Lakehurst HAZMAT Services
DEPT OF DEFENSE
Notice type
Sources Sought
Solicitation #
FA448426HAZMATServices
NAICS
562112
PSC
F108
Set-aside
No Set aside used
Posted
July 20, 2026
Response due
August 5, 2026
Place of performance
CAPE MAY CH, NJ
Description
PERFORMANCE WORK STATEMENT
FOR
LAKEHURST ANNEX HAZMAT
1. DESCRIPTION OF SERVICES
1.1. Scope of Work. The contractor shall furnish all management, supervision, personnel,
tolls and other equipment. 87LRS will provide vehicles and forklift as required to operate
Hazardous Material (HAZMAT) distribution at Joint Base McGuire Dix Lakehurst (JBMDL)
Lakehurst buildings 271, 674, 579 and 609 and storage containers adjacent to building 674.
Service will be provided to Air Force mission partners and tenants who operate on JBMDL
Lakehurst.
1.2. HAZMAT Operations: The Contractor shall be responsible for storing, inventorying,
receiving, segregating, labeling, marking and issuing HAZMAT in accordance with Air Force
Instruction (AFI) 32-7086, Hazardous Materials Management, AFI 32-7042, Solid and
Hazardous Waste Compliance, and AFI 32-7080, Pollution Prevention Program, JB MDL
Hazardous Waste Management Plan for critical Air Force hazardous material requirement and all
federal, state, local, Department of Defense (DoD), and Air Force environmental laws and
regulations in effect at time of performance. AFI 32-7086 Hazardous Material Management
purpose is to: (1) support Air Force mission partner and tenant missions; (2) to protect the safety
and health of personnel on Air Force installations and communities surrounding Air Force
installations by ensuring proper management of HAZMAT; (3) to minimize Air Force, mission
partner and tenant use of HAZMAT consistent with mission requirements; (4) and to maintain
Air Force compliance with environmental requirements for HAZMAT usage. HAZMAT is DoD
owned and managed in EESOH/MIS not ILS-S.
1.3. The contractor shall take corrective and/or preventative actions in the event an
environmental nonconformance or noncompliance associated with the services is identified. In
the case of a nonconformance, the contractor shall respond and take corrective action based on
the time schedule established by the Contracting Officer Representative (COR). The contractor
will clean-up any and all spills on Lakehurst during normal duty hours. For all spills the
contractor must contact the base Fire Department and clean-up will be accomplished by the
contractor, e.g. paint spills. For large spills Civil Engineering (CE) or a contractor will
accomplish the other clean-ups and the contractor will be required to reimburse the government
for the cost of clean-up if the spill is the fault of the contractor. In the event of a spill, the COR
will be contacted and the COR will make the determination as to size of the spill and who is
contacted
1.4. The contractor will brief customers of potential hazardous associated with all HAZMAT
when issuing to customer. The contractor will process property in the Enterprise Environmental
Safety and Occupational Health Management Information System (EESOH/MIS).The contractor
will ensure material has the proper Safety Data Sheet (SDS) uploaded in system. If no SDS is
uploaded contact EESOH/MIS help desk to have SDS loaded. The contractor will do research
on HAZMAT items to be purchased and provide HAZMAT GPC credit card holder information
to purchase the items. The contractor will verify the authorized user listing, ensuring the
-- 1 of 4 --
customer is authorized to purchase the items. The contractor will follow in case of a conflict
among these laws and regulations, the most stringent laws or regulations shall apply.
1.5. If as a result of the contractor’s noncompliance with any applicable environmental law or
requirement, the Government incurs any cost (e.g., the cost of cleaning up a hazardous waste
spill); the contractor shall identify the Government and provide reimbursement for these costs.
All fines levied by federal, state and or local regulators will be paid by the contractor.
1.6. The contractor shall obtain non-hazardous products when available and shall participate
in established recycling programs. Prior to any purchase, stocking, and distribution of hazardous
products, the contractor will comply with AFI-7086 Hazardous Materials Management
governing hazardous material. The contractor shall maintain Safety Data Sheets SDS for all
chemicals and shall have them available for customers on products that require SDS.
The contractor is required to have the following training requirements. Forty hours of training
on Operational Safety and Health Administration (OSHA) Hazardous Waste Operations and
Emergency Response Standards (HAZWOPER) and associated annual refresher. Training on
EESOH/MIS system and OSHA Hazardous Communications (HAZCOM). The requirement to
have EESOH/MIS training will be validated.
1.6.1. The contractor will participate in the installation Hazardous Material Management
Process Team. This management process team reviews hazardous materials as necessary to
determine less hazardous substitutes. The team also reviews storage requirements on JBMDL
and associated hazardous material requirements.
1.7. GOVERNMENT FURNISHED PROPERTY:
1.7.1. Space Assignment. The contractor will operate out of building 271 with primary storage
of assets in building 674 with adjacent storage containers, building 609 and building 579. The
contractor is responsible for all costs associated with daily operations, and planning costs for the
spaces within their control. The contractor is also responsible for the design, installation, and
maintenance of internal and external signs advertising these locations.
1.7.2. Utilities. The government will provide utilities, i.e., water, electricity and refuse
collection. Refuse collection does not include hazardous waste.
1.7.3. Telecommunications. The government will provide the contractor POC with the
following: two computers, three monitors, one Multi-Function Device, one Thermal Printer, and
two Telephones). If the contractor desires additional phone service the contractor will have to
provide at their own expense.
1.7.4. Structural Repairs: The government is responsible for any structural repairs to t…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 562112)
S222--Regulated Medical Waste Removal
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 4, 2026
Environmental Waste Service
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 5, 2026
S222--Sharps & Regulated Medical Waste Services
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 6, 2026
Hazardous Waste Disposal for Portland VAHCS
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due July 28, 2026
Oily Waste Offload
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 21, 2026
FA8601 - Request For Proposal for Hazardous Waste Management at WPAFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 23, 2026