission from the
contracting officer or their representative.
3. QUALIFICATIONS: Contractor shall provide personnel who have the qualifications,
knowledge and working experience on systems listed under Part 2 performance standards.
4. CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference
with the facility’s normal operations. Perform all on-site work between the hours of 8:00 AM
and 4:00 PM, Monday through Friday (federal holidays excluded), unless otherwise
approved by the Contracting Officer or Contracting officer’s representative.
5. GOVERNMENT FURNISHED MATERIALS: None
6. GOVERNMENT FACILITIES AND UTILITIES: Electrical power and water are available
within proximity. The Contractor will be permitted to utilize these utilities in performing the
work, provided that the existing systems are not overloaded. Telephone services will not be
available for use by the contractor. Building restroom facilities are available for use.
7. SAFETY: The Contractor is wholly responsible for work site safety. The Contractor shall
implement a safety program that protects the lives and health of personnel in the
construction area, prevents damage to property, and avoids work interruptions. To
accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal
lights, etc. as well as complying with and abiding by all federal safety regulations as
published by the Occupational Health and Safety Administration, 29 CFR 1910 (series), 29
CFR 1926 (series), State and Local safety laws, rules, and regulations. Any operation
defined as “Hot Work” as per OSHA/NFPA requires a permit to be issued. In the event of
Hot Work, the Contractor will notify the COR with dates and times Hot Work will be
performed. Contractor is to give at least 48 hours notification. This includes welding,
cutting, brazing, grinding or any work that could produce sparks or heat and may initiate a
fire.
8. ENVIRONMENTAL COMPLIANCE: Any waste generated because of the project shall
either be recycled or be disposed of IAW the Resource Conservation and Recovery Act
(RCRA). Any Hazardous Waste shall be manifested off site with Base New Orleans listed as
-- 2 of 6 --
the Generator and signatory. Any hazardous waste shall be analyzed, characterized, stored,
and disposed of IAW RCRA and all applicable federal, state (i.e., DOT) and local laws and
ordinances. All solid waste/trash shall be removed from site and not disposed of in onsite
dumpsters. Waste and recycling areas are reserved for RCF Tenants and shall not be used by
Contractors at any time. All work will be performed IAW the BASE New Orleans Spill
Prevention Control and Countermeasures Plan. All chemicals required for this project shall
be preapproved by the contract POC along with SDS’s. All solid waste shall be removed
from the RCF after each working day. All extra chemicals and products shall be removed
from the site upon work completion, as the Emergency Planning and Community Right-To-
Know Act requires Coast Guard maintains an inventory of all Hazardous Materials located at
the site. A laydown area as required and an Erosion and Sediment Control Plan, shall be
preapproved by the COR as needed. Nothing shall be discharged to a storm drain at any time
during the project. All storm drains within range of a potential discharge shall be
covered/sealed during installation and kept covered until the work has been completed and
the system has been deemed fully operational and compliant with all applicable CG
policies/plans/permits/laws/ordinances. All storm drains and waterways within range of a
potential discharge shall be covered/sealed or protected by silt fence. All storm drains and
waterways within range of a potential discharge shall be covered/sealed or protected by silt
fence. All cleaners and detergents used at this facility must be environmentally friendly and
receive approval from Base New Orleans Environmental Program prior to use.
9. SITE VISIT: All site visits should be scheduled with the Contracting Officers, Facilities
Engineer and/or their representative and are highly encouraged. Any personnel coming on
site without a TWIC, military, or prior approved ID, will need to provide first and last name
to representative at a minimum of (5) five business days prior to arrival, so a security badge
can be created to allow access on the base.
• Contracting Officers Representative (COR)
CWO Mike Ackiss
Email: carlton.m.ackiss@uscg.mil
10. MATERIALS:
a) The Contractor will furnish all materials, equipment, instruments, tools, safety
lines and harnesses, and other items necessary for accomplishment of these
services.
b) Materials shall be delivered to the jobsite in their original unopened packages,
clearly marked with the manufacturer’s name, brand name, and description of
contents. Storage shall be in accordance with manufacturer’s recommendations in
a clea…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 561790)
Internal Fence Reconfiguration Services
DEPT OF DEFENSE · Sources Sought · due July 30, 2026
Grey Towers PA - Gutter Cleaning & Repair
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 30, 2026
Internal Fence Reconfiguration Services
DEPT OF DEFENSE · Sources Sought · due July 29, 2026
Stockbridge Snow and Ice Removal
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 13, 2026
Amendment 0003: Specialty Cleaning BPA - Dover AFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 24, 2026
Snow Removal and Grass Cutting Service, Misawa Air Base, Japan
DEPT OF DEFENSE · Presolicitation · due July 28, 2026