HELENA NATIONAL FOREST - Solar System Install on Existing Well
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1240LU26Q0107
NAICS
238210
PSC
Z1AZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 24, 2026
Response due
August 6, 2026
Place of performance
Townsend, MT
Description
Exhibit A.2
Page 1 - 5
-- 1 of 5 --
Project:
Reference Number:
95027333 3 SQF-3
Q
[US GPM]
3.0
2.5
2.0
1.5
1.0
0.5
Company name:
Created by:
Phone:
Email:
Date:
Client:
Client Number:
Contact:
3 SQF-3 eta
� - --, [%]
70
60
50
40
30
20
10
0.46 0.50 0.54 0.58 P1 [kw]
0.0 ::!-::-:c:--i��ZE.fl'..-:'1,!l....-+�-:----r-::.-::--r--::--,---.--,......---r---,---r---+----.---r-::.-::--r--r---.--,......---r---,---r----r----.---.----r---.,..l. 0
0 0.02 0.06 0.10 0.14 0.18 0.22 0.26 0.30 0.34 0.38 0.42
Q = 2.27 US GPM
P1 = 0.339 kW
Pumped liquid = Water
H = 333.4 ft
Eta pump+motor = 42 %
Density = 62.29 lb/ft3
-- 2 of 5 --
Project:
Reference Number:
95027333 3 SQF-3
08(5/16")
co
co
�
• • • 1 • • •
15/1
Note! All units are in [in] unless others are stated.
1"NPT
II
Disclaimer: This simplified dimensional drawing does not show all details.
Company name:
Created by:
Phone:
Email:
Date:
Client:
Client Number:
Contact:
-- 3 of 5 --
Project:
Reference Number:
95027333 3 SQF-3
Flow: 700US GPD ()
Month for sizing: July
Static lift above ground: 10 ft
Dynamic water level: 320 ft
Sun tracking: No (fixed)
Location: Helena, Montana, United States
Latitude: 46.5889 DD, Longitude: -112.0385 DD
Water production, Peak flow and Price
Total water production per year: 909 m•
Avg. water production per day: 658 US GPO
Average water production per watt per day: 5.8 I/Wp/day
Solar module configuration:
Number of solar modules in series: 2, in parallel:
Solar array rated power: 0.43 kW
Solar array rated volts: 76 V
Sun tracking: No (fixed)
Tilt angle: 47 deg.
AC power (backup) - water production
Recommended minimum output: 0.656 HP
AC 115 V: Produces: 2.73 US GPM
AC 230 V: Produces: 2.75 US GPM
System performance - monthly average
Company name:
Created by:
Phone:
Email:
Date:
Client:
Client Number:
Contact:
Pump: 3 SQF-3, 1 x 95027333
Solar module: 2 x SPM220W COPY
Typical performance at solar radiation 800 W/m2
Flow: 2.3 US GPM
Total head: 333.4 ft
Cables and pipes:
Pump cable length: 82 ft
Pump cable size: 14 AWG
Total cable loss: 2.9 %
Material, riser pipe: PEH
Pipe length of riser pipe: 320 ft
Total friction losses: 3.448 ft
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Water production [US GPO]
Energy production Solar [kWh/day]
Radiation horizontal [kWh/m2 day]
Radiation tilt [kWh/m2 day]
Avg. Temp. [°F]
295 534 747 790 824 852 993 935 828 594 305 192
0.9 1.4
1.1 2.0
1.9 2.1
3.3 4.4
2.1 2.2
5.3 5.8
2.6
6.6
2.4
5.4
2.1
3.9
1.6
2.3
0.9
1.2
0.7
0.8
2.2 3.4 4.5 4.8 5.0 5.2 6.0 5.7 5.0 3.7 2.2 1.7
21.6 22.5 27.7 35.1 44.4 51.6 60.6 59.4 50.2 37.4 27.3 20.5
Data location: Latitude: 47 DD, Longitude: -113 DD
Accessory is missing 92799796
Water production - monthly Water production - daily: July
1,000
900
800
US GPO
F M A M J
Month
A s 0 N D
2.4 US GPM
2.2
2.0
1.8
1.6
1.4
1.2
1.0
0.8
0 1 2 3 4 5 6 7 8 9 11 13 15 17 19 21
Time of Day
-- 4 of 5 --
Project:
Reference Number:
Installation and Input
. . .
Pump Curve
a
(USGPMJ
. .. .. ..
. •· .
. . . .. . .. . .
3 SOF·3 eta
(%)
Q = 2.27 US GPM
H = 333.4 ft
P1 = 0.339 kW
Eta pump+motor = 42 %
Pumped liquid= Water 70
Density= 62.29 lb/IP
Company name:
Created by:
Phone:
Email:
Date:
Client:
Client Number:
Contact:
Sizing Results
Water production, Peak flow and Price
Total water production per year: 909 m•
Avg. water production per day: 658 US GPD
Average water production per watt per day: 5.8 I/Wp/day
Solar module configuration:
Number of solar modules in series: 2, in parallel:
Solar array rated power: 0.43 kW
Solar array rated volts: 76 V
Sun tracking: No (fixed)
Tilt angle: 47 deg.
Typical performance at solar radiation 800 W/m2
Flow: 2.3 US GPM
Total head: 333.4 ft
Cables and pipes:
Pump cable length: 82 ft
Pump cable size: 14 AWG
Total cable loss: 2.9 %
Material, riser pipe: PEH
Pipe length of riser pipe: 320 ft
Total friction losses: 3.448 ft
Location: Helena, Montana, United States
Latitude: 46.5889 DD, Longitude: -112.0385 DD
Dimensional Drawing
08(5/16")
-- 5 of 5 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238210)
US Coast Guard Air Station Savannah Generator
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 19, 2026
Z1DA--Project No. 552-26-202 - Replace Overhead Paging System
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 5, 2026
1788 - Hanscom AFB HNJ Lundy AV Upgrade
DEPT OF DEFENSE · Solicitation · due August 21, 2026
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 29, 2026