What this opportunity is
The Department of Agriculture, Forest Service, is seeking a contractor to replace the well pump at the Tepee Work Center in the Black Hills National Forest, located in South Dakota. This project is set aside for total small businesses and requires a South Dakota licensed well driller or well pump installer. The notice type is a Combined Synopsis/Solicitation, indicating that interested parties should track the solicitation for updates, as it is not a formal bid. The project involves removing the existing submersible well pump, performing diagnostics, and installing a new 5HP submersible pump and controls.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
United States
Department of
Agriculture
Forest Service
Black Hills
National Forest
March 2026
Tepee Work
Center
Well Pump
Replacement
Specifications
Construction Documents
-- 1 of 29 --
TEPEE WORK CENTER
WELL PUMP REPLACEMENT
BLACK HILLS NATIONAL FOREST
001500-1
LIST OF DRAWINGS AND SPECIFICATIONS
SECTION 001500
LIST OF DRAWINGS AND SPECIFICATIONS
PART 1 – GENERAL
1.1 DESCRIPTION
A. List of Contract Specifications
1. Index of Specifications
DIVISION 1 – GENERAL REQUIREMENTS
Section 001500 List of Drawings and Specifications
Section 010150 General Requirements
Section 010250 Definition of Contract Items and Measurements and Payments
DIVISION 26 – ELECTRICAL
Section 260050 Electrical Materials and Methods
DIVISION 33 – UTILITIES
Section 331113 Potable Water Supply Wells
END OF SECTION 001500
-- 2 of 29 --
TEPEE WORK CENTER
WELL PUMP REPLACEMENT
BLACK HILLS NATIONAL FOREST
010150 – 1
GENERAL REQUIREMENTS
SECTION 010150
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK
1.1 DESCRIPTION
A. Work for this project requires the Contractor to be responsible for supplying all
labor, materials, equipment, miscellaneous items, freight, and delivery for the
following:
1. Remove existing submersible well pump. Perform diagnostics.
2. Provide and install new 5HP submersible pump and controls. Connect to existing
pumphouse.
B. This work shall be performed by a South Dakota licensed well driller or well pump
installer in accordance with South Dakota 46-6-9.2.
C. The work is identified in Division 1, Section 010250: Definition of Contract Items
and Measurement and Payment.
1.2 LOCATION
A. This project is located at the Black Hills National Forest Tepee Work Center located
19 miles west of Custer, SD on US16 at 10623 Tepee Work Center Loop, Edgemont,
SD 57735
1.3 GENERAL BUILDING INFORMATION
A. The Tepee Work Center Pumphouse
1. The Tepee Work Center Pumphouse is a 100 gross square foot (gsf) single level
building constructed in 1992.
1.4 EXISTING WELL AND PUMP INFORMATION
A. Tepee WC well is located immediately behind the pumphouse. The well pump is
currently set at 921 feet.
Manufacturer: Grundfos 10S50-48DS
Pump Motor: 5 HP 230V 3 wire
Control Box – 5 HP 230V
Installed 9/21/2020
1.5 SITE CONDITIONS AND WEATHER
A. The elevation of the site is approximately 5,138 feet above mean sea level.
-- 3 of 29 --
TEPEE WORK CENTER
WELL PUMP REPLACEMENT
BLACK HILLS NATIONAL FOREST
010150 – 2
GENERAL REQUIREMENTS
B. The site generally experiences moderate snowfalls beginning in October and November
and ending in March or April. The average temperature is 70 ℉ in July and 25° F in
February. The site is accessible year-round.
1.6 USE OF PREMISES
A. Normal Working Hours: The Contractor shall observe the following schedule which
determines normal and after normal working hours. Any work which falls outside the
definition provided below shall be considered after normal working hours and approval
by the CO shall be required.
1. Normal operating hours are 7:00 am to 5:00 pm Monday through Friday.
B. Use of Site: Confine constructions operations to immediate area of work. Do not disturb
portions of Project site beyond areas in which the Work is indicated.
C. Full Government Occupancy: Except as defined in “Work Restrictions” in this section,
the government will occupy the site and buildings during entire construction period.
Cooperate with Government during construction operations to minimize conflicts and
facilitate Government usage. Perform the Work so as not to interfere with Government
access to the site and buildings or with Government's day-to-day operations.
D. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances
serving premises clear and available to Government, Government's employees, and
emergency vehicles at all times. Do not use these areas for parking or storage of
materials. Do not close or obstruct walkways, corridors, or other occupied or used
facilities without written permission from Government.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of
materials and equipment on-site.
1.7 WORK RESTRICTIONS
A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet
(8 m) of entrances, operable windows, or outdoor air intakes.
B. Do not schedule work during holidays, weekends, or between 6:00 PM to 7:00 AM
without written approval from the Contracting Officer (CO).
C. Project Scheduling: Schedule work to minimize impacts to Government.
D. The CO will designate areas on the site for material storage. Confine storage of
materials to areas as approved by the CO.
1.8 CONTRACTOR’S RESPONSIBILITIES
A. Provide adequate signing and take necessary safety measures to protect the public
during all construction operations. Minimize disturbance of all undisturbed areas.
-- 4 of 29 --
TEPEE WORK CENTER
WELL PUMP REPLACEMENT
BLACK HILLS NATIONAL FOREST
010150 – 3
GENERAL REQUIREMENTS
B. Protect trees and vegetation within project area from damage.
C. Damage to areas adjacent to and/or within the project area that are not included as an
element of the project, including lawns and landscape features, shall be repaired by
the Contractor at no additional cost to the Government.
D. Coordination of Trades: Coordinate construction operations included in the various
sections of the Specifications to provide an efficient and orderly installation of each
part of the Work. Coordinate construction operations included under different
sections of the Specifications that depend on each other for proper installation,
connection or operation.
E. The Contractor shall furnish all equipment, materials, and supplies to perform the tasks
specified in this Contract.
F. All equipment used by the Contractor shall meet all safety requirements of this
Contract.
G. The Contractor shall provide Safety Data Sheets on cleaners, fluids, etc., and these
shall be ke…