FA8601 - Request For Proposal for Hazardous Waste Management at WPAFB

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
FA860126R0009
NAICS
562112
PSC
S222
Set-aside
No Set aside used
Posted
July 20, 2026
Response due
July 23, 2026
Place of performance
Wright Patterson AFB, OH

Description

Performance Work Statement (PWS) For The Hazardous Waste Program At Wright-Patterson Air Force Base, Ohio 23 June 2025 -- 1 of 30 -- Table of Contents 1.0 GENERAL INFORMATION AND PURPOSE 1.1 DESCRIPTION OF SERVICE 1.1.1 KEY TASKS AND REQUIRMENTS 1.1.1.1 HW PROGRAM CONTAINER PICK-UPs 1.1.1.1.1 PICK-UP REQUESTS 1.1.1.1.2 PICK-UP TURN-AROUND TIMES 1.1.1.1.3 CONTAINER VALIDATION 1.1.1.1.4 CONTAINER WEIGHT 1.1.1.1.5 CONTAINER TRANSFER 1.1.1.1.6 PICK-UP LOG 1.1.1.2 HWAS COMPLIANCE AND CONTAINER MANAGEMENT 1.1.1.2.1 TREATMENT OF HAZARDOUS WASTE ON GOVERNMENT FACILITIES 1.1.1.2.2 STATEMENT OF CONTAINERS 1.1.1.2.3 SEGREGATION OF WASTE 1.1.1.2.4 HWAS COMPLIANCE MEASURES 1.1.1.2.5 DATABASE MANAGEMENT & INVENTORY 1.1.1.2.6 WASTE CHARATERIZATIONS & RECORD KEEPING 1.1.1.2.7 REPORTS 1.1.1.3 DISPOSITION PREPARATION - GENERAL 1.1.1.3.1 CONTAINER PACKAGING 1.1.1.3.2 CONTAINER MINIMIZATION/COST REDUCTION 1.1.1.3.3 CONTAINER PACKAGING DEFINITIONS AND GUIDELINES 1.1.1.4 DISPOSITION PREPARATION – WASTE SPECIFIC CATEGORIES 1.1.1.4.1 GAS CYLINDERS 1.1.1.4.2 LOW LEVEL MIXED WASTE (LLMW) 1.1.1.4.3 PCB-RELATED WASTES 1.1.1.4.4 UW LAMPS 1.1.1.5 DISPOSITION TIMELINES 1.1.1.5.1 GENERAL 1.1.1.5.2 GAS CYLINDERS 1.1.1.5.3 POLYCHLORINATED BIPHENYLS (PCBs) 1.1.1.5.4 UNIVERAL WASTES (HW) 1.1.1.6 FINAL DISPOSITION PREPARATION AND SHIPMENT LOADING 1.1.1.6.1 SHIPMENT PAPERWORK REVIEW 1.1.1.6.2 FINAL CONTAINER DISPOSITION PREPARATION -- 2 of 30 -- 1.1.1.6.3 SHIPMENT LOADING 1.1.1.7 ADDITIONAL COMPLIANCE ASSISTANCE & CUSTOMER SUPPORT 1.1.1.7.1 GENERAL COMPLIANCE ASSISTANCE AND CUSTOMER SERVICE 1.1.1.7.2 COMPLIANCE ASSISTANCE AND CUSTOMER SERVICE 1.1.1.8 SPILL RESPONSIBILITY 1.2 PERFORMANCE REQUIREMENTS SUMMARY 1.3 HOURS OF OPERATION 1.4 SECURITY REQUIREMENTS 1.4.1 REQUIRED SECURITY REPORTING 1.4.2 PHYSICAL SECURITY 1.5 KEY PERSONNEL 1.5.1 CONTRACT MANAGER 1.5.2 CONTRACTOR PERSONNEL 1.6 OTHER DIRECT COSTS (ODCs) 1.6.1 SUPPLIES AND EQUIPMENT 1.6.2 TRAVEL EXPENSES 1.6.3 DEFICIENCY LIST COMPLETION AND WITHOLDING OF FINAL PAYMENT 1.7 GOVERNMENT FURNISHED EQUIPMENT (GFE)/ GOVERNMENT FURNISHED PROPERTY (GFP) 1.8 GOVERNMENT FURNISHED INFORMATION 1.9 GOVERNMENT FURNISHED PROPERTY AND SERVICES 1.10 CONTRACTOR FURNISHED VEHICLES AND EQUIPMENT 2.0 OPERATIONAL REQUIREMENTS 2.1 POST-AWARD MEETING/ TELECONFERENCE 2.2 PROGRESS MEETINGS 2.3 PRESENTATION MATERIALS 2.4 CONTRACTOR PERSONNEL TRAINING 2.5 QUALITY MANAGEMENT PLAN 2.6 SCHEDULE AND PLANNING REQUIREMENTS 2.7 CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT 3.0 OTHER REQUIRMENTS 3.1 CONTRACT PERFORMANCE EVALUATION 3.2 WORK SCHEDULE COORDINATION -- 3 of 30 -- 1 1.0 GENERAL INFORMATION AND PURPOSE This Performance Work Statement outlines the requirements to provide support to the Wright- Patterson Air Force Base (WPAFB) Hazardous Waste (HW) Program in meeting the technical and compliance requirements established by local, state, federal, and Air Force laws and regulations. The work to be performed under this contract will be performed at Wright- Patterson Air Force Base, Greene County, Ohio. The contractor shall comply with the terms and conditions of this contract and shall be immediately capable of addressing and interpreting all Environmental Laws and regulations as they pertain to the work performed under this contract period of performance. 1.1 DESCRIPTION OF SERVICES The Contractor shall provide all personnel, transportation, tools/materials/equipment, and other items necessary to transport waste containers from satellite accumulation areas (SAAs) to central accumulation areas (CAAs), manage container compliance within the CAAs, provide customer service and compliance assistance to the installation, and prepare containers for off- site disposition via Defense Logistics Agency – Disposition Services (DLA-DS) disposal contracts or other locally procured disposition contracts, if available. The Contractor shall perform these services in compliance with the Hazardous Materials Transportation Act (HMTA), and 49 Code of Federal Regulations (CFR) Department of Transportation (DOT); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA); the Pollution Prevention Act; other applicable federal (including 40 CFR Parts 264/265, Subparts A through E), state, and local laws and regulations; the Toxic Substance Control Act (TSCA) 40 CFR Part 761 for storage and disposal of PCBs; related Department of Defense (DoD) and DAF directives (including DAF Instruction (DAFI) 32-7001 Environmental Management, AF Manual [AFMAN] 32-7002 Environmental Compliance and Pollution Prevention, and guidelines included in the Hazardous Waste Playbook); and the installation-level Hazardous Waste Management Plan (HWMP). Wastes covered by this contract may include RCRA hazardous waste, non-RCRA waste, State- regulated wastes, non-State regulated wastes, universal wastes, gas cylinders, used oils, off- spec fuels, polychlorinated biphenyls (PCBs), asbestos, or other wastes generated at WPAFB. In accordance with the Air Force Manual (AFMAN) 32-7002 Environmental Compliance and Pollution Prevention, SAAs are hereto referred to as Initial Accumulation Points (IAPs) and CAAs as hazardous waste accumulation areas (HWAS). -- 4 of 30 -- 2 1.1.1 KEY TASKS AND REQUIRMENTS 1.1.1.1 HW PROGRAM CONTAINER PICK-UPS The Contractor shall pick-up all containers of waste from either IAPs or points of generation (non-IAPs) on the installation and transport the waste to the corresponding HWAS as appropriate: 1) 90-day accumulation site in Area A 2) 1-year TSDF site in Area B or 3) Universal Waste Lamp facility in Area B. WPAFB includes approximately 115 IAPs. The requirements of this section apply to all waste type containers except gas cylinders. See Section 1.1.1.4.1 of this PWS for specific requirements for picking up gas cylinders. 1.1.1.1.1 Pick-Up Requests The Contractor shall be responsible for picking up waste initiated by a removal request. The rem

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 562112)