Install - Bird Netting and Curtains, 126ARW, Scott AFB
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
W50S7S26Q0014
NAICS
561710
PSC
S207
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 17, 2026
Response due
August 17, 2026
Place of performance
Scott Air Force Base, IL
What this opportunity is
The Department of Defense is soliciting a total small business set-aside contract for the installation of bird netting and curtains at Scott AFB, Illinois. This procurement is suitable for small businesses in the NAICS code 561710, which includes facilities support services. As a Combined Synopsis/Solicitation, the notice indicates that interested parties should track the solicitation for updates, as it will not be a formal bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT (PWS)
FOR
REPAIR LRS Outdoor Storage B5018
VDYD262009
SCOTT AIR FORCE BASE, ILLINOIS
18 June 2026
1. REQUIREMENT:
a. BACKGROUND: The LRS Outdoor Storage area, Building 5018, has an existing system
of expandible/collapsible curtains that close off the covered storage area. These woven
plastic curtains are deteriorated, torn, and at the end of their useful lives. The curtain
system works with users pulling the curtains to the sides of openings when needed and
then pulling them back to their closed positions. This measure was established to prevent
birds and other elements from entering and nesting in the storage areas. It has proven
inefficient and cumbersome and has reached the end of its useful life. The LRS Building
5016, has three large bay overhead doors that have bird prevention curtains in front of
them as well.
b. OBJECTIVES: The objective of this project is to replace the exterior curtains with a
system that closes off the outdoor storage space from birds and other elements and
functions efficiently with its day-to-day operations. The existing stored material in the
Outdoor Storage Building 5018 is to be cleaned, sanitized, and temporarily relocated
during this project. Following the installation of the bird prevention materials, the former
stored material will be returned.
c. PROJECT LOCATION: All work will be at the 126th Air Refueling Wing, Scott AFB,
Illinois.
2. PROJECT ADMINISTRATION:
SITE VISIT: Contractor is responsible for verifying all measurements and conditions pre-
bid. The Government intends to only hold one official site visit. Requests for additional
site access must go through the 126th Contracting Squadron (126 CONS) point of contact
(POC) listed in the Request for Proposal (RFP) letter. Any additional site access will be
made available to all Contractors solicited for this project.
a. MEETINGS
i. Kick-Off Meeting/Project Schedule – Kick-off meeting to occur within one week of
NTP. Overall project schedule with milestone markers and 2-week look-ahead to be
completed at kick-off meeting.
-- 1 of 10 --
ii. Contractor shall coordinate with the 126th Contracting Squadron (126 CONS) on bi-
weekly meetings once the construction phase begins. This meeting shall include the
review of an updated 2-week look ahead schedule. Contractor shall provide meeting
minutes within 24 hours of each meeting and allow the Government up to 24 hours to
accept or request changes to the minutes.
3. PROJECT SCOPE:
a. The contractor shall address the known issues identified in this scope. To the maximum
extent possible, contractors should identify defects or discrepancies not noted below by
submitting a Request for Information (RFI) prior to bid submission.
b. BASE BID (CLIN 001): B5018 LRS Outdoor Storage Building
c. Task 1: Material Relocation, Demolition, Debris Disposal, and Surface Preparation
i. 1.1 Material Relocation: Prior to initiating any demolition or construction work,
the 126 LRS shall temporarily relocate all stored materials, storage containers,
palletized materials, and equipment from within Building 5018.
ii. 1.2 Demolition & Removal: Safely demolish, remove, and properly dispose of
all six (6) bay widths of existing deteriorated woven plastic expandable/collapsible
curtains, vertical track guides, wall brackets, anchors, and associated mounting
hardware. Remove the bird netting and associated hardware on the back face of the
walls opposite the curtained sides. On the three overhead doors of the LRS
Building 5016, remove the three bird prevention curtains and associated hardware.
iii. 1.3 FOD and Waste Management: Because this facility is located at the 126th
Air Refueling Wing, all demolished materials must be bagged and consolidated
immediately to prevent wind-blown debris on the active airfield. Track and report
all solid waste and recycling metrics, providing certified weight tickets to 126 CES
upon project completion.
iv. 1.4 Surface Restoration: Inspect the structural integrity of the existing fascia,
soffits, and metal siding after hardware removal. Patch, caulk, and seal all
remaining penetrations and screw holes using heavy-duty, commercial-grade,
weather-resistant, non-sag polyurethane sealant conforming to ASTM C920.
Repair, prime, and paint fascia, exterior siding to match the existing exterior finish
in strict accordance with the Scott Air Force Base Architectural Compatibility
Guidelines.
d. Task 2: Industrial Roll-Up Curtain System Installation
i. 2.1 Material Specifications: Propose and install an exterior-grade, heavy-duty
industrial roll-up curtain system across the six (6) designated bays. Curtain fabric
must consist of high-strength, UV-stabilized, vinyl-coated polyester mesh
(minimum fabric weight of 17 oz/sq. yd.) with a weave density designed to block
birds and vectors while allowing a minimum of 30% airflow to minimize wind sail-
effect. Mesh fabric must be certified fire-retardant conforming to NFPA 701
(Method 2).
ii. 2.2 Wind Load & Structural Reinforcement: The roll-up system must be
-- 2 of 10 --
engineered to withstand local wind loads (minimum wind load rating of 90 MPH in
accordance with UFC 3-301-01 / local building codes). Curtains must include
horizontal wind-stiffening bars (heavy-duty fiberglass or galvanized steel) inserted
into heat-sealed pockets at uniform vertical intervals to prevent blowouts and
excessive billowing. Contractor to submit alternative methods that meet these
requirements for approval.
iii. 2.3 Guides, Tracks, and Seals: Install vertical side-guide channels (extruded
aluminum or heavy-gauge galvanized steel) complete with dual-brush weather-
stripping to seal the vertical edges. The bottom pocket of the curtain must feature a
heavy-duty, flexible loop seal containing a weighted pipe or foam block to conform
to uneven concrete surfaces, establishing a positive barrier against birds and
rodents.
iv. 2.4 Operation Mechanisms: Curtains shall be operated via a heavy-duty manual
chain-hoist sy…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 561710)
Integrated Pest Management Services
DEPT OF DEFENSE · Solicitation · due July 27, 2026
Pest Management Services at Joint Base Elmendorf-Richardson, Alaska
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 11, 2026
Install - Bird Netting and Curtains, 126ARW, Scott AFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 17, 2026
Sources Sought For Pest Control at USMA
DEPT OF DEFENSE · Sources Sought · due July 31, 2026
Pest Management Services at Joint Base Elmendorf-Richardson, Alaska
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 11, 2026
Pest control Services at USCG Base New Orleans, 5830 Memphis St, New Orleans, LA 70124.
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 3, 2026