Federal Contractor Profile
Abba Construction, INC.
$114M obligated·104 awards·2 agencies·2 NAICS
Federal Contracts
Showing contracts 101–150 of 151 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Feb 25, 2019 | Department of DefenseW7M2 USPFO ACTIVITY FL ARNG | W911YN19C0002 | 236220 | CONSTRUCTION OF PROJECTS NVZR062031 AND NVZR132003, 290TH JCSS, MACDILL AFB, TAMPA, FL. PROJECTS ARE SUSTAINMENT, RESTORATION AND MODERNIZATION (SRM). PROJECT NVZR NVZR062031 REPAIR JCSS RESERVE FORCES BUILDING 1885 AND NVZR132003 REPAIR JCSS VEHICLE MAINTENANCE BUILDING 1886, LOCATED AT THE 290TH JCSS, MACDILL AFB, TAMPA, FL. PROJECT NVZR062031 WORK INCLUDES A PRECONSTRUCTION BUILDING SURVEY FOR ASBESTOS-CONTAINING MATERIALS; SELECTIVE DEMOLITION OF EXTERIOR WINDOWS AND SITE ELEMENTS, INTERIOR WALLS, FLOOR AND WALL FINISHES, DOORS, MILLWORK, FIXTURES, FURNISHINGS, EQUIPMENT, MECHANICAL SYSTEMS, ELECTRICAL SECONDARY SYSTEMS AND LIGHTING, AND FIRE SPRINKLER SYSTEMS. MODIFICATIONS TO EXISTING UNDERGROUND UTILITIES AND PAVEMENT REPLACEMENT. COMPLETE DEMOLITION OF EXISTING LOW SLOPED ROOFING ASSEMBLY AND RELATED ITEMS. CONSTRUCTION OF NEW DOUBLE PITCHED HIGH SLOPE METAL STANDING SEAM ROOF ON NEW PURLIN FRAMING SET ON THE EXISTING LOW SLOPE ROOF DECK, WITH GUTTERS, DOWNSPOUTS, ROOF HATCH AND OTHER ACCESSORIES. CONSTRUCTION OF NEW EXTERIOR STOREFRONT ASSEMBLIES AND WALL INFILL, NEW EXTERIOR PEDESTRIAN ACCESSIBLE RAMP AND RETAINING WALL. NEW INTERIOR WALLS, NEW DOORS, NEW INTERIOR WINDOWS, NEW OPERABLE WALL SYSTEM, NEW TOILET AND LOCKER ROOMS, NEW FLOOR AND WALL FINISHES; NEW MECHANICAL SYSTEMS; NEW INTERIOR PLUMBING SYSTEMS CONNECTED TO EXISTING SITE UTILITIES; NEW AREAS OF ELECTRICAL SECONDARY SYSTEMS, LIGHTING, AND EMERGENCY LIGHTING; NEW WET PIPE FIRE SPRINKLER SYSTEM; AND INCIDENTAL RELATED WORK. PROJECT NVZR132003 WORK INCLUDES A PRECONSTRUCTION BUILDING SURVEY FOR ASBESTOS-CONTAINING MATERIALS; SELECTIVE DEMOLITION OF PORTIONS OF INTERIOR WALLS, FLOOR AND WALL FINISHES, DOORS, MILLWORK, FIXTURES, FURNISHINGS, EQUIPMENT, MECHANICAL SYSTEMS, ELECTRICAL SECONDARY SYSTEMS, LIGHTING, AND DEVICES, AND FIRE SPRINKLER SYSTEMS. COMPLETE DEMOLITION OF EXISTING LOW SLOPED ROOFING ASSEMBLY AND RELATED ITEMS. CONSTRUCTION OF NEW DOUBLE PITCHED HIGH SLOPE METAL STANDING SEAM ROOF ON NEW PURLIN FRAMING SET ON THE EXISTING LOW SLOPE ROOF DECK, WITH GUTTERS, DOWNSPOUTS, ROOF HATCH AND OTHER ACCESSORIES. CONSTRUCTION OF NEW INTERIOR WALLS, NEW DOORS, NEW TOILET AND LOCKER ROOMS, NEW FLOOR AND WALL FINISHES. NEW MECHANICAL SYSTEMS; NEW INTERIOR PLUMBING SYSTEMS CONNECTED TO EXISTING SITE UTILITIES; NEW AREAS OF ELECTRICAL SECONDARY SYSTEMS, LIGHTING, EMERGENCY LIGHTING, AND DEVICES; NEW WET PIPE FIRE SPRINKLER SYSTEM; AND INCIDENTAL RELATED WORK. | $6.2M |
| Feb 1, 2019 | Department of DefenseFA4814 6 CONS PK | FA481417FM411 | 236220 | IGF::OT::IGF NVZR 16-0093 RPR B55 | $38K |
| Jan 14, 2019 | Department of DefenseFA4814 6 CONS PK | 0006 | 236220 | IGF::OT::IGF DEMO/CONSOL VEHICLE OPS, B52 | $75K |
| Jan 7, 2019 | Department of DefenseFA4814 6 CONS PK | FA481417FM401 | 236220 | IGF::OT::IGF H5 WINDOWS&SIDING | $30K |
| Nov 19, 2018 | Department of DefenseFA4814 6 CONS PK | FA481418FM403 | 236220 | REPAIR ALERT FACILITY ROOF, BUILDING 1105 | $358K |
| Oct 26, 2018 | Department of DefenseW7M2 USPFO ACTIVITY FL ARNG | W911YN19C0001 | 236220 | MILITARY CONSTRUCTION PROJECT NUMBER LSGA019179, TITLE REPLACE FIRE CRASH-RESCUE STATION, 125TH FIGHTER WING, JACKSONVILLE, FL | $6.1M |
| Oct 25, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM407 | 236220 | IGF::OT::IGF REPAIR NVZR 16-0028 COMMAND POST, B54. | $10K |
| Sep 4, 2018 | Department of DefenseFA4814 6 CONS PK | FA481418FM405 | 236220 | NVZR 17-0061 REPAIR HVAC CENTCOM B3541 | $1.6M |
| Aug 28, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM411 | 236220 | IGF::OT::IGF NVZR 16-0093 RPR B55 | $12K |
| Aug 27, 2018 | Department of DefenseFA4814 6 CONS PK | FA481418FM402 | 236220 | REPAIR DCC ROOF AT BUILDING 359 | $1K |
| Aug 23, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM411 | 236220 | IGF::OT::IGF NVZR 16-0093 RPR B55 | $7K |
| Jul 13, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM402 | 236220 | IGF::OT::IGF CONSTRUCT STORM WATER MANAGEMENT SYSTEMS FAC 1241 | $37K |
| Jul 13, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM405 | 236220 | IGF::OT::IGF NVZR 16-0087 RPR H4 FOR ADDITIONAL KC-135'S | $17K |
| Jul 11, 2018 | Department of DefenseFA4814 6 CONS PK | FA481418FM402 | 236220 | REPAIR DCC ROOF AT BUILDING 359 | $423K |
| Jul 10, 2018 | Department of DefenseFA4814 6 CONS PK | FA481418FM407 | 236220 | 17-0106 REPAIR FLAT ROOFS&GUTTERS MULTIPLE FACILITIES. | $287K |
| Jun 13, 2018 | Department of DefenseFA4814 6 CONS PK | FA481418FM404 | 236220 | 17-0101 SOCCENT BLDG 1066 REPAIR | $468K |
| Jun 6, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM407 | 236220 | IGF::OT::IGF REPAIR NVZR 16-0028 COMMAND POST, B54. | $3K |
| Jun 1, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM405 | 236220 | IGF::OT::IGF NVZR 16-0087 RPR H4 FOR ADDITIONAL KC-135'S | $6K |
| Apr 30, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM405 | 236220 | IGF::OT::IGF NVZR 16-0087 RPR H4 FOR ADDITIONAL KC-135'S | $79K |
| Apr 26, 2018 | Department of DefenseFA4814 6 CONS PK | FA481418FM403 | 236220 | REPAIR ALERT FACILITY ROOF, BUILDING 1105 | $358K |
| Apr 19, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM411 | 236220 | IGF::OT::IGF NVZR 16-0093 RPR B55 | $9K |
| Mar 30, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM405 | 236220 | IGF::OT::IGF NVZR 16-0087 RPR H4 FOR ADDITIONAL KC-135'S | $28K |
| Mar 8, 2018 | Department of DefenseFA4814 6 CONS PK | FA481417FM411 | 236220 | IGF::OT::IGF NVZR 16-0093 RPR B55 | $50K |
| Feb 8, 2018 | Department of DefenseFA4814 6 CONS PK | FA481418FM401 | 236220 | NVZR 16-0132 RPR TAXIWAY GOLF PAVEMENTS | $3.5M |
| Dec 22, 2017 | Department of DefenseFA4814 6 CONS PK | 0010 | 236220 | IGF::OT::IGF PROVIDE REPAIR(SUS)BASE PAVEMENTS | $40K |
| Sep 27, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM411 | 236220 | IGF::OT::IGF NVZR 16-0093 RPR B55 | $3.1M |
| Sep 20, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM409 | 236220 | IGF::OT::IGF NVZR 16-0061-REPAIR AIRCRAFT FIRE TRAINER | $871K |
| Sep 18, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM410 | 236220 | IGF::OT::IGF CONSTRUCTION NVZR 16-0094, REPAIR BUILDING 56 FOR 6 MXG&ARS | $862K |
| Sep 7, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM408 | 236220 | IGF::OT::IGF PHASE I: DESIGN TO 100% - NVZR 16-0061 PHASE II: REPAIR - NVZR 16-0061 | $871K |
| Sep 6, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM407 | 236220 | IGF::OT::IGF REPAIR NVZR 16-0028 COMMAND POST, B54. | $338K |
| Sep 1, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM406 | 236220 | IGF::OT::IGF 17-0074-2 RPR HVAC MARCENT | $421K |
| Aug 10, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM403 | 236220 | IGF::OT::IGF CONSTRUCTION NVZR 16-0090 REPAIR BUILDING 9 (SATAF) | $590K |
| Aug 10, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM405 | 236220 | IGF::OT::IGF NVZR 16-0087 RPR H4 FOR ADDITIONAL KC-135'S | $1.3M |
| Jul 27, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM401 | 236220 | IGF::OT::IGF H5 WINDOWS&SIDING | $4.0M |
| Jul 20, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM404 | 236220 | IGF::OT::IGF PHASE I: REPAIR HANGAR 5 | $294K |
| Jun 20, 2017 | Department of DefenseFA4814 6 CONS PK | FA481417FM402 | 236220 | IGF::OT::IGF CONSTRUCT STORM WATER MANAGEMENT SYSTEMS FAC 1241 | $591K |
| Jun 14, 2017 | Department of DefenseFA4814 6 CONS PK | 0010 | 236220 | IGF::OT::IGF PROVIDE REPAIR(SUS)BASE PAVEMENTS | $576K |
| Apr 4, 2017 | Department of DefenseFA4407 375 CONS LGC | 2003 | 236220 | IGF::OT::IGF 932ND BLDG. 3650 CARPET&BATHROOM | $22K |
| Jan 19, 2017 | Department of DefenseFA4814 6 CONS PK | 0009 | 236220 | IGF::OT::IGF MUNITIONS STORAGE AREA (MSA) RENOVATION BLDG 839 | $62K |
| Jan 11, 2017 | Department of DefenseFA4814 6 CONS PK | 0003 | 236220 | IGF::OT::IGF REPAIR SOCCENT HVAC B1043 | $16K |
| Nov 30, 2016 | Department of DefenseFA4814 6 CONS PK | 0008 | 236220 | IGF::OT::IGF REPAIR VEHICLE MAINTENANCE OFFICES, BLDG 500 13-0136 | $8K |
| Nov 7, 2016 | Department of DefenseFA4814 6 CONS PK | 0006 | 236220 | IGF::OT::IGF DEMO/CONSOL VEHICLE OPS, B52 | $306K |
| Sep 29, 2016 | Department of DefenseFA4407 375 CONS LGC | 2003 | 236220 | IGF::OT::IGF 932ND BLDG. 3650 CARPET&BATHROOM | $134K |
| Sep 23, 2016 | Department of DefenseFA4814 6 CONS PK | 0012 | 236220 | IGF::OT::IGF FIBER OPTIC TO ALERT FACILITY 1105 | $421K |
| Sep 16, 2016 | Department of DefenseFA4814 6 CONS PK | 0007 | 236220 | IGF::OT::IGF DESIGN, CONSTRUCTION TO SCIF HVAC SECURITY CENTCOM | $106K |
| Jul 11, 2016 | Department of DefenseFA4814 6 CONS PK | 0008 | 236220 | IGF::OT::IGF REPAIR VEHICLE MAINTENANCE OFFICES, BLDG 500 13-0136 | $60K |
| Apr 14, 2016 | Department of DefenseFA4814 6 CONS PK | 0004 | 236220 | IGF::OT::IGF DESIGN BUILD STANDING SEAM METAL ROOF | $776K |
| Mar 25, 2016 | Department of DefenseW7M2 USPFO ACTIVITY FL ARNG | W911YN14C1001 | 236220 | IGF::OT::IGF LSGA082017, REPAIR AIRCRAFT MAINTENANCE | $129K |
| Mar 18, 2016 | Department of DefenseFA4814 6 CONS PK | 0002 | 236220 | IGF::OT::IGF PROVIDE DESIGN AND CONSTRUCTION FOR CNS DRUG DEMAND REDUCTION FACILITY 15-0055 | $971K |
| Dec 18, 2015 | Department of DefenseFA4814 6 CONS PK | 0073 | 236220 | IGF::OT::IGF REPAIR FITNESS CENTER DEFICIENCIES | $53K |
Get Alerted Before Abba Construction, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free