What this opportunity is
The US Department of Agriculture's USFS Commercial Garage Door Repair Boulder RD is a Total Small Business Set-Aside opportunity, suitable for small businesses in the NAICS code 811210 (Repair and Maintenance Services). The government is purchasing commercial garage door repair services for the Boulder Ranger District in Colorado, including servicing, repairing, and replacing various parts of the garage doors. This is a Combined Synopsis/Solicitation, indicating that interested parties should track the notice for updates rather than preparing a bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
US Department of Agriculture (USDA)
Statement of Work
-- 1 of 6 --
2
Contents
Project ..................................................................................................................................................................... 3
General Information ................................................................................................................................................ 3
1.0 Scope of Work ............................................................................................................................................ 3
2.0 Background .................................................................................................................................................... 3
3.0 Technical Requirements / Tasks .................................................................................................................... 3
4.0 Government Furnished .................................................................................................................................. 5
5.0 Deliverables / Schedule ................................................................................................................................. 5
6.0 Travel ............................................................................................................................................................. 6
7.0 Contractor’s Key Personnel ........................................................................................................................... 6
8.0 Security Requirements ................................................................................................................................... 6
9.0 Data Rights .................................................................................................................................................... 6
10.0 Section 508 – Electronic and Information Technology Standards .............................................................. 6
Attachment........................................................................................................................................................... 6
-- 2 of 6 --
3
Project
Boulder Ranger District
Nederland Garage Door Repair
General Information
1.0 Scope of Work
The Boulder Ranger District needs servicing, repairing and replacing of various parts their commercial garage
doors. This work includes, but is not limited to, the following:
- Full commercial garage door hardware overhaul to restore function, safety, and longevity.
o Servicing all barrels and hoods, replacing springs and other associated hardware, and completing
a full system test ensuring 100% functionality of all six garage doors.
o Existing garage doors are to remain.
- Removal and replacement of five industrial duty hoist operators.
- Installation of five commercial grade infrared safety sensor systems.
- There are (4) 10’x10 doors, (1) 8’x8’ internal door, and (1) 12’x12’ door.
2.0 Background
The Nederland Work Center Engine Bay is located in Nederland, CO. There are various existing garage door
components that are not functioning properly and need servicing, repairing, and/or replacing.
3.0 Technical Requirements / Tasks
The contractor shall install the garage doors components according to State and Federal laws and regulations.
All work must occur between 0800-1700, Monday through Friday, and no work shall occur on weekends or
Federal holidays.
Contractor must ensure that they do not interfere with U.S. Forest Service fire operations and personnel, which
may occur in the work area. Contractor must allow Forest Service personnel, engines and equipment to come
and go at any given moment. Contractor must submit a proposed plan on how they will allow Fire operations to
continue during construction.
Contractor must ensure that doors do not remain open after working hours and can be secured.
Definition of Pay Items:
Base Items (BI):
1. Base Item No. 1 – Mobilization
a. This base item consists of all preparatory work and operations necessary for the movement
of personnel, equipment, supplies, and incidentals to the project site, and for all other work
and operations that must be performed or that cause costs to be incurred prior to beginning
work on the various items on the project site. This base item applies to work included in
the base items only.
b. Warranties are required for all materials, parts, and labor for a 1 year min.
c. Payment shall be made at the contract lump-sum price.
2. Base Item No. 2 – Full Servicing (Repairing and Replacing) of Barrel and Hood Components
a. This base item includes the repair of six (6) barrels and hoods, and all associated hardware,
including disassembly, spring removal replacement and installation, fine-tuning bearings and end
guides, removal of existing safety edges and associated parts (to be replaced with photo eye
sensors), full re-assembly back onto existing doors, and performance of a full system test to
ensure 100% functionality. Existing garage doors are to remain.
b. There are (4) 10’x10 doors, (1) 8’x8’ door, and (1) 12’x12’ door.
c. This base item consists of all materials, personnel, labor, equipment, hardware, and supplies to
ensure 100% functionality of the interface between garage door operations and barrel and hood
-- 3 of 6 --
4
components.
d. All removed associated parts from this line item must be hauled off-site to a state-approved
Landfill or recycled.
e. Payment shall be made for each servicing of barrel and hood components. All work necessary to
ensure 100% functionality of the garage door/barrel and hood interface are incidental to this line
item.
3. Base Item No. 3 – Removal and Replacement of Industrial Duty Hoist Operators
a. This base item includes the removal and replacement of five (5) industrial duty hoist operators,
including the performance of a full system test to ensure 100% functionality. All newly installed
hoist operators must be bolted through the total thi…