What this opportunity is
The Department of Veterans Affairs is soliciting bids for the replacement of main electrical distribution equipment at the Lexington VAHCS Troy Bowling Campus in Lexington, Kentucky. This project is classified under NAICS code 236220, which covers commercial and industrial building construction. The solicitation is open to all businesses, with no specific set-aside for small businesses or other groups. Bidders should track the solicitation, as it is not a set-aside opportunity, and should review the detailed specifications and bid documents carefully.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Replace Main Electrical
Distribution Equipment
Project Number: 596A4-24-101
Bid Documents
Specifications
Northeast Infrastructure, LLC
34 Brown Street
Honesdale, PA 18431
October 29, 2025
Lexington VAHCS
Troy Bowling Campus
1101 Veterans Dr.
Lexington, KY 40502
-- 1 of 768 --
THIS PAGE IS INTENTIONALLY LEFT BLANK
-- 2 of 768 --
Replace Main Electrical Distribution Equipment
Project No. 596A4-24-101 Bid Documents
Troy Bowling Campus, Lexington, KY 10-29-2025
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 17.00 20 Cost-Loaded Network Analysis Schedule 01-24
01 33 23 Shop Drawings, Product Data, and Samples 11-23
01 35 26 Safety Requirements for Major Projects 05-24
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 74 19 Construction Waste Management 04-22
01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 12-23
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
(NOT USED)
DIVISION 05 – METALS
(NOT USED)
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
(NOT USED)
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
-- 3 of 768 --
Replace Main Electrical Distribution Equipment
Project No. 596A4-24-101 Bid Documents
Troy Bowling Campus, Lexington, KY 10-29-2025
00 01 10 - 2
SECTION NO DIVISION AND SECTION TITLES DATE
08 71 00 Door Hardware 03-24
DIVISION 09 – FINISHES
(NOT USED)
DIVISION 10 – SPECIALTIES
(NOT USED)
DIVISION 11 – EQUIPMENT
(NOT USED)
DIVISION 12 – FURNISHINGS
(NOT USED)
DIVISION 13 - SPECIAL CONSTRUCTION
(NOT USED)
DIVISION 14– CONVEYING EQUIPEMENT
(NOT USED)
DIVISION 21- FIRE SUPPRESSION
(NOT USED)
DIVISION 22 – PLUMBING
(NOT USED)
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23
23 08 00 Commissioning of HVAC Systems 03-23
23 09 23 Direct-Digital Control System for HVAC 03-23
23 31 00 HVAC Ducts and Casings 03-23
23 84 00 Humidity Control Equipment 03-24
DIVISION 25 – INTEGRATED AUTOMATION
(NOT USED)
-- 4 of 768 --
Replace Main Electrical Distribution Equipment
Project No. 596A4-24-101 Bid Documents
Troy Bowling Campus, Lexington, KY 10-29-2025
00 01 10 - 3
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 13 Medium-Voltage Cables 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 05 41 Underground Electrical Construction 11-22
26 05 73 Overcurrent Protective Device Coordination Study 11-22
26 08 00 Commissioning of Electrical Systems 11-22
26 11 16 Secondary Unit Substations 11-22
26 13 13 Medium-Voltage Circuit Breaker Switchgear 11-22
26 13 16 Medium-Voltage Fusible Interrupter Switches 11-22
26 24 13 Distribution Switchboards 11-22
26 24 16 Panelboards 11-22
26 29 21 Enclosed Switches and Circuit Breakers 11-22
26 43 13 Surge Protective Devices 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 08 00 Commissioning of Communications Systems 11-16
27 10 00 Control, Communication and Signal Wiring 06-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 08 00 Commissioning of Electronic Safety and Security
Systems
11-16
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11
DIVISION 31 – EARTHWORK
(NOT USED)
DIVISION 32 – EXTERIOR IMPROVEMENTS
(NOT USED)
-- 5 of 768 --
Replace Main Electrical Distribution Equipment
Project No. 596A4-24-101 Bid Documents
Troy Bowling Campus, Lexington, KY 10-29-2025
00 01 10 - 4
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 33 – UTILITIES
(NOT USED)
DIVISION 34 – TRANSPORTATION
(NOT USED)
DIVISION 48 – Electrical Power Generation
(NOT USED)
-- 6 of 768 --
Replace Main Electrical Distribution Equipment
Project No. 596A4-24-101 Bid Documents
Troy Bowling Campus, Lexington, KY 10-29-2025
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the
contract.
Drawing No. Title
GENERAL:
GI-001 COVER SHEET
GI-002 CAMPUS SITE PLAN
GC-001 LOW VOLTAGE EXISTING CONDITIONS AND PHASING
PLAN 1
GC-002 LOW VOLTAGE PHASING PLANS 2 AND 3
GC-003 LOW VOLTAGE PHASING PLANS 4 AND 5
GC-004 TOWER BUILDING MVSG EXISTING CONDITIONS AND
PHASING PLAN 1
GC-005 TOWER BUILDING MVSG PHASING PLANS 2 AND 3
GC-006 TOWER BUILDING MVSG PHASING PLANS 4, 5, AND 6
GC-007 TOWER BUILDING LVSG EXISTING CONDITIONS AND
PHASING PLAN 1
GC-008 TOWER BUILDING LVSG PHASING PLANS 2 AND 3
GC-009 TOWER BUILDING LVSG PHASING PLANS 4 AND 5
GC-010 BUILDING 4 MEZZANINE EXISTING CONDITIONS AND
PHASING PLAN 1
GC-011 BUILDING 4 MEZZANINE PHASING PLANS 2 AND 3
GC-012 BUILDING 4 MEZZANINE PHASING PLANS 4 AND 5
GC-013 BUILDING 4 MEZZANINE PHASING PLANS 6 AND 7
ICRA:
ICRA-01 ICRA GENERAL REQUIREMENTS
ARCHITECTURAL:
A-001 ARCHITECTURAL NOTES, SYMBOLS & ABBREVIATIONS
AD-100 BUILDING 1 GROUND FLOOR ENLARGED ARCHITECTURAL…
Source: SAM.gov, as posted. Verify the current solicitation before responding.