MELSTONE DAM LIVESTOCK WATER SUPPLY

INTERIOR, DEPARTMENT OF THE

Notice type
Solicitation
Solicitation #
140L3626Q0034
NAICS
237110
PSC
Y1PZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 11, 2026
Response due
July 6, 2026

What this opportunity is

The Department of the Interior is seeking a contractor to install a livestock water system at Melstone Dam in Musselshell County, Montana. This project includes the installation of various components such as a solar pump, pipelines, and site reclamation. It is set aside for total small business participation, making it suitable for small contractors in the construction sector (NAICS 237110). As this is a solicitation notice, interested businesses should prepare to submit bids rather than simply track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

MELSTONE DAM LIVESTOCK WATER SYSTEM BUREAU OF LAND MANAGEMENT MUSSELSHELL COUNTY, MONTANA TECHNICAL SPECIFICATIONS PREPARED FOR BUREAU OF LAND MANAGEMENT MONTANA STATE OFFICE 5011 SOUTHGATE DRIVE BILLINGS, MT 59101 APRIL 2026 -- 1 of 46 -- Print Date: April 2026 Table of Contents - i https://doimspp-my.sharepoint.com/personal/jhelm_blm_gov/Documents/SOD/Construction Projects 1/2026 Melstone Dam/Livestock Water System Design/Specifications/_Cover-TOC.docx MELSTONE DAM LIVESTOCK WATER SYSTEM TECHNICAL SPECIFICATIONS TABLE OF CONTENTS DIVISION 1 - GENERAL REQUIREMENTS 01010 Summary of Work 01019 Government Furnished Property 01060 Permits 01150 Measurement and Payment 01200 Project Meetings 01300 Submittals 01400 Quality Control/Quality Assurance 01600 Material and Equipment 01700 Contract Closeout DIVISION 2 - SITEWORK 02229 Pipeline Installation 02300 Site Materials 02370 Geosynthetics 02665 Water Systems -- 2 of 46 -- GENERAL REQUIREMENTS -- 3 of 46 -- MELSTONE DAM LIVESTOCK WATER SYSTEM SECTION 01010 BLM SUMMARY OF WORK Print Date: April 2026 01010-1 PART 1 - GENERAL 1.01 WORK INCLUDED: This project will install a livestock water system at the Melstone Dam reservoir, located in Musselshell County, approximately 1.5 miles west of Melstone, MT. Major items of work at this dam include: A. Install an inlet structure below normal reservoir water elevation when the Melstone Dam reservoir has been drained for dam reconstruction. B. Install an 18î annular Corrugated Metal Pipe (CMP) riser with a pitless adapter, solar pump, and 800W solar array. C. Install 4î and 1.5î HDPE pipeline from and to: 1) Inlet to Pump and 2) Pump to Outlet. D. Reclaim all disturbed areas, including construction staging areas and temporary roads. Reclamation consists of the preparation of soil for seeding. 1.02 CONTRACTOR USE OF PREMISES: Confine operations to the site of the proposed Work or within the right-of-way or construction easements provided and shown on the drawings. [The construction area will be the same as that of the Melstone Dam Reconstruction project, as shown in the provided drawing.] Construction camps and staging areas outside the construction area must be approved by the GOVERNMENT. Obtain advance approval from the GOVERNMENT of all staging areas, excavated soil stockpile, waste areas, and camping areas. NOTE: Awardee will coordinate work with exsisting contractor at the site. It shall be understood the responsibility for protection and safekeeping of equipment and materials on or near the site will be entirely that of the CONTRACTOR and that no claim shall be made against the GOVERNMENT by reason of any act of an employee or trespasser whether GOVERNMENT has paid CONTRACTOR for equipment or materials in storage or not. It shall be further understood should any occasion arise necessitating access by the GOVERNMENT to the sites occupied by these stored materials and equipment, the CONTRACTOR owning or responsible for the stored materials or equipment shall immediately remove same. No materials or equipment may be placed upon the property of the GOVERNMENT until the GOVERNMENT has agreed to the location contemplated by the CONTRACTOR to be used for storage. CONTRACTOR is solely responsible for obtaining and shall pay all costs in connection with any additional work area, storage sites, access to the site, or temporary right-of-way, which may be required for proper completion of the Work. 1.03 PROTECTION OF EXISTING UTILITIES: Utility service connections are generally shown on the drawings, but the CONTRACTOR is solely responsible for locating all existing underground installations, including service connections, in advance of excavating or trenching by calling One Call of Montana at 811. The CONTRACTOR shall use his own information and shall not rely solely upon the information shown on the drawings concerning existing underground installations. Repair all damage to existing utilities or property at the CONTRACTOR's expense. -- 4 of 46 -- MELSTONE DAM LIVESTOCK WATER SYSTEM SECTION 01010 BLM SUMMARY OF WORK Print Date: April 2026 01010-2 1.04 PROTECTION OF EXISTING STRUCTURES: Where excavation will be required adjacent to existing structures, the CONTRACTOR is solely responsible for maintaining the structural integrity of the existing structures. Take whatever means necessary to ensure the existing structures are not damaged. Repair all damage to the existing structures at the CONTRACTOR's expense. Repair any fences destroyed during construction to the satisfaction of the Government or property owner. Unless otherwise noted on the Construction Drawings, restore all existing ditches disturbed by construction to their original size, line, and grade. Structures located downstream of the dam shall also be protected during reservoir dewatering activities. Restore or repair to original condition roads, culverts, bridges, cattle guards, fences, or any other structures damaged by the CONTRACTORís activities and access to the sites at no additional cost to the project. 1.05 FIELD CHECK OF EXISTING STRUCTURES: Dimensions and elevations of existing structures and locations of existing fences, pipelines, conduits, cables, and equipment shown on the drawings were taken, for the most part, from available records and survey data and are not guaranteed for accuracy. Check all dimensions and elevations of existing structures, pipelines, conduits, cables, equipment, or other existing items, both above and below ground, affected by or affecting the Work under this contract, prior to the start of construction or ordering materials and equipment affected thereby. 1.06 SITE ACCESS: A. The CONTRACTOR shall provide a Site Access Plan submittal to the GOVERNMENT prior to beginning site work. The submittal will show how the CONTRACTOR proposes to install, maintain, remove, and restore temporary access to key locations within the projectís construction limits. Determine the adequacy of all roads, culverts, cattle guards

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237110)