Sector Field Office Fort Macon Fence Extension
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
70Z08126QELIZ0017
NAICS
238990
PSC
Z
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 24, 2026
Response due
August 14, 2026
Place of performance
Atlantic Beach, NC
Description
Scope of Work and Specifications
Sector Field Office Fort Macon Fence Extension Project
July 2026
Project COR
Name: Andrew Miller
Email: Andrew.L.Miller@uscg.mil
Command Security Officer
-- 1 of 11 --
1. Scope:
The objective of this project is to procure and install a secure, highly durable section
of security fencing at the northeast corner of Sector Field Office (SFO) Fort Macon,
where the installation adjoins Fort Macon State Park. The fencing solution must
successfully bridge the gap between the existing perimeter fence and the mean low
water line, ensuring installation security while withstanding a harsh, dynamic
marine environment.
The contractor shall propose and install a fencing solution that connects to the
preexisting perimeter fence line on the northeast corner of the installation. The new
fence section will run down the sandy beach and extend into the water to the mean
low water mark, covering an approximate total distance of 45 feet.
Rather than issuing a prescriptive, rigid design, the Government is providing this
statement of objectives (SOO) to allow industry experts to propose innovative,
durable, and cost-effective structural and marine engineering solutions that satisfy
the performance and security specifications outlined below.
2. Government Facilities and Utilities:
a. Electrical power is available on the site. The Contractor will be permitted to
utilize these utilities in performing the work, provided that the existing
systems are not overloaded.
b. Telephone services will not be available for use by the Contractor.
c. Building restroom facilities are not available for use.
d. The Contractor, their employees, and any sub-contractors shall become
familiar with and obey all SFO regulations. All personnel employed on the
project shall keep within the limits of the work area and shall not enter any
other area outside of the work site unless to do so in the performance of their
duties. Work site and execution must be arranged so as not to disrupt normal
operations in this area. There shall be No Smoking in any Coast Guard
building. All smoking must be done only in a designated smoking area.
3. Materials and Locations:
a. Materials shall be delivered to the jobsite in their original unopened
packages, clearly marked with the manufacturer’s name, brand name, and
description of contents. Storage shall be in accordance with manufacturers
recommendations in a clean, dry, well-ventilated area. Stored materials shall
be protected from sunlight and kept away from excessive heat. The
Contractor shall not store any highly flammable materials in the work area.
Sufficient area for staging is available on site; storage areas will be pre-
-- 2 of 11 --
approved by the Contracting Officer’s Representative (COR). Special
precautions shall be taken to ensure construction materials and debris do
not enter the waterway.
b. Laydown areas will be approved by the COR with coordination from the SFO
Environmental Compliance Office. Any damage to vegetated areas shall be
repaired and reseeded by the Contractor.
4. Labor Laws:
a. See Section 52.222 of the contract clauses for applicable labor
requirements, and the attached wage determination for prevailing rates that
must be paid to covered workers.
5. Safety:
a. The Contractor is wholly responsible for work site safety. The Contractor
shall implement a safety program that protects the lives and health of
personnel in the construction area, prevents damage to property, and avoids
work interruptions. The Contractor shall provide appropriate safety
barricades, signs, signal lights, etc. as well as complying with the
requirements of all federal safety regulations as published by the
Occupational Health and Safety Administration, 29 CFR 1910 (series), 29
CFR 1926 (series), State and Local safety laws, rules, and regulations. Any
operation defined as “Hot Work” as per OSHA/NFPA requires a permit to be
issued by SFO Facilities Engineering Officer. This includes welding, cutting,
brazing, grinding or any work that could produce sparks or heat and may
initiate a fire.
6. Environmental Compliance:
a. Environmental Discharges
i. Wastewater associated with any maintenance or repair shall be
quantified in a maintenance schedule. Nothing shall be discharged to
a storm drain at any time during the project. All spills shall be reported
to the COR.
b. Waste
i. Any waste as a result of the project shall either be recycled in
accordance with CIM 16455.10 or be disposed of in accordance with
the Resource Conservation and Recovery Act. Any Hazardous Waste
shall be manifested off site with SFO listed as the generator and
signatory. Any hazardous waste shall be analyzed, characterized,
-- 3 of 11 --
stored and disposed of in accordance with the Resource
Conservation and Recovery Act and all applicable federal, state and
local laws and ordinances.
c. Chemicals
i. All chemicals required for this project shall be preapproved by the
COR. All applicable Safety Data Sheets shall be provided to both the
COR. Proper storage shall be provided in accordance with 29 CFR
1910.1200. All installation related solid waste shall be removed from
SFO after each working day. All extra chemicals and products shall be
removed from the site upon work completion, as the Emergency
Planning and Community Right-To-Know Act requires Coast Guard to
maintain an inventory of all Hazardous Materials located at the site.
The Contractor is required to comply with local VOC laws and
regulations.
7. Liability of Contractor:
a. Any damage to government property caused by the Contractor shall be
repaired or replaced by the Contractor at no cost to the government. The
Contractor shall not disconnect any service without approval from the COR.
8. Existing Site Conditions:
a. The Contractor must satisfy themselves with the existing site conditions and
the work to be performed. All potential Contractors are strongly encouraged
to visit the site to field verify any/all quantities before submitting propos…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238990)
Furnish and Install Storm Shelters on Capehart Housing, Vance AFB, OK
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due September 2, 2026
Playground Installation, Edward MacDowell Lake, Peterborough, NH
DEPT OF DEFENSE · Solicitation · due August 4, 2026
Furnish and Install Storm Shelters on Capehart Housing, Vance AFB, OK
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due September 2, 2026
UAV Netting Enclosure For ANT Center
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 13, 2026
Sliding Gate Safety Deficiencies Remediation
STATE, DEPARTMENT OF · Solicitation · due August 27, 2026
Paver grouting project
STATE, DEPARTMENT OF · Solicitation · due August 14, 2026