Description
Page 1 of 7
STATEMENT OF WORK
Roof Replacement for Cudjoe Quarters #8
Cudjoe Key, Florida
March 30, 2026
Asset #: 10051054
Work Order #:
PART 1. GENERAL
1.1. Bid Item No. Roofing Cudjoe Key Quarters #8 is located at 21920 Disturbed Pine Road
on Cudjoe Key, Florida. This house is owned by the U.S. Fish and Wildlife Service and is part of
the Florida Keys National Wildlife Refuge Complex. The house is an elevated one-story
residence approximately 1163 square feet. The house was built in 1994, and the current roof
has outlived its lifecycle. This work is necessary to address deficiencies in the existing roof
structure and to provide a reliable, long-term building envelope that protects federal assets,
supports continued facility use, and reduces the risk of future structural deterioration, water
intrusion, and storm-related damage. The work shall include demolition, structural framing
modifications, roof deck installation, underlayment, flashing, trim, ventilation, and final
installation of the new roofing system in accordance with applicable building codes,
manufacturer requirements, and approved plans. The Roof Replacement for Cudjoe Quarters
#8 scope of work shall include all associated work, including but not limited to:
a. This project consists of the complete removal and replacement of the existing roof
structure and roofing system on the subject building. The existing roof shall be demolished and
replaced with a newly constructed 3:12 slope hip roof system finished with an aluminum
standing seam metal roof. The work is intended to provide a durable, code-compliant, wind-
resistant, and corrosion-resistant roof assembly suitable for long-term service in a coastal and
high-exposure environment.
b. The Contractor shall furnish all labor, supervision, materials, equipment, tools,
transportation, temporary protection, inspections, disposal, and incidental items necessary to
complete the work. All work shall be performed in accordance with applicable federal, state, and
local codes and regulations, manufacturer installation requirements, and approved construction
documents.
c. The work shall include the complete removal and lawful disposal of the existing
roofing system, including roofing material, underlayment, flashing, trim, fasteners, and other
associated roof components. The Contractor shall also remove the existing roof framing and
structural elements to the extent necessary to reconstruct the roof to the required 3:12 pitch and
-- 1 of 7 --
Page 2 of 7
hip roof configuration. Any deteriorated, damaged, or non-code-compliant roof framing, roof
decking, or related structural members encountered during demolition that would affect the
performance or integrity of the new roof system shall be replaced as part of this project.
d. The Contractor shall reconstruct the roof framing system as necessary to create a
uniform and structurally sound 3:12 slope hip roof, which includes extending the roof
structure over the porch. This work shall include all required rafters, hip framing, ridge
framing, blocking, bracing, connectors, anchors, and fastening necessary to provide a complete
structural roof assembly properly integrated with the existing building. The Contractor shall
verify field dimensions and existing conditions prior to construction and shall ensure all framing
is properly aligned, adequately supported, and securely fastened.
e. New roof decking shall be installed where required to support the new roof system.
Roof decking shall be exterior-grade and of sufficient thickness and fastening to meet structural,
code, and manufacturer requirements for the installed roof assembly and design wind loads.
Any roof deck material found to be deteriorated, water-damaged, or otherwise unsuitable for
reuse shall be removed and replaced.
f. The Contractor shall install a complete weather-resistant roof underlayment system
compatible with the aluminum standing seam roof assembly. The underlayment system shall
include self-adhering waterproof membrane at eaves, penetrations, valleys, and other critical
transition points, as well as a high-temperature synthetic or other manufacturer-approved
underlayment across the roof deck as required to provide a continuous secondary moisture
barrier.
g. The new roof shall consist of a complete aluminum standing seam metal roofing
system installed over the reconstructed roof framing and decking. The roof system shall be
configured as a hip roof with a 3:12 slope and shall include all panels, concealed fasteners,
clips, flashings, closures, trim, sealants, and accessories necessary to provide a complete,
watertight, and serviceable installation. Roofing materials and attachment methods shall be
suitable for the building location and exposure and shall meet applicable wind uplift, weather
resistance, and corrosion resistance requirements.
h. The Contractor shall provide and install all flashing and trim required for a complete
and functional roof assembly, including but not limited to drip edge, fascia trim, ridge and hip
caps, valley flashing where applicable, penetration flashing, closure systems, and all transition
or termination flashing necessary to ensure the roof system is fully weatherproofed. All roof
system components shall be compatible in material and finish to minimize the potential for
galvanic corrosion and premature failure.
i. Where applicable, the Contractor shall modify, reconnect, or replace roof ventilation
and drainage components as needed to accommodate the new roof geometry and ensure
proper roof performance. The completed roof system shall provide positive drainage and shall
be installed in a manner that prevents water intrusion, ponding, or other performance
deficiencies.
-- 2 of 7 --
Page 3 of 7
j. The Contractor shall protect the building, adjacent structures, utilities, equipment, and
surrounding site from damage during demolition and construction activities. Temporary dry-in
and weather protection shall be maintained at all times as…