What this opportunity is
The Department of Defense is seeking a contractor for electrical repairs and the replacement of existing lighting with LEDs at the 200th Combat Weather Flight facility in Virginia. This opportunity is a total small business set-aside under NAICS code 238210, making it suitable for small businesses specializing in electrical contracting. Interested vendors should note that this is a Combined Synopsis/Solicitation, meaning they must submit quotes by July 9, 2026, and be prepared for a site visit on June 25, 2026.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
VIRGINIA AIR NATIONAL GUARD
192d CIVIL ENGINEER FLIGHT
165 SWEENEY BLVD BLDG.768
JOINT-BASE LANGLEY-EUSTIS, VA 23665
WX FLT REPLACE LIGHTS, INSTALL/REPAIR ELECTRICAL
PROJECT NUMBER: CVVM 26-2005
DATE: 18 May 26
FOR
UNITED STATES PROPERTY AND FISCAL OFFICES
VIRGINIA AIR NATIONAL GUARD
HAMPTON, VA 23665
TABLE OF CONTENTS
SECTION
GENERAL INFORMATION
CUSTOMER
LOCATION
PROJECT OBJECTIVES
WORK HOURS
PERIOD OF PERFORMANCE
POCs
SCOPE OF WORK
DIMENSIONS AND REQUIREMENTS
DEMOLITION AND REMAINING STRUCTURES
INSTALLATION GUIDELINES
ENVIRONMENTAL
MISCELLANEOUS PROJECT REQUIREMENTS
DELIVERABLES
MATERIAL SUBMITTALS
DRAWINGS/PROJECT CDs
OWNERS MANUALS
WARRANTIES
ANTI-TERRORISM/OPERATIONS SECURITY/INFO PROTECTION
ATTACHMENTS
LIGHTING SCOPE
EMERGENCY LIGHTING LAYOUT
5.3. ELECTRICAL SCOPE
5.4. ELECTRICAL SPECIFICATIONS
1.0 GENERAL INFORMATION
CUSTOMER
192d Wing Civil Engineering, Virginia Air National Guard
LOCATION
200th Combat Weather Flight
6025 Beulah Rd
Sandston, VA 23150
PROJECT OBJECTIVES
The purpose of this project is to make electrical repairs, replace existing fluorescent/incandescent lights and ballasts with LEDs as described in Section 2.0. Contractor will ensure that existing finishes, drywall and adjacent surfaces remain free of damage as noted in Section 2.0.
WORK HOURS
Work hours are Monday through Friday 0800-1530
PERIOD OF PERFORMANCE
The Government's Period of Performance is sixty (60) calendar days from the date of the Notice to Proceed (NTP).
POINT OF CONTACT (POC)
Contracting Officer: MSgt Orlando Loaiza
Project Manager/Contracting Officer Representative (COR): Susan Dyer
2.0 SCOPE OF WORK
The work herein includes the furnishing of all materials and equipment and performing all labor for the work indicated by the statement of work listed below. All work shall conform to those standards stipulated in the building code, mechanical code, and electrical code applicable in the local jurisdiction. Any deviation from the manufacturer’s installation requirements must be approved prior to construction. All stated quantities are required to be field verified.
DIMENSIONS & REQUIREMENTS
Quotes shall include all testing, materials, labor and equipment required to perform the work and shall include updates to electrical panel schedule as needed and prior to Project Close Out. All quantities and dimensions stated are approximate, Contractor required to field verify prior to ordering product or beginning work on site.
2.1.1. BASE BID – Electrical Work:
INSTALL NEW ELEC CIRCUITS: Install two (2) new circuits and provide a total of four (4) new standard duplex convenience receptacles (20A, 120V). Outlets will be field located by Owner prior to installation. Pricing shall consider high ceilings at three (3) locations on site – approx. 10’-15’ AFF. (SEE ATTACHMENT 5.3); Contractor will ensure that drywall work is performed, as required to match existing level 4 finish and will provide paint to match existing as required.
REPAIR EXTERIOR FLOOD LIGHT: Securely re-attach the existing hinged cover on one (1) existing exterior LED wall pack. Note that wall pack is mounted at a high location - approx. 10-15’ AFG. (SEE ATTACHMENT 5.3)
REMOVE AND REPLACE LIGHTS: Carefully remove ten (10) existing 2'x4' recessed troffer light fixtures located in the Training Room and Two Offices as noted on ATTACHMENT 5.1; Prep existing bulbs and ballasts for disposal per State Regulations; Provide and install new LED light fixtures to maintain Emergency Egress Overhead Lighting settings and in locations per Attachment 5.2.
2.1.2. BID OPTION 1 – Remove and Replace Lights:
Carefully remove ten (10) existing 2'x4' recessed troffer light fixtures and eleven (11) 2'x2'
recessed troffer light fixtures located in the Halls, Open Offices (Bull Pen) and Break Area as noted on ATTACHMENT 5.1; Prep existing bulbs and ballasts for disposal per State Regulations; Provide and install new LED light fixtures to maintain Emergency Egress Overhead Lighting settings and in locations per Attachment 5.2.
Remove and replace remaining lights as noted on ATTACHMENT 5.1 - Carefully remove fourteen (14) existing 1'x2' pendant light fixtures located in the Garage, Garage Storage Room, Garage Janitors Closet and in the Mechanical Room; Carefully remove five (5)
existing recessed can lights from the ceiling of Garage Showers and existing Rest Rooms; Carefully remove two (2) wall-mounted pendant lights from Rest Rooms. NOTE: Ensure that drywall work is performed, to match existing level 4 finish, provide and apply paint to match existing where required; Prep existing bulbs and ballasts for disposal per State Regulations; Provide and install new LED light fixtures to maintain Emergency Egress Overhead Lighting settings and in locations per Attachment 5.2.
DEMOLITION AND REMAINING STRUCTURES
Protect government property adjacent to demolition work.
Prepare surfaces to receive new product per manufacturer’s recommendations.
INSTALLATION GUIDELINES
Ensure that all debris is cleared from work site on a daily basis and for the duration of the work and provide proper safety material to protect pedestrians and occupants of the facility for the duration of the work.
All Electrical work shall conform to current UFC (Unified Facilities Code), IBC (International Building Code) & NFPA-70 (National Fire Protection Association) requirements.
ENVIRONMENTAL
Contractor shall ensure that all products are Per- and polyfluoroalkyl (PFAS), Lead, and Volatile Organic Compound (VOC) Free.
Dust Control: Contractor shall maintain a clean, dust free work environment and will
ensure that dust/debris from overhead ceiling tiles is removed from the job site daily.
MISCELLANEOUS PROJECT RQUIREMENTS
Contractor will clean up between workdays and after the comp…