Description
Vault door replacement-B4215-2DLAAD
MCAS CHERRY POINT, NORTH CAROLINA 28533-0006
WORK ORDER #7488168
1.1 GENERAL INTENTION
The work includes replacing a vault door and frame and
incidental related work.
1.2 LOCATION
The work is located at MCAS Cherry Point, approximately as
indicated. The exact location will be shown by the Contracting
Officer.
1.3 DETAILED REQUIREMENTS.
The CTR shall barricade off the work area prior to commencement
of work.
The CTR shall remove existing vault door and frame in a manner
to cause the least amount of damage possible to the surrounding
wall.
Once the door and frame are removed the CTR shall dispose of
them off MCAS property.
The CTR shall replace the door and frame with like and kind to
existing or better GSA certified Class 5-A armory vault door
with a day gate, fitted with an FF-L-2937 mechanical
combination lock and be resistant to 30 man-minutes covert
entry and 10 man-minutes forced entry the door shall meet
Federal Specification AA-D-600D.
Clear all debris and foreign matter from around the opening,
both on the wall and floor.
Install the door to meet manufacturer recommended
specifications.
Once the door install is complete the CTR shall install the day
gate to meet manufacturer recommended specifications.
Once all is installed, the vault door and day gate shall be
tested multiple times for correct operation to include opening
-- 1 of 15 --
and closing, locking/ unlocking, and confirm the interior
emergency latch is functioning properly.
Once the install is complete the CTR shall, dispose of all
materials, trash, and debris, off MCAS Cherry Point property.
The CTR shall coordinate with the Contracting officer to have
the door inspected by a GSA authorized inspector.
Prior to leaving site, contractor shall conduct site cleanup
and return area to its original condition. After Inspection and
approval, turn all paperwork into the Contracting Officers
Representative.
1.4 SPECIAL SCHEDULING REQUIREMENTS
Have materials, equipment, and personnel required to perform
the work at the site prior to the commencement of the work.
The building will remain in operation during the entire
construction period. The Contractor must conduct his
operations so as to cause the least possible interference with
normal operations of the activity.
Permission to interrupt any activity roads, railroads, or
utility service must be requested in writing a minimum of 15
calendar days prior to the desired date of interruption and in
accordance with section 1.10.
1.5 CONTRACTOR ACCESS AND USE OF PREMISES
1.5.1 ACTIVITY REGULATIONS
Ensure that Contractor personnel employed on the Activity
become familiar with and obey Activity regulations including
safety, fire, traffic and security regulations. Keep within
the limits of the work and avenues of ingress and egress. Wear
hard hats in designated areas. Do not enter any restricted
areas unless required to do so and until cleared for such
entry. Mark Contractor equipment for identification.
1.5.1.1 SUBCONTRACTORS AND PERSONNEL CONTACTS
Provide a list of contact personnel of the Contractor and
subcontractors including addresses and telephone numbers for
use in the event of an emergency. As changes occur and
-- 2 of 15 --
additional information becomes available, correct and change
the information contained in previous lists.
1.5.1.2 ADDITIONAL PERSONNEL REQUIREMENTS
1.5.1.2.1 GENERAL CONSTRUCTION
General construction of the secure area must be performed by
U.S. firms using U.S. citizens. General construction includes
construction activities such as building site work, utilities,
foundations, structure, and enclosure or shell, including
doors, windows and façade work. Utility work that penetrates
the secure area and installation of doors in these areas are
not general construction.
1.5.1.2.2 FINISH WORK
Section left blank intentionally
1.5.1.2.3 ELECTRONIC SECURITY SYSTEMS EQUIPMENT
Section left blank intentionally
1.5.1.3 INSTALLATION ACCESS
Obtain access to Navy and Marine Corps installations through
participation in the Defense Biometrics Identification System
(DBIDS). Requirements for Contractor employee registration,
and transition for employees currently under Navy Commercial
Access Control System (NCACS), are available at
https://www.cnic.navy.mil/om/dbids.html. No fees are
associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor
personnel may apply for One-Day Passes at the Base Visitor
Control Office to access an installation.
1.5.1.3.1 REGISTRATION FOR DBIDS
Registration for DBIDS is available at
https://www.cnic.navy.mil/Operations-and-Management/Base-
Support/DBIDS/. Procedure includes:
a. Present a letter or official award document (i.e. DD Form
1155 or SF 1442) from the Contracting Officer that provides
the purpose for access to the Base Visitor Control Center
representative.
-- 3 of 15 --
b. Present valid identification, such as a passport or Real
ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the Base Visitor
Control Center representative to obtain a background check.
This form is available for download at
https://www.cnic.navy.mil/Operations-and-Management/Base-
Support/DBIDS/.
d. Upon successful completion of the background check, the
Government will complete the DBIDS enrollment process, which
includes Contractor employee photo, finger prints, base
restriction and several other assessments.
e. Upon successful completion of the enrollment process, the
Contractor employee will be issued a DBIDS credential, and
will be allowed to proceed to worksite.
1.5.1.3.2 DBIDS ELIGIBILITY REQUIREMENTS
Throughout the length of the contract, the Contractor employee
must continue to meet background screen standards. Periodic
background screenings are conducted to verify continued DBIDS
participation and installation access privileges. DBIDS access
privileges will be immediately suspended or revoked if at any
time a Contractor employee becomes ineligib…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 28, 2026
402-23-794 Modernize Campus Corridors
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 31, 2026
ZION-EAST ENTRANCE STATION REHAB
INTERIOR, DEPARTMENT OF THE · Solicitation · due September 15, 2026
Provide Roll Up Door B4305
DEPT OF DEFENSE · Solicitation · due September 10, 2026
Building 36000 2nd Floor Reconfiguration to Conference Space
DEPT OF DEFENSE · Solicitation · due September 3, 2026
Y1DZ--556-24-122 B132 Pool and HVAC Replacement
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due September 3, 2026