What this opportunity is
The Department of Defense is seeking a contractor to provide repair and maintenance services for Pentacam medical equipment at Naval Hospital Camp Pendleton in California. This opportunity is suitable for small businesses under NAICS code 811210, particularly those with expertise in medical equipment maintenance and qualified technicians. As this is a Special Notice, interested businesses should track the opportunity closely for potential bidding announcements rather than submitting proposals at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
1. Introduction
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools,
materials, supervision and other items services necessary to perform the necessary maintenance,
repairs, support and software updates as defined in the Statement of Work (SOW) except for
those items specified as government furnished property and services. The Contractor shall
perform to the standards in the SOW.
Background:
Naval Hospital Camp Pendleton (NHCP) has a mission requirement to provide quality medical care
to patients. To meet this requirement, NHCP is required to maintain all equipment ready for use for
surgical and clinical procedures. Medical equipment must be maintained at peak efficiency with
little to no down time to meet the demands of mission requirements. In support of quality efficiency,
all government-owned Pentacam equipment requires qualified Technicians who can understand the
complex medical equipment and provide immediate solutions and/or replacements needed.
2. Description of Services
Preventive Maintenance:
Preventative maintenance (PM) services shall be performed one time annually. The Ophthalmology
Department with the Biomed Department are responsible for scheduling the service. If the service
is not scheduled within the year, no refunds will be granted. Contractor will pay the costs for any
parts which the service technician deems require replacement, except that parts damaged by gross
negligence or misuse are excluded.
• Perform service repair/PM to industry standard.
• Only FULLY QUALIFIED FIELD ENGINEERS and TECHNICIANS who have gone
through original equipment manufacturer (OEM) shall be employed in the performance of
any and all work performed under this contract.
• Make repairs to the extent necessary to ensure a functional system that will efficiently
nerve its intended purpose and in compliance with federal, state, and local regulations.
• Wear and tear parts check according to manufacturer’s guidelines during system
inspection and calibration included.
Repairs:
Repairs within the period of performance must be prioritized by the Contractor and shall be
-- 1 of 2 --
arranged in a timely manner as noted above. Telephonic technical support shall be provided
immediately as to assess or troubleshoot matter or issue and coordinate repair services, when
necessary. Repair services, when necessary, best effort shall be done to schedule within a 24-hour
period from first notification made to the Contractor. Report of repairs and services shall be made
available upon completion of work performed prior to checking out.
• NHCP Biomedical Engineering will provide the initial assessment.
• Notify the medical repair branch immediately upon receipt of OEM or Replacement
parts/equipment safety recalls notices.
• Ensure that original design and functional capabilities will not be changed, modified, or
altered unless the medical repair branch authorizes such changes.
• Provide suitable OEM recommended repair equipment/tools required for the satisfactory
execution of all repairs made.
• Furnish manufacturer OEM approved lubricants and lubricate wear points within the
equipment.
• Extend to the Government all commercial warranties on replacement parts, consistent with
standard industry practices.
Replacement Parts: All replacement parts needed during PM service or repair services must be
provided by Contractor. Consumables needed shall be noted before scheduling service to ensure
these are available for Contractor upon arrival to perform service(s).
Software Updates: Service Hotline, Technical Phone Support and Remote Services will be
available for technical, application and connection issues, sources of malfunction, software updates,
technical emergencies.
Field Service Reports: Contractor sends a completed field service report upon completion of work
performed prior to checking out.
3. Invoicing and Payment
Submission:
• Invoices must reference the contract number and be submitted electronically via
the Wide Area WorkFlow (WAWF) system in accordance with the terms of the
contract.
-- 2 of 2 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.