Total Ground Maintenance at DMC, Italy

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W912PF26QA050
NAICS
561730
PSC
S208
Set-aside
No Set aside used
Posted
August 24, 2026
Response due
August 31, 2026
Place of performance
TIRRENIA, IT-PI

What this opportunity is

The Department of Defense is seeking ground maintenance services at the DMC in Italy, as outlined in the Performance Work Statement (PWS). This opportunity is not set aside for any specific business type, making it open to all interested contractors. The notice type is a solicitation, indicating that businesses should prepare to submit bids rather than simply tracking the opportunity. Companies should be prepared to demonstrate their quality control measures and compliance with contract specifications.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

i GROUND MAINTENANCE SERVICES PERFORMANCE WORK STATEMENT (PWS) USAG-ITALY - DMC REV#1 August 2026 -- 1 of 46 -- USAG ITALY – DMC Ground Maintenance Services Performance Work Statement (PWS) Table of Contents 1.0 General.................................................................................................................... 1 1.1 Description of Services/Introduction. ....................................................................... 1 1.2 Background. ............................................................................................................. 1 1.3 Objectives. ............................................................................................................... 1 1.4 Scope. ...................................................................................................................... 1 1.5 Reserved ................................................................................................................. 2 1.6 Traffic Flow. ............................................................................................................. 2 1.7 Restoration of Real Property Damage. .................................................................... 2 1.8 General Information. ................................................................................................ 2 1.8.1 Scope. ............................................................................................................... 2 1.8.1.1 Quality Control Plan (QCP). The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract. ....... 2 a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team. ............................................................................ 3 b. How will the Contractor monitor work to ensure that performance complies with all deliverables (etc. timelines, deadlines, and goals). .................................................... 3 c. How will the Contractor monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses. ........................... 3 d. How will the Contractor inventory and track maintenance of all Government Provided Equipment / Materials. ................................................................................. 3 e. How will the Contractor identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future. ....................................... 3 f. How will the Contractor file and save all Quality Control related documents for the life of the contract plus 5 years. .................................................................................. 3 1.8.2 Place of Performance ........................................................................................ 3 1.8.3 Recognized Holidays. ........................................................................................ 3 1.8.4 Hours of Operation. ........................................................................................... 3 1.8.5 Installation Closures. ......................................................................................... 3 1.8.6 Emergency Delays. ........................................................................................... 4 1.8.7 Unforeseen Closures of Service Areas. ............................................................ 4 1.8.8 Place of Performance. ....................................................................................... 4 1.8.9 Type of Contract. ............................................................................................... 4 1.8.10 Security Requirements. Reserved ................................................................... 4 1.8.11 Access and General Protection/Security Policy and Procedures. ................... 4 -- 2 of 46 -- USAG ITALY – DMC Ground Maintenance Services Performance Work Statement (PWS) 1.8.12 Physical Security. ............................................................................................ 4 1.8.13 Security Training.............................................................................................. 5 1.8.14 Anti-Terrorism (AT) Level I Training. ............................................................... 5 1.8.15 iWATCH Training............................................................................................. 5 1.8.16 Operational Security (OPSEC) Awareness Training. ...................................... 5 1.8.17 Threat Awareness and Reporting Program Training. ...................................... 6 1.8.18 Local Health Protection Conditions ................................................................. 6 1.8.19 Key Control. Reserved. ................................................................................... 6 1.8.20 Lost Keys. Reserved. ...................................................................................... 6 1.8.21 Prohibited use of Government provided keys or key cards. ............................ 6 1.8.22 Lock Combinations. Reserved ......................................................................... 6 1.8.23 Post Award Conference/Periodic Progress Meetings. ..................................... 6 1.9 Government Roles and Responsibilities. ................................................................. 7 1.9.1 Contracting Officer (KO). ................................................................................... 7 1.9.2 Contracting Officer’s Representative (COR). ..................................................... 7

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 561730)