What this opportunity is
The Department of Defense is seeking a contractor to provide Real Property Inventory, Accountability, and Inspection Support Services at Fort Stewart and Hunter Army Airfield in Georgia. This opportunity is set aside for total small businesses under NAICS 541350. Interested firms should note that this is a Sources Sought notice, indicating the government is gathering information rather than soliciting bids at this time, which means tracking the opportunity is essential for future bidding. The contractor will be responsible for conducting facility inspections, maintaining accurate records, and developing a Quality Control Plan.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Performance Work Statement
For
Real Property Inspection Support
for the Department of Public Works (DPW)
Fort Stewart and Hunter Army Airfield Fiscal year 2027
24 July 2026
Curtis Hanna Lotasha Preston
Contracting Officer Real Property COR
MICC Ft Stewart, GA Ft Stewart, GA
-- 1 of 13 --
1. GENERAL: This is a non-personnel services contract to provide Real Property
Support services. The Government shall not exercise any supervision or control over the
contract service providers performing the services herein. Such contract service
providers shall be accountable solely to the Contractor who, in turn is responsible to the
Government.
1.1 Description of Services/Introduction: The Contractor shall provide personnel for
onsite inspections of Real Property and support services as defined in this Performance
Work Statement except for those items specified as Government furnished property and
services.
1.2 Background: Army Regulation 405-45 requires real property inventory to be
validated every 5 years. Due to the size of inventory, 20% inventory validation is
conducted annually. The inspectors must perform inspections of facilities in accordance
with AR 405-45.
1.3 Objectives: The contractor shall provide skilled and experienced workers to:
• Conduct DPW Real Property Inventory facility inspections
• Enter inspection results in GFEBS and Real Property physical files
• Maintain GFEBS and physical files with current and accurate facility inspection
data
• Maintain an accurate hand receipt listings of all real property facilities
1.4 Scope: Annual facility inspections will be divided equally into the number of months
in the period of performance until the completion date. Progress of facility inspections
will be reported in the Monthly Status Report. Currently there are approximately 5306
facilities on Fort Stewart, GA (FSGA) and approximately 1803 on Hunter Army Airfield
(HAAF). Must complete all assigned inspections NLT 30 AUG of each calendar year.
1.5 General Information
1.5.1 Quality Control: The contractor shall develop and maintain a Quality Control Plan
describing the Quality Control Program. The draft QC Plan will be reviewed and
approved by the COR so that corrections may be made by the contractor prior to
implementation on contract start date. The contractor shall submit the final QC Plan
within 30 days after contract award. The Contractor's Quality Control Plan shall be
subject to review and approval by the Government throughout the contract period. An
updated copy of the Contractor's Quality Control Plan shall be provided to the COR at
least five workdays prior to implementation of any changes. The Quality Control Plan
-- 2 of 13 --
shall be the basis of the Contractor's Quality Control Program and shall address all
quality requirements.
1.5.2 Quality Assurance: The Government shall evaluate the Contractor’s performance
under this contract in accordance with the Quality Assurance Surveillance Plan. This
plan is primarily focused on what the Government must do to ensure that the Contractor
has performed in accordance with the performance standards. It defines how the
performance standards will be applied, the frequency of surveillance, and the minimum
acceptable defect rate(s).
1.5.3 Hours of Operation: The Contractor is responsible for providing services, between
the hours of 7:00 a.m. and 3:30 p.m. Monday thru Friday except Federal holidays or
when the facility is closed at the discretion of the Government. The Contractor must
maintain an adequate workforce for the uninterrupted performance of all tasks defined
within this PWS when the facility is open. When hiring personnel, the Contractor shall
keep in mind that the stability and continuity of the workforce.
1.5.4 Place of Performance: Daily reporting will be 1616 Veterans Parkway, Fort
Stewart, GA unless otherwise directed. The majority of work will be performed at FSGA
or HAAF.
1.5.5 Security Requirements: Access and general protection/security policy and
procedures. Contractor and all associated sub-contractors’ employees shall provide all
information required for background checks to meet installation access requirements to
be accomplished by installation Provost Marshal Office, Director of Emergency Services
or Security Office. Contractor workforce must comply with all personal identity
verification requirements (FAR clause 52.204-9, Personal Identity Verification of
Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the
changes otherwise authorized by the changes clause of this contract, should the Force
Protection Condition (FPCON) at any individual facility or installation change, the
Government may require changes in contractor security matters or processes.
1.5.5.1 AT Level 1 Training: All contractor employees, including subcontractor
employees, requiring access to Army installations, facilities, and controlled-access areas
shall complete AT Level I awareness training within 30 calendar days after the contract
start date or effective date of incorporation of this requirement into the contract,
whichever is applicable. The contractor shall submit certificates of completion for each
affected contractor employee and subcontractor employee, to the COR or to the
contracting officer, if a COR is not assigned, within 5 calendar days after completion of
training by all employees and subcontractor personnel. AT Level I awareness training is
available at the following website: http://jko.jten.mil
1.5.5.2 Common Access Card (CAC): Before CAC issuance, the contractor employee
requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries
(NACI) or an equivalent or higher investigation in accordance with Army Directive
2014-05. The contractor employee will be issued a CAC only if duties involve one of the
-- 3 of 13 --
following: (1) Both physical access to a DoD facility and access, via logon, to DoD
networks on-site or remotely; (2) Remote access, via logon, to a Do…
Source: SAM.gov, as posted. Verify the current solicitation before responding.