What this opportunity is
The Department of Defense intends to sole source new systems furniture for the DeFlorez Building at NSA Orlando, Florida, under NAICS 337214. This presolicitation notice indicates that the project is not set aside for small businesses, but it may suit companies with experience in federal furniture contracts and compliance with applicable codes. Interested vendors should note the timeline for completion by September 25, 2026, and prepare to submit required documentation promptly after award.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Project Title: Deflorez Lab Furniture Upgrade
Activity Location: DeFlorez Building, NSA Orlando
Scope of Work Prepared by: NAWCTSD, Orlando
PART 1 GENERAL
1 GENERAL INFORMATION:
It is the declared and acknowledged intention and meaning to provide new systems furniture in
rooms 2152, 2151, and 5115 in the Deflorez Building of NAS Orlando located at 12211 Science
Drive, Orlando, FL 32826.
1.1 Detailed Project Description
Phase 1: Purchase, ship, and store new systems furniture as listed in the materials list. Furniture
must match existing. All work to be coordinated with the government (NAWCTSD) and work
must be completed by 25 September 2026.
Several requirements for this project phase are as follows:
• All applicable federal, state, and local codes shall be followed including but not limited to
Unified Facility Criteria found at https://www.wbdg.org/ffc/dod/unified-facilities-
criteria-ufc
• Ensuring that all work is tested to be complete and useable
• Ensuring dust and noise levels are kept to a minimum with daily cleanup.
1.2 SUBMITTALS
Submit three copies of the following for approval by the Contracting Officer within 7 calendar
days after award.
1.2.1 Statements
a. Safety Data Sheet (SDS),
b. Statement of Nonuse of Ozone Depleting Substances (ODS),
c. Accident Prevention Plan including Activity Hazard Analysis,
d. Work Schedule,
e. Bonds and insurance.
f. Name, SSN, and Citizenship of each on site worker, and
g. Standard drawings in ACAD LT 2012 and PDF.
1.3 PERIOD OF PERFORMANCE
-- 1 of 3 --
Project Title: Deflorez Lab Furniture Upgrade
Activity Location: DeFlorez Building, NSA Orlando
Scope of Work Prepared by: NAWCTSD, Orlando
a. The Contractor shall be required to complete all work, ready for use, not later than 25
September 2026.
1.4 DEFINITIONS
Where "as shown", "as indicated", "as detailed", or words of similar import are used, it shall be
understood that reference to the drawings/sketches accompanying this specification is made
unless stated otherwise. Where "as directed", "as permitted", "approved", "acceptance", or
words of similar import are used, it shall be understood that the direction, requirements,
permission, approval, or acceptance of the Contracting Officer is intended unless stated
otherwise. As used herein, "provided" shall be understood to mean "provided complete in place
in a completely usable condition", that is "furnished and installed". As used herein "secure" shall
be understood to mean "marked by solidity, firmness, and stability, especially in design or
construction".
1.5 SAFETY REQUIREMENTS
In performing the contract, the Contractor shall provide for protecting the lives and health of
employees and other persons and for preventing damage to property, materials, supplies and
equipment in accordance with the latest revision of the U.S. Army Corps of Engineers "Safety
and Health Requirements Manuals" (EM 385-1-1) and "Occupational Safety and Health
Standards" (29 CFR 1910). Prior to commencement of the work, the Contractor shall meet in
conference with representatives of the Contracting Officer to discuss and develop mutual
understandings relative to the administration of safety. All OSHA work standards shall be
followed including but not limited to Lockout/Tagout procedures. Electrical Safety Code and
OSHA 1910 subchapter S shall be specifically followed. Prior to commencement of the work,
the contractor shall meet in conference with representatives of the Contracting Officer to discuss
and develop a mutual understand relative to the administration of safety. Power shall not be
deenergized without at least 2 weeks’ prior approval of the Contracting Officer. No live
electrical work shall be permitted.
PART 2 PRODUCTS
Use only Contracting Officer approved parts or materials.
PART 3 EXECUTION
3.1 STATION REGULATIONS
The Contractor and his employees and subcontractors shall become familiar with and obey all
applicable Federal, State, local and station regulations, including fire, safety, traffic, and security
-- 2 of 3 --
Project Title: Deflorez Lab Furniture Upgrade
Activity Location: DeFlorez Building, NSA Orlando
Scope of Work Prepared by: NAWCTSD, Orlando
regulations. No employee of the Contractor shall be admitted to the work site without
satisfactory proof of United States citizenship. Some work areas may require an escort and/or a
security clearance for access.
3.1.1 Working Hours
Work hours will be coordinated with the Contracting Officer. No power disruptions are
allowable during normal working hours. The Contractor will work together with the Contract
Surveillance Representative for access into restricted spaces. Contracting Officer shall approve
working hours prior to commencement of work. Regular working hours shall consist of an 8-
hour period established by the Contracting Officer between 6 a.m. and 6 p.m., Monday through
Friday, excluding Government holidays.
-- End of Scope of Work --