The Department of Defense is seeking industry input for a Fiber Optic Cabling Requirements contract, specifically for the 341 Contracting Squadron at Malmstrom Air Force Base in Montana. This opportunity falls under NAICS code 238210 and is suitable for small businesses capable of providing personnel, management, and equipment for cable installation and maintenance. As this is a Special Notice, interested vendors should track the opportunity for further details rather than submit bids at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
3
PERFORMANCE WORK STATEMENT (PWS)
for 341 CS Cable/Infrastructure Requirements Contract Malmstrom Air Force Base,
Montana
18 June 2026
Prepared by 341 CS
1.0 DESCRIPTION OF SERVICES
1.1 Contractor-Furnished Equipment/Vehicles.
The contractor shall provide and maintain all equipment and vehicles necessary to fulfil the
requirements of this contract. Maintenance and repair of contractor vehicles or their privately
owned vehicles shall not be accomplished on site. Contractor vehicles shall have the company
name prominently displayed on both sides of the vehicle and be maintained to present a neat,
professional appearance. Contractor vehicles shall be used solely for the intended purpose of
performing services in this performance work statement during normal hours of operation. All
equipment used in the performance of this contract shall be in good operable condition and
carry a U/L (Underwriters Laboratory) listing. The equipment found to be unsafe and unable to
function as designed shall not be used in the performance of this contract. The CO or
Contracting Officer Representative (COR) may inspect the contractor’s equipment and vehicles
at any time and direct the removal of any unsafe or unusable equipment or vehicle from the
installation.
1.2 Scope of Work
The contractor shall provide personnel/labor according to the pricing sheet structure requested
in the final contract. The contractor shall provide management and administrative support to
their employees under this contract. Work under this PWS will support the mission of 341
Missile Wing at Malmstrom Air Force Base (main base only) by providing Outside and Inside
Plant cable installation, surveys, and maintenance. Work is limited to main base facilities only
and does not include remote or missile field sites. The Contractor shall perform this service in
accordance with (IAW) the Original Equipment Manufacturers’ (OEM) technical manuals and
specifications, Department of Defense (DoD) and US Air Force (AF) policy and regulations,
applicable federal, state, and local laws and regulations and industry standards, provided by
341CS at contractor’s request.
-- 1 of 14 --
2
1.2.1 Design/Engineer solutions as necessary for deliverables identified
• Ensure the solutions meet the requirements identified by the government.
• Ensure solutions comply with published standards identified in this document/contract.
1.2.2 Provide/Install Category 6 wiring from the nearest Communication Closet to the
location identified
• Route the installed cable using industry standard for proper cable management.
• Terminate the installed cable in the existing rack patch panel or provide and install a new
patch panel to accommodate the new requirement.
• Install the appropriate wall jack(s) and hardware and terminate the installed cable.
• CAT6 Cable rating (e.g., plenum, riser) and conduit requirements will be determined per
project IAW BICSI standards.
1.2.3 Provide/Install multimode fiber optic cable from the nearest Communication
Closet to the location identified
• Route the installed cable using industry standard for proper cable management.
• Terminate the installed cable in the existing rack patch panel or provide and install a new
patch panel to accommodate the new requirement.
• Install the appropriate wall jack(s) and hardware and terminate the installed cable.
• Fiber specifics (e.g., strand count, connector type, armored) are determined per project;
however, minimum fiber optic requirements are OM2 or better, with Single-Mode Fiber
(SMFO) for outside plant and Multi-Mode Fiber (MMFO) for inside plant.
1.2.4 Perform testing of all newly installed cable/equipment
• Perform end-to-end testing according to industry standards.
• Provide testing results to the 341CS/SCXP POC, Shannon Witt 406-731-2835.
• POC will confirm results with Infrastructure PWC.
• Tier I (OLTS) testing is the standard requirement. Tier II (OTDR) testing may be required and
will be identified per project.
1.2.5 Provide/Install new racks/cabinets
• Installation may consist of floor mount 2 post racks, floor mount enclosed cabinets, or wall
mount enclosed cabinets.
• Ensure racks are secured and proper grounding/bonding provided for all associated
hardware including cable management.
• Racks, vertical/horizontal managers, and bonding bars are furnished by the contractor as
needed per project.
1.2.6 Install fiber optic distribution panel
• Terminate associated fiber within the panel.
-- 2 of 14 --
3
• Ensure is secured and proper grounding/bonding provided for all associated hardware
including cable management.
1.2.7 Perform site survey to verify path availability/suitability for proposed outside
plant fiber expansion projects
• Identify unused fiber, if available, and mark as reserved for future projects per direction of
341CS/SCOW.
• If new fiber is to be installed, verify availability of duct space and or innerduct space.
• Verify path availability (rodding current duct/innerduct) to ensure additional cable can be
installed in existing Manhole/Duct System.
• Verify availability of Fiber Optic Distribution Panel space to terminate the new fiber.
• If required, verify patch panel capacity for installation of new cable.
• Site surveys are accounted for as distinct, separately priced items on the pre-priced pricing
sheet to guarantee compensation in the event a task is not accepted.
1.2.8 Provide/Install cable management hardware
• Ensure all installed cable management hardware (cable ladders, cable trays, rack hardware,
mounting hardware, etc.) complies with bonding/grounding industry standards for
communications equipment.
• Route all installed cables and secure to cable management hardware according to industry
standards for communications cable management.
• Mark all installed cables according to industry standards or the 341CS cable marking
standards.
• As-built drawings in digital PDF format are required upon completion of any Outside Plant
project.
1.2.9 Perform periodic mainte…