BEQ M400 Area Paint-Flooring Repairs

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
N4008526R9054
NAICS
236220
PSC
Z2JZ
Set-aside
Small Business Set Aside - Total
Posted
August 4, 2026
Response due
August 13, 2026
Place of performance
Camp Lejeune, NC

Description

DISTRIBUTION: DoW COMMUNITY ONLY DATE: 6/24/26 PROJECT # 26M088CN CONTRACT # 26-0433 TITLE: BUILDING M430, M435, M446, M447, M448 PAINT AND FLOORING REPAIRS ATTACHMENTS: Paints-Coatings Specifications, Resilient Flooring Specs, Material Quantity Data Sheet, Finish Legend, Combined Division 01 Specifications, Contractor Environmental Guide, Building Floor Plans SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following: GENERAL DESCRIPTION The responsibility of the contractor is to prep, paint, and replace the flooring systems in the following buildings listed in the project area description according to the general requirements. All measurements are for reference only and are to be field verified by contractor. The point of contact for access to the building is listed below in the project area descriptions. DETAILED REQUIREMENTS AND SPECIFICATIONS 1.) Project Area Description a. Building M430 is a BEQ located on Company B Street at Camp Johnson, MCB Camp Lejeune. b. Building M435 is a BEQ located on Company B Street at Camp Johnson, MCB Camp Lejeune. c. Building M446 is a BEQ located on Company B Street at Camp Johnson, MCB Camp Lejeune. d. Building M447 is a BEQ located on Company B Street at Camp Johnson, MCB Camp Lejeune. e. Building M448 is a BEQ located on Company B Street at Camp Johnson, MCB Camp Lejeune. 2.) General Requirements - Paint Repairs (As Applicable) a. Paint all previously painted surfaces throughout the interior and exterior of the building. This will include all wall surfaces, doors, door frames, and window frames. b. Repair all cracks, holes, and damaged surfaces to provide a solid foundation for painting. If there are significant repairs needed (greater than 50 S.F.), it shall be noted below in the project area description. c. Clean and treat mold and mildew areas for finish coating application. d. Apply interior / exterior finish surfacing compound as appropriate to any damaged surfaces to match surrounding finishes. e. Replace any damaged or rotten trim boards, siding, or moldings, as quantified in the work area descriptions. Replace any loose, damaged, or missing caulking and glazing compound on windows, doors and other surfaces on the interior and exterior. f. Secure any loose trim boards, siding, or moldings that are not damaged or rotten. g. All repaired surfaces will be primed with latex KILZ 2 or equivalent unless otherwise noted in the project area description section. h. All metal surfaces shall have (2) coats of latex direct to metal semi-gloss finish paint applied unless otherwise noted in the project area description section. i. All interior wall surfaces shall have (2) coats of eggshell / satin finish latex paint applied unless otherwise noted in the project area description section. j. All wood trim and doors shall have (2) coats of semi-gloss latex finish paint applied unless otherwise noted in the project area description section. -- 1 of 3 -- DISTRIBUTION: DoW COMMUNITY ONLY k. All wood trim with natural finishes shall be sanded for finish appearance and (2) coats of polyurethane finish coat shall be applied areas unless otherwise noted in the project area description section. l. All exterior masonry surfaces shall have (2) coats of Loxon masonry coating or equivalent applied unless otherwise noted in the project area description section. m. All EFIS finishes shall have (2) coats of Semi-gloss finish paint unless otherwise noted in the project area description section. n. All high bay areas shall have (2) coats of a high gloss coating applied to provide maximum illumination of the work areas unless otherwise noted in the project area description section. o. Apply KILZ 2 or equivalent primer sealer and (2) coats of mildew resistant latex semi-gloss finish paint to all previously painted surfaces in the bathroom areas unless otherwise noted in the project area description section. p. Due to inadequate adhesion of previously painted finishes additional scrapping and preparation shall be required for all wood, masonry and metal surfaces. q. No roof surfaces are to be painted unless otherwise noted in the project area description. r. Cover all furniture, possessions, and building components as required protecting them from damage during accomplishment of interior and exterior painting. The contractor shall be responsible for the removal and resetting of all furniture. This includes any required disassembling and reassembling of furniture. s. The contractor shall provide a storage container on site to store furniture and other large items to keep them from being damaged during the work process. If work can be completed with furniture items in the center of the room and properly covered to ensure they are not damaged, then there is no need for a container to be utilized. It will be the responsibility of the contractor to move the furniture. t. Remove and reinstall all electrical/data switch and receptacle covers, to ensure all previously painted surfaces are repainted. u. Paint over existing painted stenciled signage and replace with newly painted stenciled signage with the same lettering or numbering. v. Repaint all exposed piping and piping insulation. Stencil proper markings on piping. w. Spray paint electrical panels, access panels, and expansion joints to match the adjacent wall color. Panels painted by brush are not acceptable. x. Clean all over-spray, drips, splatters and spills resulting from accomplishing this project from all surfaces as appropriate. y. No glass surfaces are to be painted unless otherwise noted in the project area description area. z. Special scheduling shall be required on all the buildings listed below. Approximately ¼ of the work areas shall be available for paint at one given time. It is the responsibility of the contractor to coordinate a schedule with the point of contact for each building. aa. The statement that all surf

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)