Roof Replacement for USDA ARS in Dawson, GA (Amended)
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1232SA26Q0784
NAICS
238160
PSC
Z1JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 15, 2026
Response due
August 6, 2026
Place of performance
Dawson, GA
Description
Building 1 Roof Replacement
Design
100% SPECIFICATIONS
A/E CONTRACT: 12405B21D0003
National Peanut Research Laboratory
Dawson, GA
Prepared For:
U.S. DEPARTMENT OF AGRICULTURE
Agricultural Research Service
Prepared By:
THE JOHNSON-McADAMS FIRM, P.A.
Greenwood, Mississippi
July 3, 2026
-- 1 of 226 --
-- 2 of 226 --
USDA B1 Roof Replacement 0626
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 01 01/20 WARRANTY OF CONSTRUCTION
01 00 11 06/20 GENERAL PARAGRAPHS
01 00 21 01/20 CONTRACTOR QUALITY CONTROL
01 01 00 February 29, 2024 GENERAL REQUIREMENTS
01 33 00 04/06 SUBMITTAL PROCEDURES
01 35 26 01/20 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 04/06 QUALITY CONTROL
01 50 00 04/06 TEMPORARY FACILITIES AND CONTROLS
01 57 50 10/19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 51 00 08/23 METAL STAIRS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 3: 05/25 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00 08/23 ROOF AND DECK INSULATION
07 52 00 08/25 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 08/23, CHG 1: 05/25 FLASHING AND SHEET METAL
07 92 00 08/23 JOINT SEALANTS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
-- 3 of 226 --
USDA B1 Roof Replacement 0626
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
-- 4 of 226 --
USDA B1 Roof Replacement 0626
SECTION 01 00 01
WARRANTY OF CONSTRUCTION
01/20
PART 1 GENERAL
1.1 WARRANTY OF CONSTRUCTION
1.1.1 General
In addition to any other warranties set out elsewhere in this contract,
the Contractor warrants that work performed under this contract conforms
to the contract requirements and is free of any defect of equipment,
material or design furnished, or workmanship performed by the Contractor
or any of his subcontractors or suppliers at any tier. Such warranty
shall continue for a period of one year from the date of final acceptance
of the project. Under this warranty, the Contractor shall remedy at his
own expense any such failure to conform or any such defect. In addition,
the Contractor shall remedy at his own expense any damage to Government
owned or controlled real or personal property, when that damage is the
result of the Contractor's failure to conform to contract requirements or
any such defect of equipment, material, workmanship, or design. The
Contractor shall also restore any work damaged in fulfilling the terms of
this clause. The Contractor's warranty with respect to work repaired or
replaced hereunder will run for one year from the date of such repair or
replacement.
1.1.2 Notification and Compliance
The Government shall notify the Contractor in writing within a reasonable
time after the discovery of any failure, defect, or damage. Should the
Contractor fail to remedy any failure, defect, or damage described in
paragraph 1.1.1 above within a reasonable time after receipt of notice
thereof, the Government shall have the right to replace or repair and have
the cost billed to the Contractor.
1.2 EXPRESSED WARRANTY
In addition to the other rights and remedies provided by this clause, all
subcontractors', manufacturers', and suppliers' warranties expressed or
implied, respecting any work and materials shall, at the direction of the
Government, be enforced by the Contractor for the benefit of the
Government. In such case, if the Contractor's warranty under paragraph
1.1.1 above has expired, any suit directed by the Government to enforce a
subcontractor's, manufacturer's, or supplier's warranty shall be at the
expense of the Government. The Contractor shall obtain any warranties
which the subcontractors, manufacturers, or suppliers would give in normal
commercial practice. If so directed by the Contracting Officer, the
Contractor shall require any such warranties to be executed in writing to
the Government.
1.3 LATENT DEFECTS
The Warranty specified herein shall not limit the Government's rights with
respect to latent defects, gross mistake, or fraud.
SECTION 01 00 01 Page 1
-- 5 of 226 --
USDA B1 Roof Replacement 0626
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 00 01 Page 2
-- 6 of 226 --
USDA B1 Roof Replacement 0626
SECTION 01 00 11
GENERAL PARAGRAPHS
06/20
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.1.1 Work To Be Done
The work to be done consists of furnishing all labor, materials, and
equipment and performing all work in strict accordance with these
specifications for Building 1 Roof Replacement Design, National Peanut
Research Laboratory in Dawson, Georgia. Bidder shall provide Base Bid
pricing and Alternate pricing as defined in the contract documents.
1.1.2 Location
The site of work is at the USDA National Peanut Research Laboratory in
Dawson, Georgia.
1.1.3 Principal Features of Work
The project contains a Base Bid and One Construction Bid Option as
described below:
Base Bid - The base bid consist of removal of an existing
foamed-in-place roof system and all associated flashings down to the
structural 3" tectum deck. Installation of a tapered insulation
system with an adhesive applied modified bituminous roof system
including all flashings, copings, roof drain inserts, and fall
protection system.
Bid option #1:
Bid option #1 installs an open grate stair system from grade to the
roof.
1.2 SITE VISIT
USDA will conduct a single pre-bid site inspection for all interested
contractors that will be coordinated with Hector Rodriguez . Contractor
must be able to provide valid US or state photo ID and must be with USDA
escort for access.
Contact:
U.S. Department of Agriculture, ARS
Attn: Hector Rodriguez
National Peanu…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238160)
Office Roof Replacement Deer Creek Lake
DEPT OF DEFENSE · Solicitation · due August 3, 2026
Installation of roof sealant
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 6, 2026
USCG Station Siuslaw Roofing and Sheetrock Repair
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 28, 2026
Birch Creek Roofing Replacement
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 17, 2026
Z--ROOF REPLACEMENT FOR FIVE STRUCTURES ON ELLIOTT KEY AT BISCAYNE NATIONAL PARK
INTERIOR, DEPARTMENT OF THE · Presolicitation · due August 21, 2026
Seoul Chancery, Consular, IMOT, PCC, IPC, and ESO Outbuilding Roof Replacements
STATE, DEPARTMENT OF · Presolicitation · due July 27, 2026