Description
STATEMENT OF WORK
TO
Repair by Replace Roof
Building, B512
AT
MILWAUKEE MITCHELL FIELD
AIR NATIONAL GUARD BASE
MILWAUKEE, WI
Prepared by:
128th Civil Engineer Squadron
128th Air Refueling Wing, Milwaukee, WI
04 June 2026
-- 1 of 20 --
Replace Roof, B512
Date: June 2026
Page | 2
TABLE OF CONTENTS
PART I - STATEMENT OF WORK
1. SW-01 Description of Work
A. Work to Be Completed
B. Location
2. SW-02 Applicable Standards and Specifications
3. SW-03 Principal Features
A. Base Quote: Repair by Replace Roof, B512
B. Option 1: Tuck Point Sections and Paint, B512
C. Option 2: Install SFS Doors, B512
PART II - SPECIAL CONDITIONS
1. SC-01 Pre-performance Conference
2. SC-02 Contractor Responsibilities
3. SC-03 Quality Control/Quality Assurance
4. SC-04 Responsibility:
5. SC-05 Materials and Labor
6. SC-06 Clean Up
7. SC-07 Coordination
8. SC-08 Warranties
9. SC-09 Work Site Access
10. SC-10 Health & Safety Requirements
11. SC-11 Fire Prevention
12. SC-12 Security Requirements
13. SC-13 Environmental Requirements
14. SC-14 Damage Reports
15. SC-15 Protection of Existing Facilities
16. SC-16 Definitions
17. SC-17 Government Furnished Property and Services
PART III – ILLUSTRATION
1. I-01 Photos and Documents Attached
-- 2 of 20 --
Replace Roof, B512
Date: June 2026
Page | 3
PART I - STATEMENT OF WORK
1. SW-01 Description of Work:
A. Work to be completed: The Contractor shall provide all professional services, personnel, materials,
equipment, labor, supervision, and facilities necessary to perform contractual construction services, as stated in these
specifications, at the 128th Air Refueling Wing, located at Milwaukee Mitchell International Airport, Milwaukee, WI
53207-6151. The Contractor is responsible for ensuring proper documentation received is for personnel and vehicle
passes (72 hours prior, during normal days of operation) in time to avoid any delay in project start of performance.
This includes personnel attainment of contractor badges and notification to the Civil Engineer Squadron representative
for scheduling of escort support. Contractor will be required to coordinate/de-conflict scheduling with Civil Engineer
personnel.
B. Location: Milwaukee Mitchell International Airport is located approximately 10 miles south of downtown
Milwaukee, WI. The 128th Air Refueling Wing is located on the east side of Milwaukee Mitchell International
Airport.
2. SW-02 Applicable Standards and Specifications:
A. The Contractor shall provide all necessary materials, equipment and additional appurtenances required to
complete the project as stated in these specifications. The Government is not responsible for any additional parts,
material, or equipment required to make this a complete and usable product. The criteria contained and cited in this
SOW establish minimum standards. In case of discrepancy in any of the referenced standards and specifications, the
more stringent requirements shall assume precedence. Any questions should be brought to the COR’s attention.
B. The Contractor must comply with the most current applicable WI. Adm. Codes, applicable Industry
Standards, ICD 705 Regulations, UFC 3-110-03, UFC 1-200-01, UFC 1-900-01, UFC 3-310-05, UFC 3-190-06,
UFGS 09 90 00, ANG ETL 15-01, and all OSHA regulations as they apply to ensure safe and secure work areas to
minimize potential safety hazards to base personnel and avoid impact to base operations. In case of conflict in or
between the contract documents and a governing code or ordinance, the more stringent standard shall apply.
C. The Contractor must comply with the requirements set forth in FAA regulations in accordance with 14 CFR
Part 77.9, if a crane is required. Regulations and forms are available at http://oeaaa.faa.gov.
D. The Contractor shall ensure a safety plan is in place for the duration of the project. Contractor shall cordon
off work areas in a manner to minimize potential safety hazards to base personnel/equipment and ensure minimal
impact to base operations. The Contractor shall ensure that proper fall protection is utilized as necessary.
E. The Contractor shall preserve and protect all structures, materials, equipment, and vegetation on or adjacent
to the work site and protect all existing structures and materials from physical damage and secure work areas in a
manner to minimize potential hazards and impact to base personnel and operations during the duration of construction.
FAR 52.236-9 “Protection of existing Vegetation, Structures, Equipment, utilities and improvements”.
F. The Contractor shall repair all interior and exterior finishes damaged as a part of executing the work with
finishes that match the existing conditions. Coordinate this work with the Government. The contractor shall be
responsible for all cutting, replacement, and repairing of their work that is due to faulty workmanship. This includes
work not specifically covered by Description of Work for trades that are affected. The contractor will also be
responsible for providing, without extra cost to the Government, any small incidental items not specifically mentioned
in trade specifications, but which are necessary to complete the work in accordance with the general understanding
that the work, when completed, shall be a finished competent job. Reference Contract Clause FAR 52.236-5, “Material
and Workmanship” and FAR 52.246-12, “Inspection of Construction”.
G. The Contractor shall be responsible for the temporary protection of the building fabric and the interior from
inclement weather as it relates to the work outlined in this document.
-- 3 of 20 --
Replace Roof, B512
Date: June 2026
Page | 4
H. The Contractor shall acquire a Hot Work permit from the base fire station if they anticipate any open flames
or sparks created during demolition or construction.
I. The Contractor is responsible for removing and disposing of all construction and demolition debris generated.
Consider all material recyclable or reusable, unless clearly…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238160)
LIRI EMERGENCY ROOF REPAIR
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due August 7, 2026
Installation of roof sealant
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 6, 2026
Office Roof Replacement Deer Creek Lake
DEPT OF DEFENSE · Solicitation · due August 3, 2026
Z1DA--550-27-111 B58 Roof Repair
VETERANS AFFAIRS, DEPARTMENT OF · Presolicitation · due September 16, 2026
Birch Creek Roofing Replacement
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 17, 2026
Seoul Chancery, Consular, IMOT, PCC, IPC, and ESO Outbuilding Roof Replacements
STATE, DEPARTMENT OF · Presolicitation · due July 27, 2026