Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
DEPT OF DEFENSE
Notice type
Presolicitation
Solicitation #
W912PF26RA011
NAICS
237110
PSC
Z2NZ
Set-aside
No Set aside used
Posted
June 12, 2026
Response due
June 25, 2026
Place of performance
Longare, IT-VI
What this opportunity is
The Department of Defense is seeking contractors for a Design-Bid-Build (DBB) project focused on repairing storm sewer and sanitary sewer systems at Caserma Miotto in Longare, Vicenza, Italy. This opportunity is not set aside for small businesses, meaning all eligible contractors can compete. The presolicitation notice indicates that interested parties should track the opportunity closely, as it may lead to a formal solicitation for bids.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
General SOW
PART 1 PROPOSAL FORMS AND DOCUMENTS - Page 1
Part 1 Proposal Forms and Documents
PREFACE
This Statement of Work (SOW) consists of five parts.
Part 1 Contains typical contractual forms, procedures, bidding instructions, bond information,
clauses and wage decisions.
Part 2 Contains general contract administrative and execution requirements including, but not
limited to safety, design criteria & process, quality control, security, schedule, invoicing,
temporary facilities, and design and construction oversight processes.
Part 3 Lists the project requirements, specific scope items, background project information,
references, and expected quality level above and beyond those outlined in Part 4. Part 3 will be
provided with the specific Task Order. Within Part 3 section 5.0 ROOM REQUIREMENTS
provides detailed requirements on a room by room basis that further defines requirements that
are in addition to the ENGINEERING SYSTEMS REQUIREMENTS SECTION.
Part 4 Contains Performance Specifications and minimum quality requirements.
Part 5 Contains prescriptive specifications, contains necessary edited UFGS. The scheduling
and safety spec are included here.
Part 6 includes all 100% full design attachments which are:
x DRAWINGS
x SPECIFICATIONS
x BASIS OF DESIGN
x REPORTS
x PSC AND FASCICOLO DELL’OPERA
x SPECIFIC THIRD PARTY AGENCIES APPROVALS DOCUMENTS;
x PDC (PERMIT TO BUILD-PERMESSO DI COSTRUIRE) APPROVED
x MOU AND LICENSE SIGNED DOCUMENTS
x UTILITIES LINES RIGHT OF WAY ACT BETWEEN COMUNE DI LONGARE
AND PRIVATES FOR NEW TOC PIPE INSTALLATION
x LETTER OF WAIVER TO TAX PAYMENT BY US GOV AND BY CONTRACTOR
WORKING FOR US GOV PROJECTS
x VI.ABILITA’ APPROVAL FOR TOC CROSSING UNDER RIVIERA BERICA
-- 1 of 218 --
General SOW
PART 1 PROPOSAL FORMS AND DOCUMENTS - Page 2
TABLE OF CONTENTS (Parts 2-5)
PART 2 – GENERAL REQUIREMENTS
0 00 00 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00.05 20 WORK RESTRICTIONS
01 20 00.05 20 PRICE AND PAYMENT PROCEDURES
01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS
01 31 19.05 20 POST AWARD MEETINGS
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00.05.20 CONSTRUCTION SUBMITTAL PROCEDURES
01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19.05 20 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT FOR
DESIGN BUILD
01 78 00 CLOSE OUT SUBMITTALS
PART 3 – STATEMENT OF WORK / PROJECT PROGRAM
CHAPTER 1 – PROJECT DESCRIPTION
CHAPTER 2 – PROJECT OBJECTIVES
CHAPTER 3 – SITE ANALYSIS
CHAPTER 4 – BUILDING REQUIREMENTS
CHAPTER 5 – ROOM REQUIREMENTS
CHAPTER 6 – ENGINEERING SYSTEMS REQUIREMENTS
CHAPTER 7 – ATTACHMENTS
PART 4 – PERFORMANCE TECHNICAL SPECIFICATIONS
1.0 GENERAL REQUIREMENTS
2.0 PERFORMANCE TECHNICAL SPECIFICATIONS
A10 – FOUNDATIONS
A20 – BASEMENT CONSTRUCTION
B10 – SUPERSTRUCTURE
B20 – EXTERIOR ENCLOSURE
B30 – ROOFING
C10 – INTERIOR CONSTRUCTION
C20 – STAIRS
C30 – INTERIOR FINISHES D10 – CONVEYING
D20 – PLUMBING
D30 – HVAC D40 – FIRE PROTECTION
D50 – ELECTRICAL
E10 – EQUIPMENT
-- 2 of 218 --
General SOW
PART 1 PROPOSAL FORMS AND DOCUMENTS - Page 3
E20 – FURNISHINGS
F10 – SPECIAL CONSTRUCTION
F20 – SELECT BUILDING DEMOLITION
G10 – SITE PREPARATIONS
G20 – SITE IMPROVEMENTS
G30 – SITE CIVIL/MECHANICAL UTILITIES
G40 – SITE ELECTRICAL UTILITIES
PART 5 – PRESCRIPTIVE SPECIFICATIONS
SECTION 01 32 16.00 20 – SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
SECTION 01 33 10.05 20 – DESIGN SUBMITTAL PROCEDURES
SECTION 01 35 26 – GOVERNMENTAL SAFETY REQUIREMENTS
SECTION 01 78 23 – OPERATION AND MAINTENANCE DATA
SECTION 01 78 00 – CLOSEOUT SUBMITTALS
-- 3 of 218 --
General SOW
PART 2 GENERAL REQUIREMENTS - Page 4
Part 2 General Requirements
TABLE OF CONTENTS
• 00 00 00 GENERAL REQUIREMENTS
• 01 11 00 SUMMARY OF WORK
• 01 14 00.05 20 WORK RESTRICTIONS
• 01 20 00.05 20 PRICE AND PAYMENT PROCEDURES
• 01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS
• 01 31 19.05 20 POST AWARD MEETINGS
• 01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
• 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES
• 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES
• 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
• 01 45 00.10.20 QUALITY CONTROL FOR MINOR CONSTRUCTION
• 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
• 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
• 01 74 19.05 20 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
FOR DESIGN-BUILD
• 01 78 00 CLOSE OUT SUBMITTALS
00 00 00 GENERAL REQUIREMENTS
1.1 Definitions
As used throughout the SOW, the following terms have the meaning set forth below:
Contracting Officer (KO): The individual designated to administer the contract.
Throughout this contract, this individual will be responsible and possess the authority to
act on behalf of the Government with respect to the specific contract.
Contracting Officer’s Representative (COR): The individual designated by the Contracting
Officer as the authorized representative of the KO. The COR is responsible for monitoring
performance and technical management of the effort required and should be contacted
regarding questions or problems of a technical nature.
Contract: Contract or task order.
Contractor: The term Contractor refers to both the Prime Contractor and all
subcontractors, whether in contract with the Prime Contractor or other subcontractors at
any tier, including the Designer of Record.
Designer of Record (DOR): Licensed architect/engineer working as subcontractor to or
partner with Prime Contractor who provides design for this contract.
Quality Control (QC): Contractor's system to control the quality of design, material,
equipment and construction.
-- 4 of 218 --
General SOW
PART 2 GENERAL REQUIREMENTS - Page 5
Quality Assurance (QA) Program: Government's program to evaluate the effectiveness of
the Contractor's quality control. The Government's QA Program is not a substitute fo…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237110)
Rosebud Lift Station Construction
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due July 20, 2026
Scattered Sites Well Drilling Project CA22-D46 / EDO-295-D46
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due July 13, 2026
Temporary Sewer Line at Coast Guard Academy
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 3, 2026
Residential Water Pump Replacement at U.S. Consulate in Fukuoka
STATE, DEPARTMENT OF · Presolicitation
Replacement of Irrigation System, Clayton, NC
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 8, 2026
99 CES - FLOW METER FOR FACILITY 1711
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 1, 2026