GAOA Chilao Campground Water System Rehabilitation, Angeles National Forest
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1240LT26Q0066
NAICS
237110
PSC
Z2NE
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 24, 2026
Response due
July 7, 2026
Place of performance
Palmdale, CA
Description
1
US Department of Agriculture (USDA)
Statement of Work
GAOA Chilao Campground Complex – Water System Rehabilitation
-- 1 of 6 --
2
Contents
Project........................................................................................................................................................................ 3
General Information .................................................................................................................................................... 3
1.0 Scope of Work.................................................................................................................................................... 3
2.0 Background........................................................................................................................................................ 3
3.0 Location............................................................................................................................................................. 3
4.0 Estimated Start Date / Period of Performance ....................................................................................................... 3
5.0 Drawings and Specifications ................................................................................................................................ 3
6.0 Restrictions on Work ........................................................................................................................................... 3
7.0 Camping and Housing ......................................................................................................................................... 4
8.0 Required Submittals............................................................................................................................................ 4
Contractor Requirements ............................................................................................................................................. 4
9.0 Technical Requirements / Tasks .......................................................................................................................... 4
10.0 Government Furnished ...................................................................................................................................... 5
11.0 Deliverables / Schedule ..................................................................................................................................... 5
12.0 Travel .............................................................................................................................................................. 5
13.0 Contractor’s Key Personnel................................................................................................................................ 5
14.0 Security Requirements ...................................................................................................................................... 6
15.0 Data Rights ...................................................................................................................................................... 6
16.0 Section 508 – Electronic and Information Technology Standards .......................................................................... 6
Attachments ............................................................................................................................................................ 6
-- 2 of 6 --
3
Project
Chilao Campground Complex – Water System Rehabilitation
General Information
1.0 Scope of Work
The Contractor will be performing water utility and road work in the Chilao area. Water utility work will include installing
pipe following the existing alignment and rerouting at particular areas to run within the roadbed. Supporting work to
include replacement of infrastructure in existing valve boxes, fire boxes, and stand pipes, construction of a new valve
box, rehabilitation of three existing tanks, and replacing appurtenances at four well locations. Road work will include
pulverization and paving of existing roads. The Contractor will be responsible to maintain water service to buildings at
the
Visitor Center and Chilao fire station areas and tie into existing campground loops.
2.0 Background
The Chilao Campground Complex water system was developed by the Forest Service in the 1930s, see attachment
ChilaoSystemHistoricalDrawing. This aged infrastructure is in need of repair to continue serving a fire station, recreation
campsites, visitor’s center, and partners in the immediate area. Repair to the pipeline, valves, tanks, and sources will
ensure delivery of potable water at Chilao. The most recent diagram of the system is shown in attachment
ChilaoSchematic1999.
3.0 Location
The main portion of the work will take place around the Chilao Campground complex which includes the Chilao Visitor
Center (34.32673611, -118.00565556), Chilao Fire Station (34.333400, -118.025400), picnic area, and various
campground loops (Manzanita, Coulter, Little Pines, and Meadow). The four wells are located about two miles north up
State Route 2 Angeles Forest Highway near the 6000 ft PCT Trailhead (34.34963400, -117.96283056) along a trail.
4.0 Estimated Start Date / Period of Performance
The Chilao Campground Complex area is at a high elevation which can have snow and ice during winter months. The
desired start date is Summer 2026 in hopes a majority of the work is completed before winter conditions impact access,
which is not always the case, and to avoid work during the summer as the water system serves a fire station which is
important for fire response. A period of performance of 180 days will be given for the contract from the issuance of the
Notice to Proceed and weather will be taken into account for time extensions. The Forest Service intends to have a
complete closure of the Chilao CG Complex during construction activities to limit disruptions. Contractor will need to
submit a request for…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237110)
MONITORING WELL ABANDONMENT, EASTON MD
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 6, 2026
USFWS FLINT HILLS NWR, KS - PUMP REPLACEMEN
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 24, 2026
Contractor shall furnish and install a Septic Tank Drain Field for SR#584 in White Cloud, KS (Brown County)
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 3, 2026
TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516
DEPT OF DEFENSE · Solicitation · due July 27, 2026
TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516
DEPT OF DEFENSE · Solicitation · due July 27, 2026
Well 4 PFAS/PFOA Upgrade
DEPT OF DEFENSE · Solicitation · due September 8, 2026