COAST GUARD BASE CAPE COD GUN RANGE CLEANING/MAINTENANCE

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
2121521-005
NAICS
562112
PSC
F108
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 13, 2026
Response due
August 15, 2026
Place of performance
Buzzards Bay, MA

What this opportunity is

The Department of Homeland Security is seeking a contractor for cleaning and maintenance services at the Small Arms Firing Range located at Coast Guard Base Cape Cod, Massachusetts. This opportunity is set aside for total small businesses under NAICS 562112, which covers hazardous waste management. Interested businesses should note that this is a Combined Synopsis/Solicitation notice, indicating they should track the opportunity closely and prepare to submit bids in response to the solicitation.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Performance Work Statement (PWS) for Range Services 1.0 INTRODUCTION Base Cape Cod (BCC) is acquiring services for the cleaning and maintenance of the small arms firing range (SAFR), the associated lobby areas and the heating, exhaust, and ventilation systems. All work shall be performed in accordance with applicable State and Federal regulations and any applicable Department of Defense (DOD) or Department of Homeland Security (DHS) policies. 2.0 BACKGROUND FORCECOM Armory Cape Cod (FCA-CC) in conjunction with BCC operates a live Small Arms Firing Range (SAFR). The facility is a six lane SAFR located at 3438 Beaman St, Buzzards Bay, MA 02532. The SAFR underwent a complete lead abatement and conversions to copper frangible ammunition in 2019. Copper frangible ammunition does release low concentrations of lead. Lead levels are expected to be low throughout the facility at present, apart from the range and bullet trap area. The SAFR is restricted to copper frangible ammunition at this time but may return to lead ammunition in the future as required. The SAFR facility is comprised of various areas as defined in Section 3.1 and shown in Figure 1 shown on page 15 of this PWS. The Armory building that is attached to the SAFR is not part of this scope of work. The Contracting Officer’s Representative Albert J Pulsifer, albert.j.pulsifer@uscg.mil. The FORCECOM Armory Supervisor is GMC Dolan, Frederick L, frederick.l.dolan@uscg.mil. Assumptions for this scope of work are: FORCECOM Armory Cape Cod implements an effective lead awareness training program and protocols to prevent cross contamination of lead in the adjacent building 3439. FORCECOM Armory Cape Cod implements weekly housekeeping measures in the SAFR. FORCECOM Armory Cape Cod completes daily, weekly, and monthly preventative maintenance on the Savage Range Systems Model 800W with Drag Conveyor bullet trap as prescribed in the Operation and Maintenance Manuals, Attachments 1 and 2. Bullet trap and HVAC maintenance will be completed in conjunction with an approved SAFR Cleaning. SCOPE SCHEDULED MAINTENANCE The Contractor shall provide a thorough cleaning of the SAFR Facility. Figure 1 shows the SAFR floor plan. Areas within the facility are to be cleaned below. Additionally, the Contractor will perform preventative maintenance on the Savage Range Systems Model 800W Snail trap with Drag Conveyor and perform preventative maintenance of the industrial non-re-circulating direct-fired heaters and associated ventilation system. More details regarding this work are provided in Section 5.0 Technical Requirements. The entry vestibule, classroom, mechanical room, two closets and corridor The firing line section, from the firing line back to the wall, with 6 shooting lanes The range portion which measures from the firing line to the beginning of the leading edge of the deflector plates The trap area which contains a Savage Range Systems Model 800W Snail trap with Drag Conveyor The liquid tank contains Snail Oil and pumps The conveyor space, crawl space beneath the conveyor, shelter and two masonry openings in the rear of the structure Ventilation ducting All contracted work will be conducted over a period not to exceed 5 consecutive weekdays. Work will start no earlier than 0730 and will be completed daily prior to 1600. The weeks for the cleaning and maintenance shall be scheduled with the SAFR supervisor for the months of November, February, May, and August. 3.2 ADDITIONAL MAINTENANCE AND REPAIRS The Contractor shall conduct a closing conference with the COR and FORCECOM Armory Supervisor upon completion of services to inform Coast Guard personnel of conditions found, and to make recommendations related to correction, maintenance procedures, operations and continued safe operation. The Contractor shall immediately notify the COR and FORCECOM Armory Supervisor if a piece of equipment is found to be deficient, so that the equipment can be immediately removed from service until repairs have been made. When deficiencies are found the Contractor shall provide a written estimate for repairs. All additional work will be issued via a funded modification to the contract. 4.0 APPLICABLE REGULATIONS AND DOCUMENTS All contracted work shall be performed in accordance with the following: 5.0 TECHNICAL REQUIREMENTS 29 CFR 1910.1025 OSHA General Industry Lead Standard. These regulations establish a permissible exposure limit (PEL) for airborne exposure to lead at 50 μg/m3 (8-hour TWA) 29 CFR 1910.120 OSHA Hazardous Waste Operations and Emergency Response Regulations 29 CFR 1910.134 Respiratory Protection Standard 105 CMR 460.000 Massachusetts Lead Poisoning Prevention and Control 454 CMR 22.04 Licensing Procedures for De-leading Contractors and Lead-safe Renovation Contractors 40 CFR 260 - 273 Federal Hazardous Waste Regulations 49 CFR Department of Transportation Regulations 310 CMR 30 Massachusetts Hazardous Waste Regulations Attachment 1 Operation and Maintenance Manual for Savage Range Systems Model 800W with Drag Conveyor Attachment 2 Operation and Maintenance Manual for Bullet Trap Drag Conveyor Attachment 3 Installation, operation, and maintenance manual for Intake ventilation Attachment 4 Installation, operation, and maintenance manual for Exhaust ventilation Attachment 5 Snail Lube Concentrate (Snail Oil) MSDS Attachment 6 Navy Environmental Health Center Technical Manual NEHC - TM6290.99- 10 Rev.1, Indoor Firing Ranges Industrial Hygiene Technical Guide 5.1 CONTRACTOR SET UP Prior to initiating work the Contractor shall follow these minimum requirements including but not limited to any additional applicable state and federal regulations and any applicable DOD and/or DHS policies: The Contractor shall post signs containing the minimum following language: CAUTION LEAD WORK AREA NO EATING DRINKING OR SMOKING

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 562112)