Showing award actions 51–87 of 87 funded award actions, most recent first.

Contracts with positive obligations
15
Funded award actions shown
87
Obligations shown
$219M
Awarding agencies
3

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of July 10, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Nov 7, 2023Department of DefenseW074 ENDIST MOBILEW9127821C0029236220SPECIAL PURPOSE REFUELER VEHICLE MAINTENANCE FACILITY$246K
Sep 29, 2023Department of DefenseW074 ENDIST SAVANNAHW912HN23C4005236220CONSTRUCTION - PLEASE SEE CLIN SCHEDULE$19M
Sep 26, 2023Department of DefenseW074 ENDIST SAVANNAHW912HN23C4004236220ST-22092-3P GEORGIA POWER$30M
Sep 8, 2023Department of DefenseW074 ENDIST SAVANNAHW912HN22C4007236220REPAIR CONSTRUCTION WORK (BLDG. H4445)$199K
Aug 29, 2023Department of DefenseW074 ENDIST SAVANNAHW912HN22C4007236220REPAIR CONSTRUCTION WORK (BLDG. H4445)$172K
Aug 24, 2023Department of DefenseW074 ENDIST SAVANNAHW912HN23C3003236220CONSTRUCT BREAKROOM AND ADMIN AREA$12M
Aug 17, 2023Department of DefenseW074 ENDIST MOBILEW9127821C0029236220SPECIAL PURPOSE REFUELER VEHICLE MAINTENANCE FACILITY$48K
Jul 12, 2023Department of DefenseW074 ENDIST SAVANNAHW912HN22C4007236220REPAIR CONSTRUCTION WORK (BLDG. H4445)$1.5M
Jun 16, 2023Department of DefenseW074 ENDIST WILMINGTONW912PM22C0006236220PRIMARY FACILITY, RENOVATE BLDG 3-1947, SC-00008-20 AT FORT BRAGG IN NORTH CAROLINA (USACE WILMINGTON CONTRACTING)$60K
Mar 28, 2023Department of DefenseW074 ENDIST WILMINGTONW912PM22C0006236220PRIMARY FACILITY, RENOVATE BLDG 3-1947, SC-00008-20 AT FORT BRAGG IN NORTH CAROLINA (USACE WILMINGTON CONTRACTING)$79K
Mar 21, 2023Department of LaborDOL - JCAS - AEC1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$5.0M
Sep 30, 2022Department of DefenseW074 ENDIST MOBILEW9127821C0029236220SPECIAL PURPOSE REFUELER VEHICLE MAINTENANCE FACILITY$262K
Sep 28, 2022Department of DefenseW074 ENDIST SAVANNAHW912HN22C4007236220REPAIR CONSTRUCTION WORK (BLDG. H4445)$20M
Sep 23, 2022Department of DefenseW074 ENDIST SAVANNAHW912HN22C3003236220RENOVATION OF THE FACILITY .$23M
Jul 8, 2022Department of DefenseW074 ENDIST MOBILEW9127821C0029236220SPECIAL PURPOSE REFUELER VEHICLE MAINTENANCE FACILITY$236K
Jun 30, 2022Department of DefenseW074 ENDIST WILMINGTONW912PM22C0006236220PRIMARY FACILITY, RENOVATE BLDG 3-1947, SC-00008-20 AT FORT BRAGG IN NORTH CAROLINA (USACE WILMINGTON CONTRACTING)$6.5M
Feb 24, 2022Department of DefenseW074 ENDIST WILMINGTONW912PM18C0015236220BUILDING CONSTRUCTION: PN SOF BATTALION ADMINISTRATION FACILITY$32K
Jan 12, 2022Department of DefenseW074 ENDIST MOBILEW9127821C0029236220SPECIAL PURPOSE REFUELER VEHICLE MAINTENANCE FACILITY$209K
Aug 13, 2021Department of DefenseW074 ENDIST MOBILEW9127821C0029236220SPECIAL PURPOSE REFUELER VEHICLE MAINTENANCE FACILITY$8.0M
Jun 1, 2021Department of LaborDOL - JCAS - AEC1605AE21P00001236220ATLANTA JCC (1630DC-17-C_0024) -PROJECT 1046 4K GLOBAL/ACC JV GLOBAL SETTLEMENT OF ALL MONETARY CLAIMS ADD $3,500,000.00 - NO ADDITIONAL DAYS REQUIRED$3.5M
Aug 25, 2020Department of DefenseW074 ENDIST WILMINGTONW912PM18C0015236220BUILDING CONSTRUCTION: PN SOF BATTALION ADMINISTRATION FACILITY$79K
Jul 15, 2020Department of DefenseW074 ENDIST WILMINGTONW912PM18C0015236220BUILDING CONSTRUCTION: PN SOF BATTALION ADMINISTRATION FACILITY$2.3M
Mar 16, 2020Department of DefenseW074 ENDIST WILMINGTONW912PM18C0015236220BUILDING CONSTRUCTION: PN SOF BATTALION ADMINISTRATION FACILITY$35K
Mar 5, 2020Department of DefenseW074 ENDIST WILMINGTONW912PM18C0015236220BUILDING CONSTRUCTION: PN SOF BATTALION ADMINISTRATION FACILITY$120K
Dec 6, 2019Department of DefenseW074 ENDIST WILMINGTONW912PM18C0015236220BUILDING CONSTRUCTION: PN SOF BATTALION ADMINISTRATION FACILITY$44K
Jun 24, 2019Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$1.5M
Feb 11, 2019Department of DefenseW074 ENDIST WILMINGTONW912PM18C0015236220BUILDING CONSTRUCTION: PN SOF BATTALION ADMINISTRATION FACILITY$9K
Sep 27, 2018Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$30K
Sep 26, 2018Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$273K
Sep 18, 2018Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$974
Aug 27, 2018Department of DefenseW074 ENDIST WILMINGTONW912PM18C0015236220BUILDING CONSTRUCTION: PN SOF BATTALION ADMINISTRATION FACILITY$12M
Aug 7, 2018Department of the InteriorBUREAU OF INDIAN AFFAIRS140A1618F0051236220CONSTRUCTION CONTRACT FOR NMACC IDIQ 2$25K
Aug 3, 2018Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$30K
Jun 5, 2018Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$325K
Apr 9, 2018Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$46K
Dec 13, 2017Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$17K
Jun 16, 2017Department of LaborDOL (ETA) OFC OF CONTRACT MGMT1630DC17C0024236220IGF::CL,CT::IGF THIS PROJECT IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW JOB CORPS CAMPUS TO REPLACE THE EXISTING JOB CORPS CENTER LOCATED IN ATLANTA, GA. THE NEW CAMPUS IS COMPRISED OF APPROXIMATELY 25 ACRES AT THE AFOREMENTIONED LOCATION, AND THE WORK CONSISTS OF THE FOLLOWING: CLEARING, REGARDING, AND PREPARATION OF THE EXISTING SITE, WHICH IS CURRENTLY WOODED. PLACEMENT OF ALL UTILITIES REQUIRED TO SERVE THE BUILDINGS, IN ADDITION TO COORDINATION WITH VARIOUS UTILITIES TO TIE INTO EXISTING SERVICES, AND WITH GEORGIA POWER FOR COORDINATION OF PLACEMENT OF THE PRIMARY ELECTRICAL SYSTEM AND SITE LIGHTING. CONSTRUCTION OF THE SURFACE SITE WORK WILL INCLUDE INSTALLATION OF ALL FENCING, GATES, ROADS, WALKS, LANDSCAPING, AND GRASSED AREAS, IN ADDITION TO CONSTRUCTION OF STORM WATER MANAGEMENT PONDS AND BIO RETENTION AREAS.$60M