N--GC26 SCADA UPS REPLACEMENT

INTERIOR, DEPARTMENT OF THE

Notice type
Solicitation
Solicitation #
140R4026R0006
NAICS
238210
PSC
N059
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 17, 2026
Response due
June 26, 2026

What this opportunity is

The U.S. Department of the Interior is seeking a contractor for the replacement of the SCADA Uninterruptible Power Supply at the Glen Canyon Powerplant in Arizona. This opportunity is set aside for total small businesses under NAICS 238210, which covers electrical contractors. Interested vendors should note that this is a solicitation notice, indicating the need to track the opportunity closely for submission requirements and deadlines.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

ATTACHMENT 1 Glen Canyon SCADA Uninterruptible Power Supply Replacement Colorado River Storage Project, Arizona Upper-Colorado Region Solicitation No. 140R4026R0006 U.S. Department of the Interior June 2025 -- 1 of 163 -- Glen Canyon Powerplant Solicitation No 140R4026R0006. SCADA Uninterruptible Power Supply Replacement, Arizona Table of Contents 00 01 10 - 1 SECTION C - DESCRIPTION/SPECIFICATIONS TABLE OF CONTENTS DIVISION 01 – GENERAL REQUIREMENTS 01 11 00 Summary of Work 01 12 10 Other Contracts 01 14 10 Use of Site 01 14 30 Interruption of Service 01 31 22 Coordination Meetings 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 35 50 Site Security 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 60 00 Product Requirements 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents 01 80 15 Commissioning DIVISION 26 – ELECTRICAL 26 05 02 Basic Electrical Materials and Methods 26 05 05 Selective Demolition for Electrical 26 05 10 Conductors and Cables 26 05 33 Raceways and Boxes 26 05 90 Wiring Checkout and Tests 26 24 41 Distribution Panelboards 26 26 10 Transformer Load Center 26 28 30 Enclosed Circuit Breakers 26 33 53 Static Uninterruptible Power Supply DIVISION 52 – DRAWINGS 52 00 00 Drawings END OF SECTION -- 2 of 163 -- Glen Canyon Powerplant Solicitation No 140R4026R0006. SCADA Uninterruptible Power Supply Replacement, Arizona Table of Contents 00 01 10 - 2 This page intentionally left blank. -- 3 of 163 -- Glen Canyon Powerplant Solicitation No. 140R4026R0006 SCADA Uninterruptible Power Supply Replacement, Arizona Summary of Work 01 11 00 - 1 SECTION 01 11 00 SUMMARY OF WORK PART 1 GENERAL 1.01 LOCATION A. Work is located at Hwy 89 at Glen Canyon Dam, Page, AZ 86040. 1.02 PRINCIPAL COMPONENTS OF WORK A. Work consists primarily of replacing the SCADA Uninterruptible Power Supply: 1. Demolish and remove the existing SCADA UPS systems and associated components; remove the associated conduit and conductors that will not be reused with the new system. 2. Install a new SCADA UPS system and associated components; provide new conduit and conductors for equipment when not reused. 1.03 SPECIFICATIONS REQUIREMENTS A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52. B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated. C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within a sentence or phrase. 1.04 DEFINITIONS A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued. 1.05 ACRONYMS A. The following acronyms apply to specifications Divisions 1 through 52: 1. CO: Contracting Officer. 2. COR: Contracting Officer’s Representative. 3. UPS: Uninterruptible Power Supply PART 2 PRODUCTS Not Used -- 4 of 163 -- Glen Canyon Powerplant Solicitation No. 140R4026R0006 SCADA Uninterruptible Power Supply Replacement, Arizona Summary of Work 01 11 00 - 2 PART 3 EXECUTION Not Used END OF SECTION -- 5 of 163 -- Glen Canyon Powerplant SCADA Uninterruptible Power Supply Replacement, Arizona Solicitation No. 140R4026R0006 Other Contracts 01 12 10 - 1 SECTION 01 12 10 OTHER CONTRACTS PART 1 GENERAL 1.01 MEASUREMENT AND PAYMENT A. Cost: Include in prices offered in the Price Schedule for other items of work. 1.02 OTHER CONTRACTS A. During work under this contract, other work may be performed in the vicinity of the work by Government or other contractors. B. Cooperate and coordinate with other contractors on access to and use of work areas and Contractor use areas. C. Do not interfere with work of other contractors or Government in vicinity of work. D. Cooperate and coordinate with other contractors on use of temporary utilities. E. Cooperate and coordinate with other contractors on maintaining dust-free operations. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION -- 6 of 163 -- Glen Canyon Powerplant SCADA Uninterruptible Power Supply Replacement, Arizona Solicitation No. 140R4026R0006 Other Contracts 01 12 10 - 2 This page intentionally left blank. -- 7 of 163 -- Glen Canyon Powerplant SCADA Uninterruptible Power Supply Replacement, Arizona Solicitation No. 140R4026R0006 Use of Site 01 14 10 - 1 SECTION 01 14 10 USE OF SITE PART 1 GENERAL 1.01 MEASUREMENT AND PAYMENT A. Cost: 1. Include in prices offered in the Price Schedule for other items of work. 1.02 SUBMITTALS A. In accordance with Section 01 33 00 – Submittals. B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan: 1. For each Contractor use site on Government land: a. Show use location and extent of impact. Uses include but are not limited to the following: 1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards. 2) Parking areas, temporary roads, and haul routes. 3) Utilities including air, power, and water lines; fire hydrants; and compressor station. 4) First-aid and medical facilities. 5) Areas for processing, storing, and disposing of waste materials from construction operations. 6) Temporary fences. b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed, and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion. c. Describe methods to protect, and

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238210)