What this opportunity is

The U.S. Department of Agriculture is seeking a contractor for the roof replacement of Building 1 at the National Peanut Research Laboratory in Dawson, GA. This project falls under NAICS code 238160 and is set aside for total small businesses, making it suitable for small contractors. The notice type is a Combined Synopsis/Solicitation, indicating that interested parties should track the opportunity closely and prepare to submit proposals rather than simply expressing interest.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Building 1 Roof Replacement Design 100% SPECIFICATIONS A/E CONTRACT: 12405B21D0003 National Peanut Research Laboratory Dawson, GA Prepared For: U.S. DEPARTMENT OF AGRICULTURE Agricultural Research Service Prepared By: THE JOHNSON-McADAMS FIRM, P.A. Greenwood, Mississippi July 3, 2026 -- 1 of 226 -- -- 2 of 226 -- USDA B1 Roof Replacement 0626 PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 00 01 01/20 WARRANTY OF CONSTRUCTION 01 00 11 06/20 GENERAL PARAGRAPHS 01 00 21 01/20 CONTRACTOR QUALITY CONTROL 01 01 00 February 29, 2024 GENERAL REQUIREMENTS 01 33 00 04/06 SUBMITTAL PROCEDURES 01 35 26 01/20 GOVERNMENTAL SAFETY REQUIREMENTS 01 45 00 04/06 QUALITY CONTROL 01 50 00 04/06 TEMPORARY FACILITIES AND CONTROLS 01 57 50 10/19 TEMPORARY ENVIRONMENTAL CONTROLS 01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS 01 78 23 08/15 OPERATION AND MAINTENANCE DATA DIVISION 02 - EXISTING CONDITIONS 02 41 00 08/22 DEMOLITION DIVISION 03 - CONCRETE 03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE DIVISION 05 - METALS 05 51 00 08/23 METAL STAIRS DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 10 00 08/16, CHG 3: 05/25 ROUGH CARPENTRY DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 22 00 08/23 ROOF AND DECK INSULATION 07 52 00 08/25 MODIFIED BITUMINOUS MEMBRANE ROOFING 07 60 00 08/23, CHG 1: 05/25 FLASHING AND SHEET METAL 07 92 00 08/23 JOINT SEALANTS -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 1 -- 3 of 226 -- USDA B1 Roof Replacement 0626 THIS PAGE INTENTIONALLY LEFT BLANK PROJECT TABLE OF CONTENTS Page 2 -- 4 of 226 -- USDA B1 Roof Replacement 0626 SECTION 01 00 01 WARRANTY OF CONSTRUCTION 01/20 PART 1 GENERAL 1.1 WARRANTY OF CONSTRUCTION 1.1.1 General In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement. 1.1.2 Notification and Compliance The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage described in paragraph 1.1.1 above within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor. 1.2 EXPRESSED WARRANTY In addition to the other rights and remedies provided by this clause, all subcontractors', manufacturers', and suppliers' warranties expressed or implied, respecting any work and materials shall, at the direction of the Government, be enforced by the Contractor for the benefit of the Government. In such case, if the Contractor's warranty under paragraph 1.1.1 above has expired, any suit directed by the Government to enforce a subcontractor's, manufacturer's, or supplier's warranty shall be at the expense of the Government. The Contractor shall obtain any warranties which the subcontractors, manufacturers, or suppliers would give in normal commercial practice. If so directed by the Contracting Officer, the Contractor shall require any such warranties to be executed in writing to the Government. 1.3 LATENT DEFECTS The Warranty specified herein shall not limit the Government's rights with respect to latent defects, gross mistake, or fraud. SECTION 01 00 01 Page 1 -- 5 of 226 -- USDA B1 Roof Replacement 0626 PART 2 PRODUCTS Not used. PART 3 EXECUTION Not used. -- End of Section -- SECTION 01 00 01 Page 2 -- 6 of 226 -- USDA B1 Roof Replacement 0626 SECTION 01 00 11 GENERAL PARAGRAPHS 06/20 PART 1 GENERAL 1.1 DESCRIPTION OF WORK 1.1.1 Work To Be Done The work to be done consists of furnishing all labor, materials, and equipment and performing all work in strict accordance with these specifications for Building 1 Roof Replacement Design, National Peanut Research Laboratory in Dawson, Georgia. Bidder shall provide Base Bid pricing and Alternate pricing as defined in the contract documents. 1.1.2 Location The site of work is at the USDA National Peanut Research Laboratory in Dawson, Georgia. 1.1.3 Principal Features of Work The project contains a Base Bid and One Construction Bid Option as described below: Base Bid - The base bid consist of removal of an existing foamed-in-place roof system and all associated flashings down to the structural 3" tectum deck. Installation of a tapered insulation system with an adhesive applied modified bituminous roof system including all flashings, copings, roof drain inserts, and fall protection system. Bid option #1: Bid option #1 installs an open grate stair system from grade to the roof. 1.2 SITE VISIT USDA will conduct a single pre-bid site inspection for all interested contractors that will be coordinated with Hector Rodriguez . Contractor must be able to provide valid US or state photo ID and must be with USDA escort for access. Contact: U.S. Department of Agriculture, ARS Attn: Hector Rodriguez National Peanu

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238160)